Kim Solberg

Technical Support & Implementation Services Engineer at Innovyze
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Broomfield, Colorado, United States, US
Languages
  • English Native or bilingual proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Oregon All-Terrain Vehicle (Class I & III) Certification
    Oregon Parks and Recreation Department
    Jan, 2009
    - Nov, 2024
  • Adult & Child CPR/AED/First Aid/Bloodborne Pathogens
    Aerie Backcountry Medicine
    Oct, 2018
    - Nov, 2024
  • Heartsaver CPR & AED Certification
    American Heart Association | American Stroke Association
    Mar, 2017
    - Nov, 2024

Experience

    • United States
    • Software Development
    • 1 - 100 Employee
    • Technical Support & Implementation Services Engineer
      • Apr 2019 - Present

      • Supported engineers in solving complex errors within hydraulic and hydrologic models • Constructed custom asset management, water, and storm distribution models according to client data and specifications • Prepared technical documentation for modeling solutions, project memos, agendas, model build assumptions, and project summaries to provide to clients • Led training classes of up to to 20 attendees on Innovyze products, including InfoWater, InfoWater Pro, InfoWorks WS Pro, and InfoAsset Planner Show less

    • Government Administration
    • 700 & Above Employee
    • Streamside Restoration Project Assistant
      • Oct 2018 - Mar 2019

      • Used plant knowledge to identify and remove invasive species within riparian and wetland project sites • Prepped project sites by pulling or brush cutting invasive species, laying black fabric to stop unwanted plant growth, and zoning desirable locations for native plants based on ideal growing conditions • Selected suitable native plants from nursery and planted in proper zones while keeping known interactions with existing and other species being planted in mind • Maintained native plant nursery and past project sites to encourage continuous growth of native species • Constructed and maintained wildlife exclusion fencing Show less

    • Higher Education
    • 700 & Above Employee
    • Senior Design Project
      • Sep 2017 - Jun 2018

      • Led team of 4 engineering students in designing efficient bioreactor that treats effluent from Oregon State University’s dairy farm and meets EPA water regulations • Conducted weekly group meetings and facilitated reporting to managing professor • Created site maps and project design plans using ArcGIS • Led team of 4 engineering students in designing efficient bioreactor that treats effluent from Oregon State University’s dairy farm and meets EPA water regulations • Conducted weekly group meetings and facilitated reporting to managing professor • Created site maps and project design plans using ArcGIS

    • United States
    • Paper and Forest Product Manufacturing
    • 700 & Above Employee
    • Mill Production (Summer Hire)
      • Jun 2014 - Sep 2017

      • Worked here over four summers filling various spots for employees on vacation • Responsibly operated heavy machinery including veneer plugging Skoogs, dryers, and glue spreaders • Trained new employees to safely operate machinery and properly adhere to mill procedures • Performed mass balance testing on log samples and tracked their status throughout the mill during the additional testing, peeling, and drying phases to ensure quality • Increased mill efficiency by altering data collection procedures using available technology Show less

    • Higher Education
    • 700 & Above Employee
    • River Restoration Project
      • Mar 2017 - Jun 2017

      • Collaborated with a small team to design restoration plan for local eroded riverbank • Designed 3 HEC-RAS models of river site to show current conditions and restoration alternatives. Ensured each model conformed to state regulations • Integrated knowledge from coursework in ArcGIS to create maps showing fluctuations in river over 40-year timespan • Collaborated with a small team to design restoration plan for local eroded riverbank • Designed 3 HEC-RAS models of river site to show current conditions and restoration alternatives. Ensured each model conformed to state regulations • Integrated knowledge from coursework in ArcGIS to create maps showing fluctuations in river over 40-year timespan

    • Higher Education
    • 700 & Above Employee
    • Crooked River National Grassland Restoration Project
      • Sep 2016 - Dec 2016

      • Categorized negative effects of invasive plant species on Crooked River National Grassland • Performed extensive field testing • Authored detailed research report on findings and outlined recommendations for future restoration • Categorized negative effects of invasive plant species on Crooked River National Grassland • Performed extensive field testing • Authored detailed research report on findings and outlined recommendations for future restoration

Education

  • Oregon State University
    Ecological Engineering, Environmental Engineering Minor
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now