Knut Arne Naas
Red seal journeyman sheet metal worker at EastsideVentilation- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
EastsideVentilation
-
Construction
-
1 - 100 Employee
-
Red seal journeyman sheet metal worker
-
Sep 2022 - Present
-
-
-
-
Red Seal Journeyman Sheet Metal Worker
-
Mar 2020 - Sep 2022
I have been working on residential buildings/condos. Installing ducts, pipes, V-tac's, fire-dampers, HRV's & ERV's, fan-coils, plenums, bath fans, OTR's. I have been working on residential buildings/condos. Installing ducts, pipes, V-tac's, fire-dampers, HRV's & ERV's, fan-coils, plenums, bath fans, OTR's.
-
-
-
NRG Management
-
Canada
-
Construction
-
1 - 100 Employee
-
Red seal journeyman HVAC sheet metal worker
-
Oct 2017 - Nov 2019
installing fire-dampers, ductwork, RTU's, MUA units, HRV's +++. installing fire-dampers, ductwork, RTU's, MUA units, HRV's +++.
-
-
-
-
Helper technician.
-
Jun 2017 - Oct 2017
Tested fire-dampers, helped technician to balance ventilation & hydronics. Tested fire-dampers, helped technician to balance ventilation & hydronics.
-
-
-
Oras AS
-
France
-
Accounting
-
Technical sitemanager/Team leader
-
Jan 2014 - Apr 2017
Site manager at a Project:( Bodø VGS (trade School)) January 2014 to August 2015. Supervised hired hands at the Project. Communicated with the main entrepreneur (monthly reports, emails, quality reporting and Meetings) ordering of parts and equipment (supply air diffusers, VAV, CAV, extract air valves, intake/exhaust grilles and roof Hoods) August to present: Lade Allè: (Project) Installing ventilation in parking cellar and storage area for an Apartment complex, taking measurements of ducts for technical rooms, installing ducts and automation Equipment for ventilation units. Ringve Park: (Project) Managed the first building step with 99 units Apartment complex, balancing apartments in the same Project. Nortura Malvik: (project) Worked as installer, installing stainless ducts dimensions ranging from Ø250-Ø1000. Installed 3 ventilation units. Became team leader on the last part of the project, installed ventilation in a cold storage hall, containing 2 small structures, 1 office and 1 member shop with their own balanced ventilation units. Ordered everything of equipment except for the ventilation units and smoke fans. Installed 2 smoke evacuation fans inside the hall. Sandfjæra daycare: Worked as a installer, Installed circular and square ducts, also fabric duct, 1 ventilation unit, installed VAV and CAV dampers. Show less
-
-
-
Caverion
-
Finland
-
Facilities Services
-
700 & Above Employee
-
Ventilation installer, service technichan.
-
Jan 2010 - Jan 2014
January 2010 - July 2013: Ventilation installer. July 2013 - January 2014: Balancing and commissioning ventilation systems/units. January 2010 - July 2013: Ventilation installer. July 2013 - January 2014: Balancing and commissioning ventilation systems/units.
-
-
-
-
Operator
-
Oct 2008 - Jan 2010
Worked as sheet metal worker, and ventilation installer, Was also hired out to Aker Solutions Stord where I was working with commissioning of 2 semi submercible rigs, Aker Spitsbergen & Aker Barents. Worked as plumber, mechanic & HVAC. Worked as sheet metal worker, and ventilation installer, Was also hired out to Aker Solutions Stord where I was working with commissioning of 2 semi submercible rigs, Aker Spitsbergen & Aker Barents. Worked as plumber, mechanic & HVAC.
-
-
-
-
Mechanic/chrome operator
-
Jun 2007 - Oct 2008
I started as a mechanic to finish my education as an industrial mechanic. Took over the chrome operation of piston rods at the shop after a while. I started as a mechanic to finish my education as an industrial mechanic. Took over the chrome operation of piston rods at the shop after a while.
-
-
-
Elnan AS
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Ventilation installer / team leader.
-
Apr 1998 - Jun 2007
Started as an Apprentice in 1998, became journeyman in 2001. Worked as an installer til 2004 then I became a team leader, was teamleader til 2007. Started as an Apprentice in 1998, became journeyman in 2001. Worked as an installer til 2004 then I became a team leader, was teamleader til 2007.
-
-
Education
-
Nauma vidregående skole Namsos
Industrimekaniker/Industrial mechanic -
Offshoreutdanning.no
well and drilling technique