Kevin Maguire P.Eng., MBA

Completion Adviser at Subsurface Dynamics Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • IRP 7
    -

Experience

    • Canada
    • Oil and Gas
    • 1 - 100 Employee
    • Completion Adviser
      • Mar 2019 - Present
    • Oilfield Consultant
      • Jun 2016 - Feb 2019
    • Canada
    • Oil, Gas, and Mining
    • 1 - 100 Employee
    • Senior Completion Engineer
      • Dec 2015 - May 2016

      Consulting for 'Services Petroliers Schlumberger Algerie'. Consulting for 'Services Petroliers Schlumberger Algerie'.

    • Senior Completion Engineer
      • Mar 2012 - Mar 2015

      Responsibilities: Completions, re-completions and workovers in Kaybob , Fox Creek, Brazeau River and Rocky Mountain House. Horizontal Duvernay Shale completions: Large high pressure slickwater and hybrid fracs. Single well and multi-well pads. Instrumental in working with Duvernay team to bring play to fruition and to reduce costs to make it viable. Horizontal Monteney completions: Maintained productivity while reducing completion costs by 50%. Horizontal Dunvegan completions: Pumping oil wells with up to a 1000 BBl/d initial production. Recompletions: Cardium, Notikewan, Cadomin, Gething and Monteny. Single, sandwiched perfs and multi-zone with oil fracs, foam fracs and propane fracs. Workovers: Downsize tubular and re-stimulate deep sour Nisku reef wells. Mentoring new engineers.

    • Oil and Gas
    • 1 - 100 Employee
    • Senior Completions Engineer
      • Sep 2004 - Mar 2012

      Responsibilities:  Completions in the Deep Basin / Foothills area. Completed 130+ wells with AFE costs of $175+ million. All sour operations in the Deep Basin / Foothills area. Horizontal Cardium oil completions. Multi-stage oil fracs, foam fracs and propane fracs. Horizontal Nikanassin gas completions: Multi-stage slick water fracs. Vertizontals - Multi-stage fracs in the horizontal and “stack fracs” in the vertical in areas with blanket comingling. Resource type plays in Deep Basin multiple zone “stack frac” comingled completions. Reduced completion costs by 30%. Critical sour completions in Coleman, Elmworth and Noel. Mentoring new engineers.

    • Completion Manager
      • Feb 2001 - Mar 2004

      Became Completions Manager when Coastal was purchased by El Paso in February, 2001. Completions: Deep Sour Foothills wells, High Pressure/High Temperature gas wells, oil wells, shallow gas wells, and injection wells in NE BC and across Alberta. Completed one of the top gas producers in Canada in December, 2002. The well, completed in the Slave Point with a BHT of 148°C and 18% CO2, produced 9 BCF in the first year problem free . Workovers and Re-Completions: Reduced Workovers in two areas acquired by El Paso from two rigs working full time to one rig working 50% of the time. Abandonments: Initiated a program to abandon and reclaim all suspended wells with no upside. Supervise staff of three employees and up to ten consultants.

    • Senior Drilling & Completion Engineer
      • Sep 1999 - Feb 2001

      Prepared all drilling and completion programs, cost estimates and AFE's. Directly supervised all completion operations. Drilled and completed a 100 well program in Bubbles/Green area of NE BC. First multi-well pad operations with rimless completions in this area. Drilled up to six directional wells per pad to reduce footprint and costs. Drilled and completed horizontal wells in the Edison area. Performed first slick water fracs done in Canada. Prepared all drilling and completion programs, cost estimates and AFE's. Directly supervised all completion operations. Drilled and completed a 100 well program in Bubbles/Green area of NE BC. First multi-well pad operations with rimless completions in this area. Drilled up to six directional wells per pad to reduce footprint and costs. Drilled and completed horizontal wells in the Edison area. Performed first slick water fracs done in Canada.

    • V.P. Engineering
      • Sep 1997 - Aug 1999

      KB was a small oil and gas company with eight employees and production of 550 BOE/day. KB’s production doubled over a one year period. Responsibilities: - Drilling and Completion Engineering. - Production Engineering. - Facility Engineering. - Reservoir Engineering. - Property Evaluation. KB was a small oil and gas company with eight employees and production of 550 BOE/day. KB’s production doubled over a one year period. Responsibilities: - Drilling and Completion Engineering. - Production Engineering. - Facility Engineering. - Reservoir Engineering. - Property Evaluation.

