Khandaker Imamul Hasan
Terminal Head at JMI Industrial Gas Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
ASNT NDT Level II (RT, UT, MT and PT)
The American Society for Nondestructive TestingJun, 2014- Sep, 2024 -
Certified Welding Inspector
American Welding SocietyApr, 2008- Sep, 2024
Experience
-
JMI Industrial Gas Ltd.
-
Bangladesh
-
Oil and Gas
-
1 - 100 Employee
-
Terminal Head
-
May 2020 - Present
LPG Import Terminal
-
-
Project Incharge
-
Sep 2018 - Apr 2020
One of the largest LPG Import Terminal Project with subsea pipeline & CBM System
-
-
-
Petromax LPG Limited
-
Bangladesh
-
Oil and Gas
-
1 - 100 Employee
-
Projects Coordinator
-
Oct 2016 - Aug 2018
• Petromax LPG Satellite Plant with 10000DWT Ship Mooring Dolphin Jetty. • Petromax-5: LPG Carrier. 1300CBM coastal LPG Ship. • Petromax Cylinders Limited, 220cylinders per hour cylinder manufacturing line with standard raw material and finished product testing facilities. • Petromax LPG Satellite Plant with 10000DWT Ship Mooring Dolphin Jetty. • Petromax-5: LPG Carrier. 1300CBM coastal LPG Ship. • Petromax Cylinders Limited, 220cylinders per hour cylinder manufacturing line with standard raw material and finished product testing facilities.
-
-
-
-
Consultant Representative
-
Jan 2016 - Sep 2016
LPG Import Terminal (1500MT x 2nos. LPG Storage Spherical Tanks) Project LPG Import Terminal (1500MT x 2nos. LPG Storage Spherical Tanks) Project
-
-
-
-
Head of Operations
-
Mar 2015 - Dec 2015
Fly Ash Welded Steel Silo for Holcim Cement. Fly Ash Welded Steel Silo for Holcim Cement.
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
QA/QC Welding Engineer
-
Dec 2013 - Feb 2015
Chevron Bibiyana Expansion Project. Chevron Bibiyana Expansion Project.
-
-
-
S. C. Enterprise
-
United States
-
Project Manager
-
Jul 2013 - Sep 2014
Installation and Commissioning of Two LPG Satellite Plants. Installation of LPG Storage Tanks and Fire Water Storage Tanks. Fabrication, Welding, Erection and Testing of LPG Network, Compressed Air Network, Fire Detection and Protection System. Installation and Commissioning of Two LPG Satellite Plants. Installation of LPG Storage Tanks and Fire Water Storage Tanks. Fabrication, Welding, Erection and Testing of LPG Network, Compressed Air Network, Fire Detection and Protection System.
-
-
-
Bureau Veritas
-
Mexico
-
International Trade and Development
-
1 - 100 Employee
-
Industrial Surveyor ( Oil and Gas)
-
Jul 2012 - Jun 2013
2500BPD Capacity Refinery (Natural Gas Condensate Fractionation) 2500BPD Capacity Refinery (Natural Gas Condensate Fractionation)
-
-
-
-
Project Manager
-
Mar 2011 - Jun 2012
Fabrication, Welding and Testing of Piping Networks for 100MW HFO Based Power Plant. Fabrication, Welding and Testing of Piping Networks for 100MW HFO Based Power Plant.
-
-
-
-
QA/QC Supervisor (Welding and Coating)
-
Nov 2007 - Mar 2011
QA/QC Welding Inspector at Khurais Upstream Facilities QA/QC Supervisor at MoW at Al-Taif QA/QC Welding Inspector at Khurais Upstream Facilities QA/QC Supervisor at MoW at Al-Taif
-
-
Education
-
Rajshahi University of Engineering & Technology
Bachelor of Science in Mechanical Engineering, Bachelor of Science in Mechanical Engineering