Knut Øvreseth

Project Engineering at Aventi Technology AS
  • Claim this Profile
Contact Information
Location
Oslo, Oslo, Norway, NO

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Industrial Automation
    • Project Engineering
      • Aug 2015 - Present

      2015 - 2021 QA-responsible• New graphical interface and content of QA and HSE system for Aventi Technology and Aventi Installation• New QA and HSE system for installation of all electrical equipment for tunnels. New project and office instructions, routines, checklists and templates.• Certified ISO 9001, 45001 and 14001 spring 20202020 - 2021 Project Engineer, Takeda• Design av Rockwell Plant PAX for BMS for medical factory• Electrical design, cable lists, functional description and test procedures• Production of cabinets, HMII and PLC programming.• Commissioning and startup2021 Project Engineer, Stadionlaks (Bein)• Study for building 2 movable bulkheads (15mx15m) that goes around channel for offshore fish farming• Self-propagating bulkhead for cleaning and moving fish• 1 of 2 critical components in addition to concrete barge• Instrumentation and functionality in addition to assistance to electrical and price estimate2021 Project Engineer, Fortum• Upgrade of 2 water boiler and 1 steam boiler at Rikshospitalet• Functional description and SCD (System Control Diagrams)2020 - 2021 Project Engineer, Novenco, HVAC Tortue Topside• HVAC on FPSO• Electrical design and programming of HMI• Test procedures, testing and FAT of system2019-2021 Project Engineer, Wartsila Inert Gas• Inert gas packages for 3 FPSOs.• Programming HMI and assistance with PLC programming• Commissioning and test of packages at Wartsila2015- 2019_ Road tunnel RV80 Bodøelv - Hundstadmoen (2016-2019)• Detail design SRO and field.• Programming of PLC• Test OPC interface and connection with Central Control• Design and testing of low voltage and road panels• Cable list and control plan• Commissioning and startup Show less

    • Specialist Engineer
      • Jul 2011 - Jul 2015

      Project: Aibel/Statoil, Åsgard Subsea CompressionResponsibilities:• New Kongsberg Maritime AIM DCS system installed at K-lab for new test loop.• Engineering and testing of a Subsea Compressor Pilot (replica with more instrumentation) at the Kårstø plant. • Design for programming and instrumentation loops for test of subsea compressors, (SCDs, C&E, i/o-list, ESD, PCS, PSD, F&G) as part of the Aibel team.• Engineering changes and commissioning of test loop and compressor as part of the Statoil team from 01.07.2013. Show less

    • Spesialist Engineer
      • Jan 2008 - Jun 2011

      Project: Statoil, Kårstø Plant: CY2008 and KEP2010Responsibilities:• Rewheeling of compressor (CY2008) • Upgrading of control system and instrumentation for 7 compressors (KEP2010)• Engineering of SCDs (NORSOK).• New anti-surge control in DCS system.• Commissioning and start-up

    • Specialist Engineer
      • Jan 2006 - Dec 2007

      Project: Statoil, Melkøya LNG PlantResponsibilities:• Commissioning and startup of 5x46MW LM6000 gas turbines (Nuevo Pignone). • Commissioning and start-up of compressors. o Nuovo Pignone cooling compressors: 2x64MW and 1x34MW with electrical VSDS drives.o Siemens Compressors: 1x27MW with electrical VSDS driver and other single speed compressors.• Commissioning of the Bently Nevada system 1.

    • Project Engineer
      • Jan 2003 - Dec 2005

      Project: M.W. Kellogg Ltd. Kårstø Expansion Project 2005Responsibilities:• 18 months in London (engineering) and 18 months at Kårstø (engineering, commissioning, start-up and dynamic testing). Rotating equipment and process control. Responsible for the major packages: Narratives, interfaces, CCC functionality, instrumentation, FAT, start-up, etc.• Responsible for process control for whole project after project moved to Kårstø. Control Narratives, PSD and ESD C&E.• New major packages: Turboexpander with magnetic bearings (GE Rotoflow), Sales gas compressor with 40 MW electric motor (Dresser-Rand), 2 boilers (Foster Wheeler and Mitsui-Babcock).• Responsible for upgrading existing compressors for running them in parallel. Propane refrigeration compressors (7 MW el. Motor) and ethane overhead compressors (steam driven).• Dynamic simulation at Aspentech. Implementation of flow reduction due to downstream upsets Show less

    • Project Engineer
      • Jul 2002 - Dec 2002

      Project: ABB, Baggage Handling SystemResponsibilities:• Programming of baggage handling system for Helsinki Airport.Programming of check-in desks, conveyor control, tracking and sorting to bins, controller Omron PLC’s.

    • Project Engineer
      • Mar 2001 - Jun 2002

      Project: General Electric, Power Gas TurbinesResponsibilities:• New general commissioning procedure for GE Norway with automatic generating of component test sheets from i/o-list.• Follow-up, engineering and approval of documentation and equipment for El Paso.• Commissioning of Teco (Virginia, USA) with 4 additional LM6000PC turbines.• Senior commissioning engineer El Paso (Macaé, Brasil) with 20 LM6000PC Gas Turbines (The worlds largest aeroderivative gas turbine power plant). Responsible control, electro, vibration monitoring, loop-test, start-up and design changes on site. Trouble shooting during operation. Show less

    • Project Engineer
      • Feb 2000 - Feb 2001

      Project: Dresser-Rand AS, Gas Turbine Power GenerationResponsibilities: • Responsible for hot loop test, and start-up of LM6000 DLE (50 MW) power turbines in France. • Montoir: Loop-testing of one gas turbine (LM6000 DLE) up to Woodward control system.• Condat: Loop-testing and start up of two LM6000 DLE turbines.

    • Project Engineer
      • Apr 1997 - Feb 2000

      Project: Kongsberg Simrad AS, Vessel Management SystemsResponsibilities: • Design and programming of a Vessel Control System (power, thruster, ballast, etc.). Using GMS-graphical interface and AIM-3000 for configuration. Responsible for configuration database. • Main responsible for programming and commissioning on Arca, for the Dutch Coast Guard (multi purpose vessel).• Responsible for essential generators, power management, trusters and hydraulic power unit on Åsgard A, Statoil (production ship). • Configuration of ballast and cargo for Saipem 10000 (drill ship).• Configuration ballast, cargo and aux. machinery for Navis Explorer (drill ship). Commissioning of overall system during crossing of the Atlantic Ocean.• Configuration and commissioning thrusters and HVAC West Navion (drill ship).• Overall responsible for design, configuration and FAT for shuttle tanker for Leif Høegh. Show less

Education

  • UMIST, University of Manchester Institute of Science and Technology
    Master of Science (M.Sc.), Control and information Technology
    1994 - 1995
  • UMIST, University of Manchester Institute of Science and Technology
    Bachelor of Engineering (B.Eng.), Communication and Control
    1992 - 1995
  • Bergen Ingeniørhøyskole
    Ingeniør, Automatiseringstikk
    1988 - 1991

Community

You need to have a working account to view this content. Click here to join now