Kirthan Shetty

Construction Manager at Gulf Petrochemical Services & Trading LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN
Languages
  • English -
  • Hindi -
  • Kannada -
  • Malayalam -
  • tulu -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • experience
    -

Experience

    • Oil and Gas
    • 400 - 500 Employee
    • Construction Manager
      • Jan 2017 - Present

      Execution of all the construction activities of civil.mechanical.electrical,instrumentation and support services for EPCC work related to Petroleum Development Oman at Bahja cluster.Present projects and shutdown activities are ongoing at Suwaith,Sayyala,Zaulia,Howqa,and Sahma. Execution of all the construction activities of civil.mechanical.electrical,instrumentation and support services for EPCC work related to Petroleum Development Oman at Bahja cluster.Present projects and shutdown activities are ongoing at Suwaith,Sayyala,Zaulia,Howqa,and Sahma.

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Assistant Vice President
      • Sep 2014 - Jul 2016

      Mechanical installation piping work structural work tank erection insulation refractory including electrical and instrumentation of Amonia and Urea plant for Dangote Fertilizer Project scope:piping -1000000inchdia,Equipment erection-30000MT,Structural erection-18000MT,Painting-150000sqmtr,E&I-1500KM.Value of the project-130million USD Piling Work-Precast piling and Drving of pile of size 450 x 450 x 35mtr long of qty-4500no project value-25million USD Mechanical installation piping work structural work tank erection insulation refractory including electrical and instrumentation of Amonia and Urea plant for Dangote Fertilizer Project scope:piping -1000000inchdia,Equipment erection-30000MT,Structural erection-18000MT,Painting-150000sqmtr,E&I-1500KM.Value of the project-130million USD Piling Work-Precast piling and Drving of pile of size 450 x 450 x 35mtr long of qty-4500no project value-25million USD

    • Nonresidential Building Construction
    • 1 - 100 Employee
    • Sr.General Manager
      • Aug 2011 - Aug 2014

      Procurement, fabrication, construction, stage-wise and final inspection of all the bought out and fabricated equipment / system, erection, pre-commissioning, commissioning, calibration and handing over to client in strict compliance with the specification.Total Scope 25000 inch dia piping,18000MT Equipment installation,6000MT tank installation,insulation and painting Procurement, fabrication, construction, stage-wise and final inspection of all the bought out and fabricated equipment / system, erection, pre-commissioning, commissioning, calibration and handing over to client in strict compliance with the specification.Total Scope 25000 inch dia piping,18000MT Equipment installation,6000MT tank installation,insulation and painting

    • General Manager
      • Jan 2009 - Jun 2011

      Name of Project: Package4 IRUP Project/Dismantling of ISA Plant and SHUT DOWN WORK/Equipmet Erection structure fab and erection,piping fab and erection of DFCU and AU Project/Mechanical and piping for RUC relocation and Resin Project/Equipment dismantling and equipment erection and piping work for HDPE,PP,LLDP,NCU,NCAU/Equipment and Piping work for optimization and modernization Facility for petrochemical Plant/Equipment erection and aluminium piping for cold box Client: IOCL Baroda/Sterlite Industries Tutukudi/Samsung ONGC Dahej/Lanxess Industries Jagadia/Haldia Petrochemicals/Andra Petrochemicals Ltd/INOX air Product,Lloyd steel Varda,Nagpur Show less

    • Saudi Arabia
    • Mining
    • 200 - 300 Employee
    • Senior Project Engineer
      • Nov 2006 - Nov 2008

      Equipment Installation and commissioning of,Rebar plant,Wire Rod Plant,Coil Handling System Equipment Installation and commissioning of,Rebar plant,Wire Rod Plant,Coil Handling System

    • project co-ordinator
      • Jun 2004 - Oct 2006

      MEG Expansion Plant/Mechanical erection,structure and piping work for pipe manufacturing unit/SS lining work inside the fatty acid tanks/Equipment erection and piping work for 225TPD Caustic soda membrane cell plant/equipment and piping for 225TPD caustc soda membrane cell plant/Mechanical and piping tank(crayogenic) for 855 TPD Air separation plant/Mechanical piping and crayogenic tank work for 1200tpd oxygen plant ,installation of double wall liquid argon and nitrogen tank Client: India Glycols Kashipur/VVF Sewree/Kanoria Chemicals Renukot/Bihar caustic Jarkhand/British Oxygen at Jindal vijaynagar steel Bellary/Inox Air Product at Essar Steel Hazira Show less

    • Resident Manager
      • Aug 1994 - May 2004

      Erection testing commissioning of 20nos POY spinning Machine of DU-Pond,4 nos PSF stapple fiber machine along with piping and ducting /Erection testing commissioning of 6 x 125TPH BHEL heat recovery steam generator,2 x 125 TPH Thermax Babcox and Wilcox boiler,1 x 125 TPH Dusche Babcock Boiler/Maintance of Boiler,Maintanance of Deluge Valve Shut down work,exchanger testing and boxup,column cleaning and testing,dismantling of corroded crude tanks,Piping work for refinery modernization plant,Installation of 9 nos LPG mounded bullets of 26mtr dia x 75mtr long including piping Shutdown work of Fractionator tower and drum,heat exchanger at HPCL/heat exchanger maintenance overhauling at CDU,ARU,DHDS,FCCU,CCU,HDS ,tank dismantling work at BPCL Show less

Education

  • SDM COLLEGE OF ENGG AND TECH DHARWAD
    BACHELOR IN MECHANICAL ENGINEERING, Mechanical Engineering
    1990 - 1994
  • Pompei junior college damaskatee,kinnigoli 574141
    sslc and puc, science
    1985 - 1989

Community

You need to have a working account to view this content. Click here to join now