Krishnamoorthy P

Projects Director at AMISTAD ONGPC
  • Claim this Profile
Contact Information
Location
United Arab Emirates, AE

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Projects Director
      • Jun 2019 - Present
    • Deputy Project Manager - Electrical & Instrumentation
      • Sep 2013 - Jun 2019

      1. Managing a team of 5 Lead Engineers & 1 Construction Manager with a total work force of 75 including Discipline project engineers, QC Engineers, Construction Manager, Superintend, Supervisor and Direct labor. 2. Involved in Projected scheduling, monitoring and control of project schedule along with progress report. 3. Preparation of Project Budget, Controlling the Project budget and prepare monthly report for each project. 4. Involved in writing up Project Execution Plan, preparing procurement control list, Construction Management Plan and Commissioning plan. 5. Continuous monitor, evaluate and improve project progress performance. 6. Reviewing tenders/bids and estimating the cost to obtain the award. 7. Manage Client relationship with company 8. Actively participate in client meetings and conduct weekly/monthly review meeting with project & construction team. 9. Effectively delegating projects and tasks to Project team. Show less

    • Project Engineer
      • Mar 2010 - Jun 2019

      Electrical and Instrumentation project management engineer, currently working for a tank form for Satorp in Saudi Responsibilities: • Engineering - Understanding the client requirements, Validating of all engineering documents & Quality documents are in procession with the client requirement & Planning, Forecasting and Delivering of all document deliverables in time. • Procurement - Generating Scope of Work document for vendors, Working with approved vendors in way to clarify their technical queries, terms &conditions, Validating the vendors technical bid in way to meet the client requirements, Validating all the vendors supporting documents like ITP, Quality plans etc., Making of Technical Bid Evaluation & Commercial Bid Tab, Proposing final vendors to management and Taking part as a lead role in the engineering & execution part with vendors. • Client Interfacing - Evolving the comments for the engineering document provided by client, Technical discussion with the specialist & ensuring of engineering data as per the requirement, Communicating and organizing any meeting schedule, Training and Testing, Preparing agenda for the meeting & points to be raised in the meeting, Providing weekly & monthly reports and Scheduling & arranging of Teleconference & on table discussion with other EPC. • Vendor Interfacing - Arranging & freezing agenda for Kick off Meeting & Pre-Inspection meeting, Arranging & reviewing the weekly & monthly project progressive meeting/reports, Arranging intermediate inspections & test with relevant documentations, Tracking of project progress with the project schedule, Scheduling, arranging and play a lead role for interface meeting with other EPCs, Responding for technical queries or get query closed from revenant technical specialist, Scheduling, arranging and attending of any vendor training, Scheduling of FAT & IFAT and Scheduling for training for Engineers, Maintenance and operators. Show less

    • Project Engineer
      • Jan 2010 - Sep 2013

      Project Involved (Role- Instrument Project Engineer) Project 1 - Saudi Aramco Total Refining and Petrochemical Co. (SATORP) Jun’11 – Nov’13 1. Client - Joint Venture SAUDI ARAMCO and TOTAL, Jubail, Saudi Arabia 2. Scope - EPCC of Refinery Tank Farms – a total of 74 tanks inclusive of 8 Bullet Tanks, Tankage, Piping, Mechanical & E&I Works 3. Project Cost - USD 800 Million Project Involved (Role- Instrument Project Engineer) Project 1 - Saudi Aramco Total Refining and Petrochemical Co. (SATORP) Jun’11 – Nov’13 1. Client - Joint Venture SAUDI ARAMCO and TOTAL, Jubail, Saudi Arabia 2. Scope - EPCC of Refinery Tank Farms – a total of 74 tanks inclusive of 8 Bullet Tanks, Tankage, Piping, Mechanical & E&I Works 3. Project Cost - USD 800 Million

    • Sr Engineer - Client Interfacing Group
      • Jul 2006 - Dec 2009

      Project Involved (Role- Senior Engineer)1. Liquid Fabric Enhancer Formulation Plant, Jyothi Laboratories, Himachal Pradesh, India (2007)2. Manufacturing Execution System and Networking, Ashok Leyland, Chennai, India (2007)3. Natural Gas Pipe Line Project, GAIL, Rajahmundry, Andhra Pradesh, India (2008)4. Crude Oil Extraction Project, Capacity: (30K BPD), Cairn Energy, Rajasthan, India (2008)5. Chemical Dosing System, Cairn Energy, Yanam, Andra Pradesh, India (2009)6. Hypo chlorination Plant, Adani Power Projects, Gujarat, India (2009) Show less

    • Senior Sales Engineer
      • Jun 2006 - Dec 2009

Education

  • Anna university, Maharaja engineering college
    Bachelor of Engineering (B.E.), Mechatronics
    2002 - 2006
  • PMHSS
    Bachelor of Engineering (BE), Mechatronics
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now