KOTHANDARAMAN SRINIVASAN

Associate PHE & Life safety at AECOM INDIA PRIVATE LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mumbai, Maharashtra, India, IN
Languages
  • English Professional working proficiency
  • Tamil Professional working proficiency
  • Hindi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Milind Saraf

Outstanding management skill and Produced great results for the Company.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Transitioning from Waterfall to Agile Project Management
    LinkedIn
    Nov, 2021
    - Oct, 2024
  • Project Management Foundations
    LinkedIn
    Mar, 2021
    - Oct, 2024
  • Building Relationships While Working from Home
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Communicating in the Language of Leadership
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Creating Great First Impressions
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Green Building Concepts Foundations
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Introducing the PMBOK® Guide—Seventh Edition
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Introduction to LEED Certification
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Learning Microsoft Project
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Learning Personal Branding
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Scrum: The Basics
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • The Six Morning Habits of High Performers
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • Tips for Writing Business Emails
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • What Is Scrum?
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • What Is a PMO?
    LinkedIn
    Sep, 2020
    - Oct, 2024
  • PMP Certification, 9 Knowledge Areas, PMBOK Guie 4th Edition
    Effective Project Management Consultancy, Mumbai
    Dec, 2012
    - Oct, 2024
  • Application - Installation - Operation - Maintenance of UL/FM Approved RB Fire Pumps
    R-B Pump Co, Baxley, GA, USA.,
    Sep, 2004
    - Oct, 2024
  • FireCad
    Tyco Fire & Security Asia, Singapore.
    Jun, 2000
    - Oct, 2024

Experience

    • India
    • Architecture and Planning
    • 400 - 500 Employee
    • Associate PHE & Life safety
      • Feb 2022 - Present

       Steering Mechanical Team & delivering Pre-bid & Post-bid Support to internal stakeholders (BDT, SCM & PMT)  Generating & scrutinizing preliminary calculations, specifications, and BOQ of Life Safety Systems of Commercial and Industrial Projects  Drafting Vendor Technical Evaluation Sheet & assisting the Client SCM & PMT with the finalization of the vendor  Evaluated Engineering Calculations, & Shop Drawings of systems for the Commercial and Industrial Projects  Delivering Commercial & Technical support to PMT for validating/rejecting variation claims raised by subcontractors, the closing of NCR issued by the Owner’s Engineer, & Civil Defense Comments  Liaising with Internal & External Stakeholders to prepare Life Safety System Services Drawings, Builder's Works Drawings etc. Show less

    • Sr. Manager - MEP
      • Feb 2018 - Nov 2020

       Steering Mechanical Team & delivering Pre-bid & Post-bid Support to internal stakeholders (BDT, SCM & PMT)  Generating & scrutinizing preliminary calculations, specification, BOQ of HVAC, PHE & Life Safety Systems of Solar PV Plant Substations  Drafting Vendor Technical Evaluation Sheet & driving SCM & PMT for the finalization of the vendor  Evaluated Engineering Calculations, & Shop Drawings of systems for the Solar PV Plant Substations  Delivering Commercial & Technical support to PMT for validating/rejecting variation claims raised by subcontractors, the closing of NCR issued by Owner’s Engineer, & Civil Defense Comments  Liaising with Internal & External Stakeholders to prepare MEP Coordinated Services Drawings, Builders Works Drawings, and so on Key Projects: (total Pre & Post Bid Projects are 24+) Pre-Bid: Qatar General Electricity &Water Corporation - Qatar - 900 Mw, Sudair - Kingdom of Saudi Arabia - 2000 Mw, Emirates Water & Electricity Company - Abu Dhabi - 1500 Mw, Renewable Energy Project Development Office Kingdom of Saudi Arabia - 1400 Mw Post-Bid: Word Largest Single-Site Solar Project, Noor Abu Dhabi - Sweihan, - 1,177 Mw, Amin - Oman - 100 Mw, Maan - Jordan -50 Mw, Sohar - Oman - 25 Mw, Sudair - KSA - 2000 Mw Show less

