Krisorn Photian

E&I Commissioning Engineering and inspector at PT Medco Energi Internasional Tbk
  • Claim this Profile
Contact Information
Location
Chon Buri, Thailand, TH

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Oil and Gas
    • 200 - 300 Employee
    • E&I Commissioning Engineering and inspector
      • Feb 2019 - Present

      Work as E&I Commissioning Engineering and inspector for MEDCOENERGI - CMMS Engineer -Pre-Commissioning and Commissioning Project Bualubag fields new platform BLWPC, at BJCHI Yard Chonburi Thailand - Inspection installation and loop check of Electrical & Instruments Equipment. - Start up platform BLWPC at offshore the gulf of Thailand. - Wellhead control panel, Christmas trees and Chock valve system. - Export oil metering by micro motion ,Production test separator - HMI/SCADA System monitoring. - Power quality analysis for power supply and load shedding control system.and UPS system. - PDCS system - Harmonic filter system and troubleshooting - HVAC system - Communication system - Lighting system - Breaker ESP, VSD Vector for Production Well and Water Injection - Power Generators, control and supervise technical and resolve the problems. - Instrument Air Compressor and supervise technical and resolve the problems. - Pump motors. and supervise technical and resolve the problems. - Tubing and fitting inspection. - Permit to work, JSA, LOTO system - Set Up Preventive Maintenance Plan and CMMS in SAP System - Set up data upload for PCMS, Plant Condition Management Software Show less

    • Thailand
    • Oil and Gas
    • 700 & Above Employee
    • Lead Electrical and Instrumentation Engineer
      • Jul 2018 - Dec 2018

      -Lead E&I BC Major PM Project PM 8K Gas Booster Compressor Wellhead Platform --Permit to work, JAS, LOTO -Lead E&I BC Major PM Project PM 8K Gas Booster Compressor Wellhead Platform --Permit to work, JAS, LOTO

    • France
    • Industrial Machinery Manufacturing
    • E&I Commissioning
      • Mar 2017 - Jul 2018

      -Project Troubleshooting and Start up and Commissioning of gas compressor model JGE/4 ; --Permit to work, JAS, LOTO -Project Troubleshooting and Start up and Commissioning of gas compressor model JGE/4 ; --Permit to work, JAS, LOTO

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical and Instrument Level A and Production Operator
      • Jan 2005 - Jan 2017

      Project Jasmine and Banyen fields Field; January 05, 2005 – Dec 31. 2017 I worked initially as Electrical and Instrumentation and operator at Jasmine Oil field in Gulf of Thailand. Main duties were to maintenance and supported Production team on wellheads platform. The platform control room utility a SCADA system for monitoring process along with safety/Fire and oil systems. Crane operator class A on platform. The equipment in the field consists of normal equipment associated with a modern production platform including: - - 2005-2006 Work as E&I Engineering and inspector for Pearl Oil (Thailand) Project Jasmine Field, at CUEL Yard (Platform WPA) - Inspect installation of Instruments & Electrical Equipment. - Start up and commissioning platform WPA and worked as E&I Operator 0n platform 2006-2007 - 2007-2009 Work as E&I Engineering and inspector for Pearl Oil (Thailand) Project Jasmine Field, at CUEL Yard (Platform WPC) - Inspect installation of Instruments & Electrical Equipment. - Start up and Commissioning platform WPC - 2009-2017 Worked as E&I Operator level A on platform - Wellhead control panel, Christmas trees and Chock valve system. - Export oil metering by micro motion ,Production test separator Gas metering by micro motion, - Control system and troubleshooting (Rockwell product; SLC500) - Control Logix 5 and SCADA System monitoring (RSView 32, Factory talk) - Power quality analysis for power supply and load shedding control system. - Harmonic filter system. - Communication system - Lighting system - Gas detector system - GE ESP and Breaker ESP.VSD Vector for ESP - Diesel & Gas Power Generators, control and supervise technical and resolve problems. - Instrument Air & Gas Compressor for supervise technical and resolve problems. - PM 250 Hrs, 1500 Hrs, 6000 Hrs, of generator, air instrument, motor pump and annual PM and Maintenance Service. - Tubing and fitting install and modification. - Permit to work, JSA, LOTO system Show less

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • : Electrical and Instrument Mentor and Production Operator
      • Oct 1999 - May 2005

      I worked initially as Sr,Electrical and Instrumentation Mentor and Production Operator at Benchamas field and Tantawan Fiela,oil and gas field in Gulf of Thailand. Main duties were to maintenance and supported Production team on wellheads platform. The platform control room utility a SCADA system for monitoring process along with safety/Fire and oil systems. Crane operator class A on platform The equipment in the field consists of normal equipment associated with a modern production platform including:- - Inspect installation of Instruments & Electrical Equipment. - Start up and commissioning Benchamas field, Oct’ 1999- Nov”2002 - Rotation to work at Tantawan Field, Nov” 2002-Jan”2005 - Export oil metering by micro motion , Gas metering by micro motion ,Production test separator - Wellhead control panel , Christmas trees and Chock valve system - Control system and troubleshooting (Rockwell product; SLC500, ControlLogix 5 - SCADA System monitoring, HMI (RSView 32, Factory talk) - Power quality analysis for power supply. - Communication system - Lighting system - Gas detector system - Gas and Diesel Power Generators, Instrument Air & Gas Compressor supervise technical and resolve problems. and PM 250 Hrs, 1500 Hrs, 6000 Hrs, and annual PM and Maintenance Service - Operate well by gas lift compressor system and water flooding system - Tubing and fitting install and modification. - Permit to work, JAS, LOTO Show less

    • China
    • Textile Manufacturing
    • 1 - 100 Employee
    • Senior E&I Project Engineer. and Foreman Instrument For observe and start up TLP-2 Project
      • May 1997 - May 1999

      start up TLP-2 Project start up TLP-2 Project

    • Service and Engineer.
      • Mar 1995 - May 1997

Education

  • South East Asia University
    Bachelor of Engineering - BE, Electrical, Electronics and Communications Engineering
    1991 - 1995

Community

You need to have a working account to view this content. Click here to join now