Khoirul A
RNO Engineer at PT.GCI Indonesia (JIESAI)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT.GCI Indonesia (JIESAI)
-
Telecommunications
-
300 - 400 Employee
-
RNO Engineer
-
Feb 2013 - Present
SmartFren CDMA Phase 2.2 Roll Out - Request CDMA SSDT (Single Site Drive Test) from DT Team to perform collect Drive Test Log file, Performing Functionality Test for new site. - Request CDMA Cluster Drive Test to DT Team for checking Coverage Problem, Pilot Pollutions, Neighbour List Problems. - Specify corrective actions to maximize radio coverage by specifying antenna height, azimuth, angle, and/or equipment grade, power budgets, up-link/down-link balance and, antenna tilt - Checking Optimize Test (Coverage Test, Quality Test, Throughput Test, Handover Test, etc) - Create/Audit/Delete Neighbor relation between CDMA site. - Perform CDMA statistic & KPI monitoring and worst cell. improvement. Vendor: ZTE Indonesia Show less
-
-
-
PT.UNISEL INDONESIA
-
Bandung Area, West Java, Indonesia
-
RF Engineer
-
Nov 2010 - Feb 2013
SmartFren CDMA Phase 2.1 Roll Out - Request CDMA SSDT (Single Site Drive Test) from DT Team to perform collect Drive Test Log file, Performing Functionality Test for new site. - Request CDMA Cluster Drive Test to DT Team for checking Coverage Problem, Pilot Pollutions, Neighbour List Problems. - Specify corrective actions to maximize radio coverage by specifying antenna height, azimuth, angle, and/or equipment grade, power budgets, up-link/down-link balance and, antenna tilt - Checking Optimize Test (Coverage Test, Quality Test, Throughput Test, Handover Test, etc) - Create/Audit/Delete Neighbor relation between CDMA site. - Perform CDMA statistic & KPI monitoring and worst cell. improvement. Vendor: ZTE Indonesia Show less
-
-
Education
-
Politecnic Negeri Bandung
Diploma of Telecommunication, Telecommunications Engineering