Kevin Ferguson

Branch Manager at Spark Power Corp.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cambridge, Ontario, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Electrician - Construction and Maintenance (309A)
    College of the Trades

Experience

    • Branch Manager
      • Feb 2018 - Present

    • Project Manager
      • Jan 2017 - Feb 2018

    • Canada
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Branch Manager
      • Feb 2018 - Present

    • Project Manager
      • Jan 2017 - Feb 2018

    • Project Manager / Electrician
      • Jun 2011 - Dec 2016

      • Responsibilities include quoting, and managing large solar installations ranging from 100 KW to 700 KW systems.• Perform cost / profit analysis, order materials, organize labor, meet with clients to outline expectations and provide quotations.• Coordinating with foreman to ensure projects are completed on time, and on budget.• Communicate with clients to ensure work is meeting and exceeding all expectations.• Building, wiring, and troubleshooting purpose built machines for moving parts with drives, pneumatics etc.• Building control panels and installing control and power wiring for PSR safety systems for Manufacturing Equipment, Air Makeup Systems, Well Pumps, Industrial Bake Ovens and Robotics installations.• Performing maintenance on distribution equipment and arranging shutdowns for work on main distribution equipment.• Installing, maintaining and troubleshooting PSR safety systems on a variety of automotive manufacturing equipment.• Running conduit and installing branch circuit conductors for a wide variety of electrical equipment and distribution systems.• Ability to operate a wide variety of machinery including, telehandler, forklift, skid steer, scissor and other aerial lifts.

    • Project Manager / Electrician
      • Jul 2008 - May 2011

      • Scheduling shutdowns of equipment and safely re energizing switch gear and large distribution.• Responsibilities included planning, delegating and overseeing work to keep contracts on time, and within budget.• Reviewing, editing and updating process and instrumentation drawings for Toronto Water.• Coordinating with Toronto Water managers for access and approval of work to be completed.• Clearly setting targets and goals for employees to maintain quality and quantity of work performed.• Performing upgrades on various glass finishing machines.• Installing new services to large industrial compressors, drops and feeds for machines, lighting upgrades throughout a glass manufacturing and finishing plant.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Electrical Apprentice
      • Jun 2007 - Jun 2008

      • Responsibilities included installation of branch circuits, and installation of electrical equipment for the residential market.• Service upgrades, new homes, renovations, installed boxes, ran wire, tied in switches lights and receptacles.

    • Electrical Apprentice
      • Jul 2005 - Jun 2007

      • Responsibilities included installation of branch circuits, underground duct banks, panel wiring and installation of electrical equipment for commercial and industrial applications.• Worked in the residential electrical field – service upgrades, new homes, renovations, installed boxes, ran wire, tied in switches lights and receptacles.• Operated a backhoe for electrical services.• Worked full-time during the summer and part-time during school.

Education

  • Conestoga College
    Electrical Technician
    2006 - 2009

Community

You need to have a working account to view this content. Click here to join now