Kerem Karşıyaka

Laravel Developer at Öğrenci Baksana
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Istanbul, Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Türkiye
    • Advertising Services
    • 1 - 100 Employee
    • Laravel Developer
      • Feb 2023 - Dec 2023

      Istanbul, Turkey Volunteer

    • Recruitment Intern
      • May 2022 - Oct 2022

      Istanbul, Turkey Remote

    • Türkiye
    • Spectator Sports
    • 500 - 600 Employee
    • Human Resources Intern
      • Mar 2022 - May 2022

      Istanbul, Turkey Remote

    • Türkiye
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Business Analyst Intern
      • Jun 2021 - Sep 2021

      İzmir, Turkey

    • Türkiye
    • Retail
    • 700 & Above Employee
    • RETAIL STORE LAYOUT PLANNING & MEASURING SERVICE QUALITY
      • Jun 2019 - Jun 2020

      Marmara Park As a graduation project, a thesis was written on two topics: Service Quality Measurement and In-Store Layout at LC Waikiki Retail Store.In order to measure perceptions and expectations of 200 customers, two different surveys were organized using SERVQUAL method for measuring service quality.The results of these surveys were analyzed with the SPSS program and the results were obtained. As for the in-store layout, the existing store layout was examined and a new store layout was created. This… Show more As a graduation project, a thesis was written on two topics: Service Quality Measurement and In-Store Layout at LC Waikiki Retail Store.In order to measure perceptions and expectations of 200 customers, two different surveys were organized using SERVQUAL method for measuring service quality.The results of these surveys were analyzed with the SPSS program and the results were obtained. As for the in-store layout, the existing store layout was examined and a new store layout was created. This project was carried out with a team of 5 people. Show less

    • Türkiye
    • Building Materials
    • 1 - 100 Employee
    • FACILITY LAYOUT PLANNING & IMPROVEMENT OF EXISTING PRODUCTION SYSTEM BY REDUCING COST
      • Jun 2019 - Jun 2020

      Dilovası, Kocaeli, Turkey The design project was prepared at OMSA Metal Factory on factory layout planning and cost reduction and on developing the existing production system. The existing factory layout was examined and a new store layout was created. The cost resulting from the batch size used in the existing system was calculated and the cost was reduced by finding the new batch size using the EOQ method. This project was carried out with a group of 5 people.

Education

  • İstanbul Aydin University
    Bachelor's degree, Industrial Engineering
    2016 - 2022

Community

You need to have a working account to view this content. Click here to join now