Kevin zan

Piping supervisor at JGC Construction International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Yantai, Shandong, China, CN
Languages
  • English Professional working proficiency
  • Chinese Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Singapore
    • Construction
    • 300 - 400 Employee
    • Piping supervisor
      • Sep 2020 - Present

      LNG Canada Project LNG Canada Project

    • Japan
    • Oil and Gas
    • 700 & Above Employee
    • Mechanical Supervisor
      • Oct 2019 - Sep 2020

      GULF COAST GROWTH VENTURES(GCGV) Olefins Facility GULF COAST GROWTH VENTURES(GCGV) Olefins Facility

    • China
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Workface Planner(Piping& Mechanical)
      • Jun 2017 - Sep 2019

      Project:KIPIC AI Zour Refinery Project(ZOR). Responsibility: Ø Build IWPs templates. Organizing Shop manager or yard department leaders discuss during preparation phase and incorporate any comments as needed to determine final templates. Ø Monitoring material and drawing status, build and issue IWP (individual work package include fabrication and erection) which includes determining required activities, resources, special conditions, quality control, risk planning, interdependencies as schedule required. Ø Determine and coordinate resource requirements and liaise with resource coordinators (Materials, equipment etc.) to ensure IWP execution. Ø Tracing IWP issued status and drawing update status to update and adjust IWP as necessary Ø Monitoring and controlling IWP execution and advising appropriate parties. Ø Coordinate and settle material and drawing issues during IWP execution. Ø Built weekly report about issued IWP, forecast workload and IWP execution status. Work closely with piping superintendents, QC and material team to resolve any discrepancies in submitted reports in order to be accepted by system. Show less

    • Piping Superintendent
      • Jan 2013 - Jun 2017

       Technip JGC Chiyoda Yamal LNG Module Work Package MWP3 (2014.10 to present)  Chevron Bechtel Wheatstone EVT LNG Storage Tanks (2014.5-present)  NOV Frigstad Deepwater Dual Hoisting Tower Project (2013.7-2014.12) CNOOC En-ping Jacket EPC Project (2013.1-2014.1) BMA Hay Point Expansion Stage 3 Transfer Tower and Surge Bin (2011.9-2013.3)  CNOOC Huang Yan 14-1WHPA Jacket EPC Project(2013.1-2013.9) Manage workshop daily construction work and dealing with interface work Monitor and responsible for quality, HSE, project progress, and cost control Support and coordinate with project organization on project work Lead to develop project construction method and toolkits to meet project requirement Forecast and coordinate resource requirements among the project undertaken by workshop Responsible for workshop on-job training to improve work-related skills and knowledge  Assist marketing department with bidding work, especially the man-hour quota and working schedule Identify and record variation during the fabrication, report to PMT Show less

    • Construction Manager
      • Dec 2008 - Dec 2012

       Nanhai PanYu Living Quarter (EPCIC) (2011.3-2012.12)  CNOOC BZ28-2S Chang Qing-Yoke Mooring System Refurbishment (2007.11-2009.2) COSL Promoter Semi-submersible Pontoon ( 2008.12-2010.11)  Responsible for overall control of construction methodology, progress monitoring and review of pertinent project execution procedures Coordinate the preparation and submission of project deliverables e.g.;Engineering document, QA/QC procedures and Plans, HSE policy & plans, materials procurement documents etc., Coordinate with the Procurement Department the timely purchase and delivery to site of project materials Coordinate assigned tasks of various departments involved in the Project and provided required resources for the performance of their respective responsibilities. Coordinate project engineer and deal with problems in construction, quality and safety Coordinate document controller to set up document control system and supervise the work Deal with documents from client Explain and introduce the master contract in work scope Manage subcontractors on the performance of their respective work scopes. Prepare project closed-up report after completion Show less

    • Piping Engineer
      • Mar 2007 - Dec 2008

       CNOOC JZ25-1S Living Quarter (2008.12-2009.7)  Aker Solutions SRU&MEG Module (2008.8-2009.9)  Bluewater Bunga Orkid ETMS &Calm Buoys (2007.8----2008.8)  CNOOC Wenchang 19-1B Jacket、BZ13-1 Jacket (2007.3-2008.3)  AMLYDE M60 Crane (2007.3-2008.9)  In charge of the overall fabrication & assembly work of piping  Oversee the material movement, from MTO issuance, procurement and delivery on site. Coordinate with QC and Third party inspector and make sure that all piping material delivered are in accordance to approved specification. Review AFC drawings and highlight to project manager any issues of concerns identified for immediate attention Monitor the approved construction schedule are carried out  Coordinate with Cost Engineer on any Variation Orders or changes.  Review and confirm Variation Orders and Back Charges proposed by subcontractors Monitoring the implementation of approved procedures, schemes, etc and at the same time ensuring that personnel, equipment, relevant procedures/ drawings are adequately available. Under the lead of project manager, be responsible for routine safety issue and participate in weekly safety inspection and routine safety meeting and etc. Show less