Ken Worgan
Boiler Superintendent at John Beever Australia- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
LinkedIn User
Ken introduced the full wealth of his experience to the prestigious and pioneering environmental project for the Hong Kong government. The world's largest sludge recycling plant would not have succeeded in the absence of Ken's committed involvement. Ken was steadfast in maintaining the Client's quality expectations, whilst dedicating time to educate the local contractors on all aspects of the International Industry Standards of boiler construction. I can highly recommend Ken, as a true professional in his field Please feel free to contact me for further information on Ken's vast abilities.
Antoine Stoven
Ken has been a tremendous asset for our Team sharing his knowledge while pushing hard to get the job in a swift and efficient manner. It was a great pleasure working with him and I would be glad to have other opportunities in the future to renew this experience.
LinkedIn User
Ken introduced the full wealth of his experience to the prestigious and pioneering environmental project for the Hong Kong government. The world's largest sludge recycling plant would not have succeeded in the absence of Ken's committed involvement. Ken was steadfast in maintaining the Client's quality expectations, whilst dedicating time to educate the local contractors on all aspects of the International Industry Standards of boiler construction. I can highly recommend Ken, as a true professional in his field Please feel free to contact me for further information on Ken's vast abilities.
Antoine Stoven
Ken has been a tremendous asset for our Team sharing his knowledge while pushing hard to get the job in a swift and efficient manner. It was a great pleasure working with him and I would be glad to have other opportunities in the future to renew this experience.
LinkedIn User
Ken introduced the full wealth of his experience to the prestigious and pioneering environmental project for the Hong Kong government. The world's largest sludge recycling plant would not have succeeded in the absence of Ken's committed involvement. Ken was steadfast in maintaining the Client's quality expectations, whilst dedicating time to educate the local contractors on all aspects of the International Industry Standards of boiler construction. I can highly recommend Ken, as a true professional in his field Please feel free to contact me for further information on Ken's vast abilities.
Antoine Stoven
Ken has been a tremendous asset for our Team sharing his knowledge while pushing hard to get the job in a swift and efficient manner. It was a great pleasure working with him and I would be glad to have other opportunities in the future to renew this experience.
LinkedIn User
Ken introduced the full wealth of his experience to the prestigious and pioneering environmental project for the Hong Kong government. The world's largest sludge recycling plant would not have succeeded in the absence of Ken's committed involvement. Ken was steadfast in maintaining the Client's quality expectations, whilst dedicating time to educate the local contractors on all aspects of the International Industry Standards of boiler construction. I can highly recommend Ken, as a true professional in his field Please feel free to contact me for further information on Ken's vast abilities.
Antoine Stoven
Ken has been a tremendous asset for our Team sharing his knowledge while pushing hard to get the job in a swift and efficient manner. It was a great pleasure working with him and I would be glad to have other opportunities in the future to renew this experience.
Credentials
-
Welding Supervisor - AS 1796
Welding Technology Institute of AustraliaFeb, 1991- Nov, 2024 -
Welding Supervisor - AS 2214
Welding Technology Institute of AustraliaFeb, 1991- Nov, 2024 -
AS 1796 Welding Certificates 3E, 4, 5, 6 & 7
NSW Department Labour & IndustryJun, 1984- Nov, 2024 -
Boilermaker
TAFE NSWDec, 1983- Nov, 2024
Experience
-
John Beever Australia
-
Australia
-
Construction
-
1 - 100 Employee
-
Boiler Superintendent
-
Sep 2020 - Present
Kwinana Waste to Energy Project Kwinana Waste to Energy Project
-
-
-
Civmec
-
Australia
-
Construction
-
700 & Above Employee
-
QA Superintendent
-
Aug 2019 - Sep 2020
-
-
-
Downer
-
Australia
-
Civil Engineering
-
700 & Above Employee
-
Deputy QA/QC Manager
-
Jul 2017 - Jan 2019
-
-
-
Civmec
-
Australia
-
Construction
-
700 & Above Employee
-
Site QA/QC Superintendent
-
Jan 2016 - May 2017
-
-
-
Kerman Contracting Pty Ltd
-
Australia
-
Construction
-
1 - 100 Employee
-
QA Coordinator / Welding Inspector
-
Apr 2015 - Dec 2015
-
-
-
-
Site QA Manager
-
Apr 2014 - Dec 2014
-
-
-
-
Boiler Superintendent
-
Apr 2012 - Dec 2013
Construction of 4 x BFB Incinerator/boilers and auxiliary plant and piping • Assist planning and co-ordination of resources and equipment with the Erection Contractor to ensure that the correct sequence of erection • Ensuring construction works were carried out in accordance with approved drawings and specifications. • Monitor compliance with Company and Contract QA Procedures. • Providing progress reports to the Site Manager. • Ensuring that site installation work complies with Company and Contract Health and safety standards. • Carry out inspections, as required, to contract QA requirements • Assist client with design, technical, programing and quality issue relating to BOP Mechanical & Piping outside Andritz Scope. Additional works.