    • Director, Chief Operating Officer,
      • Dec 1994 - Jul 1997

      Penguin Works Inc., an oil and gas company owned by Mr. Maguire, was amalgamated with Coachlight in 1994. Coachlight was a small oil and gas company with four employees and production of 350 BOE/day. The net value of Coachlight increased, over a 2 ½ year period, from $3.1 million to $9.9 million, prior to being sold. Responsibilities: - Drilling and Completion Engineering. - Production Engineering. - Facility Engineering. - Reservoir Engineering. - Property Evaluation. - Production Accounting. - Accounting. - Audits.

    • President, Principal Engineer
      • Sep 1985 - Dec 1994

      Drillcomp provided consulting services to the oil and gas industry: - Drilling and Completion of numerous wells in B.C., Alberta, Saskatchewan and Ontario from 125m oil wells to 4500m sour gas wells. - Horizontal well drilling and completions in Alberta and Saskatchewan. - Project Management of multi well programs including AFE’s, economic analysis, surface rights, drilling, completions, pipelines, facilities, purchasing, cost control and day to day operations. - Production Optimization through numerous projects involving submersible pump installation, gas lift installation, workovers, recompletions, stimulations and facility upgrades. - Property Management of oil and gas properties in Alberta and Ontario including production accounting, accounting, payroll, land and management of day to day operations. - Deliverability Studies on major gas fields with recommendations including ultimate and recoverable reserves, gas plant sizing and debottlenecking, pipeline sizing, routing and looping, drilling locations, workovers, gas contracts and long term production and cash flow predictions for economic analysis. - Prepared and conducted a computer simulation of a large oil and gas field in central Alberta including a 125 MMCF/D gas plant, extensive pipeline system and over 100 wells. Based on results, modified the pipeline system and redesigned the plant compression (turbines) increasing production and extending the plant life. - Economic Analysis of oil and gas properties. - Reservoir Engineering including reserve evaluations for a major bank, reservoir performance analysis, AOF test analysis, log and core analysis and waterflood studies. - Developed Computer Programs for economics, accounting and well testing. - Government Applications for AEUB (formerly ERCB), Alberta Energy, B.C. Energy and Mines, Saskatchewan Energy and Mines and Ontario Energy & Mines. - Drilling, Completion and Construction Field Supervision.

    • President
      • Apr 1989 - Nov 1994

      Penguin, with a number of partners, began acquiring oil and gas properties in 1989. By 1994 Penguin operated 35 wells producing 260 BBl/d. Responsibilities: All the tasks associated with running a small operating oil company including engineering, land, accounting, production accounting and day to day management. Penguin was sold to Coachlight and the two companies were amalgamated under the name Coachlight in 1994. Penguin, with a number of partners, began acquiring oil and gas properties in 1989. By 1994 Penguin operated 35 wells producing 260 BBl/d. Responsibilities: All the tasks associated with running a small operating oil company including engineering, land, accounting, production accounting and day to day management. Penguin was sold to Coachlight and the two companies were amalgamated under the name Coachlight in 1994.

    • Chief Engineer
      • Jul 1983 - Aug 1985

      Responsibilities: - Drilling and Completion engineering. - Production engineering including workovers, production optimization and day to day field operations. - Oil and Gas Facilities design and construction including 12 MMCFD gas plant (expanded to 20 MMCFD), oil batteries, pipelines and wellsite facilities. - Reservoir engineering including regulatory applications, reserves, reservoir simulation, enhanced recovery, unitization and economics. Areas worked: Alberta and Saskatchewan.

    • Senior Operations Engineer, Northern
      • Jun 1980 - Jun 1983

      All Drilling and Completion operations in assigned areas including Deep Basin. Areas Worked: British Columbia and Alberta. All Drilling and Completion operations in assigned areas including Deep Basin. Areas Worked: British Columbia and Alberta.

    • Area Engineer
      • May 1978 - Jun 1980

      Responsibilities: - Completions and workovers. - Production optimization. - Oil and Gas Facilities design and construction. - Pipelines. - Water Floods - Unitization. - Day to day Production Operations. Areas Worked: British Columbia and Alberta. Responsibilities: - Completions and workovers. - Production optimization. - Oil and Gas Facilities design and construction. - Pipelines. - Water Floods - Unitization. - Day to day Production Operations. Areas Worked: British Columbia and Alberta.

Education

  • Haskayne School of Business
    Master of Business Administration (M.B.A.)
    1988 - 1991
  • University of Alberta
    Bachelor's Degree, Mechanical Engineering
    1974 - 1978

Community

You need to have a working account to view this content. Click here to join now