PT Phoenix Resources International
-
Indonesia
-
Manufacturing
-
100 - 200 Employee
-
Instrumentation and Control Engineer
-
Oct 2022 - Present
# Mega Project BCTMP Chip Mill : Power Plant (3x150 MW) WTP (37500 m3/Day) BCTMP (2500T/Day) FlashDryer Peroxide H202 Wood Handling Plant ETP # Design review, developed and implemented of Engineering submission from OEM Finland Andritz and Valmet. # Mega Project BCTMP Chip Mill : Power Plant (3x150 MW) WTP (37500 m3/Day) BCTMP (2500T/Day) FlashDryer Peroxide H202 Wood Handling Plant ETP # Design review, developed and implemented of Engineering submission from OEM Finland Andritz and Valmet.
-
-
-
Louis Dreyfus Company
-
Netherlands
-
Food and Beverage Manufacturing
-
700 & Above Employee
-
PLC Specialist & Instrument Supervisor
-
Apr 2022 - Oct 2022
- Maintaining & ensuring control system integrity (PLC's, HMI's, DCS, CSD). - Review, design & execute changes as per requirement PSM documents. - Ensure server management and backups (DCS server, Tank Gauging Server, OPC Server) - Ensure the backup is ready to use by simulate on Vmware workstations - Train teams for all control system. - Development & Implementation of FMEA mitigation task list of process critical, safety critical & other non critical. - Spares inventory mangement, preparation of spares budget Opex, Capex & order. Show less
-
-
-
Musim Mas Group
-
Indonesia
-
International Trade and Development
-
700 & Above Employee
-
Electrical Instrument & Automation Engineer
-
Sep 2019 - Apr 2022
For maintenance : - Scheduled manpower distribution for everyday works to Implemented preventive and predictive maintenance practices and upheld equipment guidelines to reduce downtime - Perform all E&I troubleshooting, maintenance including execute calibration scheduling. - Manage spares for all fields instrument and SCADA. - Execute all changes in Yokogawa Centum VP DCS & S71500 DCS hybrid systems ; pid tuning, hmi design modified, etc. - Attend plant call outs during plant emergencies & shutdown. - Completely to improve of any complex sequencial system PLC's as per MOC document requested ; Design and implementation of a new control process sequence on automatic mode of waste water that increased production speed and accuracy by 98% than manual operating For Project : ** Solvent fractionation (SFD) and specialty surfactant product (SSP) or chemicals plant and including power plant steam boiler 45 T, Desalination and WTP. (1000 I/O list per area) ; - Co-ordinated and supervise onsite installations, testing and commissioning test applied. - Co-ordinated and supervise project onsite construction, testing and commissioning test applied based on datasheet, hookup drawing, cabling and tray scheduling and fields instruments standart installation. - Hands on field of instruments, pneumatic system installation: circuit continuity, calibration and tested electrical systems also prepared the materials needed. - Review and comments of vendor activities during on development HMI design and interface of DCS. Show less
-
-
-
Freelance
-
Bontang, East Kalimantan, Indonesia
-
PLC Programmer
-
Jan 2022 - Feb 2022
- Program modified of Failsafe PLC S7 series. - Design and Write a new WINCC Advanced HMI graphic - Implemented into Thermax Boiler System Customer Plant - Perform Commissionng FAT till startup test. - Program modified of Failsafe PLC S7 series. - Design and Write a new WINCC Advanced HMI graphic - Implemented into Thermax Boiler System Customer Plant - Perform Commissionng FAT till startup test.
-
-
-
PT Samora Usaha Makmur (SAMORA Group)
-
Indonesia
-
Food Production
-
1 - 100 Employee
-
Automation Maintenance Specialist
-
Sep 2018 - Sep 2019
PT. Medan Sugar Industry - Medan - Contributed on TPM strategy by ensure best practice of maintained regular service schedules for SCADA system such as Backup or restore HMI server/client, verify PID parameter, analog signal calibration, PLC and protocols inspection, sensors signal loop testing and completed documentation. - Performed commissioning test of modification packaging system I/O by write new additional program of PLC’s. - Completed continuous improvement program by modify the panel led manual indicator to be automatic control by adding or wrote new HMI program include trending historical of Hydraulic Filter Press system. Show less
-
-
-
Apical
-
Indonesia
-
Food Production
-
700 & Above Employee
-
Electrical Instrument Project Staff
-
Dec 2017 - Sep 2018
- Installation, verify and test of different kinds of pneumatics and electronic transmitter applied in oil palm refinery plant such as gauge, pressure regulating valve, temperature, pressure, flow, level, smart transmitters, control valve, smart positioner, and solenoid valves. - Installed and wired electrical hardware, including junction boxes, service panels, electrical boxes, switches and circuit breakers. - Reviewed diagram and relevant codes to complete task safely and accurately - Installation, verify and test of different kinds of pneumatics and electronic transmitter applied in oil palm refinery plant such as gauge, pressure regulating valve, temperature, pressure, flow, level, smart transmitters, control valve, smart positioner, and solenoid valves. - Installed and wired electrical hardware, including junction boxes, service panels, electrical boxes, switches and circuit breakers. - Reviewed diagram and relevant codes to complete task safely and accurately
-
-
-
PT Bakrie Sumatera Plantations Tbk
-
Indonesia
-
Farming
-
300 - 400 Employee
-
Automation Assistant (Intern)
-
Sep 2017 - Dec 2017
- Worked under DCS Engineer to learn and develop distributed control system knowledge. - Assist the engineer to supervised contractors of installation and commissioning test of DCS Yokogawa applied in new Fatty Acid oleo chemical Plant - Support engineer by tested of continuity of circuits using test equipment to verify compatibility and safety of system following installation, replacement or repair. - Worked under DCS Engineer to learn and develop distributed control system knowledge. - Assist the engineer to supervised contractors of installation and commissioning test of DCS Yokogawa applied in new Fatty Acid oleo chemical Plant - Support engineer by tested of continuity of circuits using test equipment to verify compatibility and safety of system following installation, replacement or repair.
-
-