Kowou Teteh
MGard at Fortress Interlocks- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Bachelor Honours of Sciences in Applied Electronics
Waterford Institute of Technology
Experience
-
Fortress Safety
-
United Kingdom
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
MGard
-
Jul 2016 - Present
6/2016 to date Electrical Assembly/Soldering/Testing Fortress Interlocks- 2 Inverclyde Drive, Wolverhampton, WV4 6FB Mgard Section Premier range of trapped key interlocks for industrial safety applications, final assembly section Duties: • Read orders, assembling effectively locks required by the customers • Select the list of parts to complete the order and send them through the software create it by the company to the parts pickers • PSW,PSH,PE,PS,PL 4 units in one special assembly PSW Bernstein Switch modules section PSH ¾ Valves ports, handle operated module system unit PE Blank spacing ADDON between PSH and PS PS Lock with switch modules unit PL ADDON Lock Module section Two ways assembling technique depending on customer request 1 Valve is closed Bernstein limit switch is in neutral 2 Valve is open Bernstein limit switch is in neutral • Santon Switches 5 and 2 poles special assembling with locks 2 Poles, Key trapped at 9’Oclock, free at 12 and 3’Oclock 5 poles, Key Free at 12’Oclock and Trapped at 3’Oclock • SS4 in Bespoke Enclosure unit. Two important steps of testing technology -Testing electronically the solenoid plunger after building SS4 through electro-mechnical assembly -Testing two Green and blue pushes buttons lamps after effective wiring by referring to the drawing for this job. Complete the job by making the override key cover hose screwed it and riveted it to the lid plate • Mgard Special assembly SS4 associated with special cams and 2 runners bar technique • DM(S) Multiple Door interlocks, Two actuator entry points. • DMSE2 Multiple Door interlocks- Forced safety key extraction • DMSK single Door Hygienic Interlock
-
-
-
-
Data centre operative
-
Jan 2010 - Jul 2010
-
-
-
-
Network System
-
Jan 2010 - Jul 2010
updating the physical Network system -Room environmental -Temperature Recording and Airflow from networks Cabinets - Networks Racks Elevations - Switch to Patch Panels -Switch to Fibre Paneles -Check and record data outlets in the rooms and offices in the company updating the physical Network system -Room environmental -Temperature Recording and Airflow from networks Cabinets - Networks Racks Elevations - Switch to Patch Panels -Switch to Fibre Paneles -Check and record data outlets in the rooms and offices in the company
-
-
Education
-
Waterford Institute of Technology
Bachelor of Science (Honours), Applied Economics -
Waterford Institute of Technology
Bacher, Bachelor honours of Science in Applied Electronics