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Sr. Manager - MEP
      • Mar 2016 - Feb 2018

       Managing Tendering & Estimation of complex MEP works  Analyzing tender documents, conducting technical review including verifying Tender Specifications, Drawings, BOQ’s and addressing incomplete data by raising pertinent RFIs to the client on the discrepancies and securing required clarifications before preparations of a comprehensive and detailed Techno-Commercial offer  Heading Estimation Team and a team of Quantity Surveyors to validate & adopt an ideal design parameter, material specification, quantities, and most competitive prices  Analyzing the possibility of potential Value Engineering options substitution of alternative equipment or materials without compromising design intent and advising the same as an option to the client at the time of tendering  Compiling & floating inquiries and gathering quotations from various vendors; evaluating the same to ensure the compliance with project specifications, Drawings, BOQ’s, and that there are no technical deviations  Conducting review with In-house Planning Department on client desired projected completion schedule and ensuring its feasibility, in case if the client given project time frames are not achievable  Drafting & submitting a realistic working program following C 14, considering the main contractors' schedules and by incorporating other follow on trades  Collaborating with Estimation Team Members to submit the tender on time Show less

    • Project Manager - PHE & Life Safety
      • May 2014 - Jul 2015

       Managing Tendering & Estimation of complex MEP works  Analyzing tender documents, conducting technical review including verifying Tender Specifications, Drawings, BOQ’s and addressing incomplete data by raising pertinent RFIs to the client on the discrepancies and securing required clarifications before preparations of a comprehensive and detailed Techno-Commercial offer  Heading Estimation Team and a team of Quantity Surveyors to validate & adopt an ideal design parameter, material specification, quantities, and most competitive prices  Analyzing the possibility of potential Value Engineering options substitution of alternative equipment or materials without compromising design intent and advising the same as an option to the client at the time of tendering  Compiling & floating inquiries and gathering quotations from various vendors; evaluating the same to ensure the compliance with project specifications, Drawings, BOQ’s, and that there are no technical deviations  Conducting review with In-house Planning Department on client desired projected completion schedule and ensuring its feasibility, in case if the client given project time frames are not achievable  Drafting & submitting a realistic working program following C 14, considering the main contractors' schedules and by incorporating other follow on trades  Collaborating with Estimation Team Members to submit the tender on time Projects Tendered are: Doha Festival City, Mega reservoir, Salwa Beach Resort, Doha Oasis – Qatar, Medcare Hospital, W Hotel – Dubai & Al Maryah Plaza - Abu Dhabi. Show less

    • Real Estate
    • 1 - 100 Employee
    • General Manager - MEP Design
      • Apr 2012 - Feb 2013

       Preparing required documents to secure approvals from MOEF, HRC by coordinating with Liaison Team / MOEF Consultant  Following up with MEP Consultant for MEP Tender Documents, RWH Consultant for their design & verifying that the tender documents are in line with requirements of local norm, codes & company policy and issuing approvals to Projects Department to release the Tenders  Conducting meetings with Architects, MEP Consultants, Site Team for release of final design and issued for Construction Drawings (IFC) for the site execution  Providing technical support for Plumbing & Life Safety Systems  Scrutinizing & approving Technical Submittals, Design Basis Reports, Design Drawings of Plumbing and Life Safety Systems, as well as Mockups Projects Handled are: Casa Univis I & II (12 + 14 Total 26 Towers each Comprising Ground + 31 typical floors); Lodha Venizia (2 Towers each of 72 floors Comprising of 3 Basements + Ground and 68 typical floors); New Cuff Parade (8 Towers Each of 65 floors Comprising of 4 Basements + Ground and 60 typical floors). Show less

    • Computers and Electronics Manufacturing
    • 700 & Above Employee
    • Project Manager - PHE & Life Safety
      • Jul 2004 - Mar 2012