-
-
-
Austrian Energy & Environment
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Pressure Part Superintendent
-
Dec 2009 - Apr 2011
• Liaise with Client, Project Management and Site Management on activities associated with Boiler construction • Liaise and assist with technical, logistical, scheduling, human resources & commissioning & supervisory staff to meet project requirements • Developing and reviewing of detailed project schedules & subsequent priority planning of tasks associated with boiler construction • Optimise labour and construction equipment levels to meet schedule requirements • Monitor and enhance sub-contractors schedule associated with Pressure Parts construction • Ensuring construction works were carried out in accordance with approved drawings and specifications. • Ensure all QA/QC requirements were meet. Assist QA Department as required in developing and maintaining quality records • Developing MS Access databases to monitor piping installation for site. • Developed MS Access database for recording and reporting of Site Safety issues
-
-
-
Austrian Energy and Environment
-
Design Services
-
1 - 100 Employee
-
Welding Supervisor/Inspector
-
Jul 2009 - Dec 2009
• Assist in the development & implementation of Site Welding Management System • Assist in control all welding activities, including inspections, supervision, NDE & PWHT • Liaise with all AE&E Staff with regards with welding activities • Review and improve construction methodology of the CFB boilers • Liaise with AE&E Engineering with regard to construction methodology • Assist in establishing construction project schedule • Assist in the development & implementation of Site Welding Management System • Assist in control all welding activities, including inspections, supervision, NDE & PWHT • Liaise with all AE&E Staff with regards with welding activities • Review and improve construction methodology of the CFB boilers • Liaise with AE&E Engineering with regard to construction methodology • Assist in establishing construction project schedule
-
-
-
UGL
-
Australia
-
Engineering Services
-
700 & Above Employee
-
Welding Coordinator
-
Jun 2008 - Jul 2009
Co-ordination of all welding activities at Construction of Tamar Valley Power Plant, Tasmania Co-ordination of all welding activities at Construction of Tamar Valley Power Plant, Tasmania
-
-
-
Hitachi Plant Technologies
-
Construction
-
100 - 200 Employee
-
Site Quality Manager
-
Mar 2007 - Jun 2008
Construction of 2 x 250 MW Coal Fired Boilers Construction of 2 x 250 MW Coal Fired Boilers
-
-
-
Worley
-
Australia
-
Professional Services
-
700 & Above Employee
-
Project Manager
-
Mar 2006 - Apr 2007
Project Management and Boiler Shutdown Coodinator. Project Management and Boiler Shutdown Coodinator.
-
-
-
Worsley Alumina
-
Mining
-
1 - 100 Employee
-
Welding Inspector
-
Sep 2005 - Mar 2006
-
-
-
Worley
-
Australia
-
Professional Services
-
700 & Above Employee
-
Site Manager/Project Manager
-
Oct 1999 - Aug 2005
-
-
-
-
Boiler Supervisor
-
Jul 1999 - Oct 1999
-
-
-
-
Quality/Welding Inspector
-
Aug 1998 - Jul 1999
-
-
-
-
Welding/Piping Supervisor & Inspector
-
Jan 1997 - Jul 1998
Installation/Erection Condenser, Feedwater & Condensate Systems, Boiler Feed Pumps at Collie Power Station (330 MW Coal Fired PS) Installation/Erection Condenser, Feedwater & Condensate Systems, Boiler Feed Pumps at Collie Power Station (330 MW Coal Fired PS)
-
-
-
-
Welding Coordinator
-
Feb 1996 - Dec 1996
-
-
-
-
Workshop Supervisor
-
1994 - Dec 1996
-
-
-
-
Workshop Supervisor/ Welding Coodinator
-
Oct 1993 - Apr 1994
-
-
Welding Coordinator
-
Mar 1992 - Sep 1993
-
-
-
-
Contracts Welding Inspector
-
Feb 1990 - Mar 1992
Liddell & Bayswater Power Stations Liddell & Bayswater Power Stations
-
-