Kostyantyn Naumenko
Head of Radioplanning & Optimisation Unit at Vodafone Ukraine- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Vodafone Ukraine
-
Ukraine
-
Telecommunications
-
200 - 300 Employee
-
Head of Radioplanning & Optimisation Unit
-
Aug 2016 - Present
-
-
-
Київстар
-
Ukraine
-
Telecommunications
-
700 & Above Employee
-
Senior Engineer at BSS planning department
-
Oct 2015 - Aug 2016
-
-
-
MTS Group
-
Russian Federation
-
Telecommunications
-
700 & Above Employee
-
Team Leader of the Planning radio subsystem
-
Jan 2015 - Oct 2015
Organization of work of Team, responsible for the RAN in a project of development of 3G network in MTS Ukraine.
-
-
Senior RF Engineer Radionetwork Group
-
Jan 2011 - Jan 2015
Senior RF Engineer of Radionetwork Group Radio Access Technologies Department responsible for 2G/3G Network development in 5 regions of Ukraine including Kiev. - 2G/3G Cell planning for indoor and outdoor (planing physical parameters (azimuths, heights, tilts), frequency planning, neigbours planing, parameter planing); - 2G/3G Capacity planing (analizing traffic values, time dependence (e.g. public holidays), TA values, field data (e.g. marketplaces, recreation areas), preparing nominal cell plan); - Handling with customers complains (e.g. coverage problem, quality problem); - Customer complaints handling (situation analysis, Network changes decision making, requests issue); - Day-to-day monitoring and analyzing network performance statistics (e.g. Call Drop Rate, HR Usage, TCH Blocking Rate), preparing initiatives for the imrooving KPIs (e.g. frequency changing, neighbor lists changing, azimuth changing, parameter modification).
-
-
RF Engineer (1st Cathegory)
-
Oct 2009 - Jan 2011
1st Cathegory RF Engineer managing 2 RF Engineers team. - Frequency and Network Parameters planning in 3 central regions of Ukraine (frequency planning for new sites, site extensions using Planet 4.0 - automatical and manual fr. planning in hard frequency lack conditions);- Planning of new GSM Base stations (Siemens BS-240, BS-240XL). Choosing of BTS locations and configurations. - GSM Radio network optimization. Project management of network topology optimization (tilts, azimuths), frequency plan optimization;- BSS parameters optimization (GSM/GPRS). - GSM network capacity improvement, creating orders for transceivers/BTS movement due to traffic allocation;- Monitoring of radio network statistics, problems detection and troubleshooting and monitoring of the main KPIs;
-
-
RF Engineer
-
Mar 2007 - Oct 2009
-
-
-
Ukrainian Mobile Communications
-
Ukraine
-
Telecommunications
-
1 - 100 Employee
-
Trainee for the RNP Engineer
-
Oct 2006 - Mar 2007
Day-to-day monitoring and analyzing network performance statistics (e.g. Call Drop Rate, HR Usage, TCH Blocking Rate), preparing initiatives for improving KPIs (e.g. frequency changing, neighbor lists changing, antenna layout changing, parameter modification) Day-to-day monitoring and analyzing network performance statistics (e.g. Call Drop Rate, HR Usage, TCH Blocking Rate), preparing initiatives for improving KPIs (e.g. frequency changing, neighbor lists changing, antenna layout changing, parameter modification)
-
-
Education
-
National Technical University of Ukraine 'Kyiv Polytechnic Institute'
master, Radioengineering