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy  Attending Coordination Meeting with various ID Consultants, Contractors, & Client and implementing the requirements  Maintaining a record of all drawing logs for Reflected Ceiling Plans, Builders Work Drawings for the onward submission to the ID Contractors through Main Contractor for proper coordination  Conducting regular site inspections, & site walk with Construction Team, Contractors, Consultant, & Client to comply with their requirements and preparing Minutes of Meeting where required  Attending regular Closeout meetings with Contractors, MEP Consultant, & Client to ensure compliance with their job requirement  Coordinating with Suppliers, OEM’s to assist the MEP Contractor to obtain O&M manuals, recommend Spare Parts List, Warranty Certificates for compiling the O&M Manuals, & Training Manuals of Planned Preventive Maintenance as per project specification & client’s requirements  Collaborating with various Suppliers and Specialist Subcontractors for initiating for Civil Defence Authority Inspection and Approvals thereafter  Liaising with internal MEP Engineering Team and consolidating a detailed Asset Register for the client’s future use  Coordinating with Document Control Team in compilation & submission of all approved T&C Documents, As-built Drawings, O&M and Training Manuals  Supervising installation, testing & commissioning of GI/GRP/HDPE Piping works of Fire Protection, Water Supply & HVAC Systems. Show less

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2002 - Nov 2003

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy Projects Handled are: Designed and supervised the entire Installation of Life Safety System for Emirates Palace Hotel (formerly known as Conference Palace Hotel - CPH PB-08 & PB-09A); Six Commercial and Residential Building, Abu Dhabi, UAE. Show less

    • Senior Design / Project Engineer
      • Mar 2001 - Jul 2002

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy Achievements: Received a Letter of Appreciation for handling Design, Estimation & Procurement of various Projects in SOBHA Projects & Trade Pvt. Ltd, Bangalore. Projects Handled are: Designed and supervised the entire Installation of Life Safety System for Software Tech. Park – Hubli, GE BEL – Whitefield, White House, Golden Millennia, Purva Heights, Bangalore. Show less

    • Design Engineer
      • Dec 1999 - Feb 2001

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy Achievements: Selected from the Design and Engineering Team of Tyco, Bangalore to attend a Fire Cad Training Program held at Tyco Fire & Security, Singapore. Projects Handled are In Alert Safety (Tyco) the jobs that were looked after by me are Hercules Specialty Chemicals – Hoskotte, Sai Lakshmi Spinning Mill – Mysore. Show less

    • United Arab Emirates
    • Retail
    • 700 & Above Employee
    • Estimator
      • Aug 1997 - Nov 1999

      Worked as an Estimator in Juma Al Majid Est., Klockner Moeller Switchgear Division. Worked as an Estimator in Juma Al Majid Est., Klockner Moeller Switchgear Division.

    • Estimator
      • Sep 1995 - Jul 1997

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy Show less

    • Estimator
      • Jun 1993 - Jul 1995

       Contributing in preparation of Design Drawings, Hydraulic Calculations, Submittals & Cost Estimation of Life Safety Systems (i.e. Sprinkler System, Standpipe System, Foam System, Water Mist System, Fire Alarm System, Gas Suppression System, VESDA System)  Coordinating with Clients/Consultants/Contractors for approval of shop drawings, material submittals and site inspections  Conducting site study/survey and creating As-Built Drawings by assigning a Team of CAD Resources and verifying the same for accuracy Show less

Education

  • Karnataka State Open University
    Bachelor of Technology (BTech), Electrical and Electronics Engineering
    2011 - 2014
  • NILEM
    Diploma in Fire & Safety Management, Fire & Safety Management
    2000 - 2001
  • M N M JAIN POLYTECHNIC
    Diploma in Electrical and Electronics Engineering, Electrical and Electronics Engineering
    1989 - 1992

Community

You need to have a working account to view this content. Click here to join now