Keith Reynolds
Engineering Manager at Affinity Offshore- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Spanish Professional working proficiency
Topline Score
Bio
Experience
-
Affinity Offshore
-
Malaysia
-
Design Services
-
1 - 100 Employee
-
Engineering Manager
-
Mar 2022 - Present
-
-
-
Idemitsu Gas Production (Vietnam) Co., Ltd. in HCMC
-
Vietnam
-
Oil and Gas
-
1 - 100 Employee
-
Specialist
-
Jan 2018 - Apr 2022
-
-
-
EnQuest
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Site Manager (FPSO)
-
May 2012 - Sep 2015
Site Manager for the Conversion/upgrade of the FPSO Enquest Producer and Blohm and Voss Repair Hamburg. Site Manager for the Conversion/upgrade of the FPSO Enquest Producer and Blohm and Voss Repair Hamburg.
-
-
-
DRAGADOS OFFSHORE
-
Spain
-
Construction
-
700 & Above Employee
-
Completion Manager/Deputy Project Manager
-
Dec 2010 - Apr 2012
Completions Manager/Deputy Project Manager for the management of the two ConocoPhilips Jasmine project topsies totallinf ca 15,000 tonnes Completions Manager/Deputy Project Manager for the management of the two ConocoPhilips Jasmine project topsies totallinf ca 15,000 tonnes
-
-
-
-
Integration & Commissioning Manager
-
Aug 2007 - Aug 2008
Employed by Dragados Offshore as the Integration and Commissioning Manager on their EPIC contract for the fabrication and integration of the topsides for the MPF01 a new generation Floating Drilling Production Storage and Offload (FDPSO) vessel Employed by Dragados Offshore as the Integration and Commissioning Manager on their EPIC contract for the fabrication and integration of the topsides for the MPF01 a new generation Floating Drilling Production Storage and Offload (FDPSO) vessel
-
-
-
-
Company Rep
-
Jun 2006 - Jul 2007
Company Rep for Marathon Oil European Business Unit (Equatorial Guinea) Based in Equatorial Guinea Central West Africa at Marathon Oil’s Malabo Facility and responsible for the onsite Management and Execution for all Onshore & Offshore Capital Projects engineered in Aberdeen on behalf of Marathon Equatorial Guinea Petroleum Operations. Company Rep for Marathon Oil European Business Unit (Equatorial Guinea) Based in Equatorial Guinea Central West Africa at Marathon Oil’s Malabo Facility and responsible for the onsite Management and Execution for all Onshore & Offshore Capital Projects engineered in Aberdeen on behalf of Marathon Equatorial Guinea Petroleum Operations.
-
-
-
-
Hook-up & Commissioning Manager
-
May 2003 - Jun 2006
Responsible for the hook-up and commissioning of two sequential projects both located Sondo de Campeche, Gulf of Mexico and both in excess of 1.5 million man-hours. I started on the first of these two projects in Dragados fabrication Facility in Cadiz where I was responsible for the onshore commissioning and preparation of the offshore installation hook–up, commissioning and start-up. Responsible for the hook-up and commissioning of two sequential projects both located Sondo de Campeche, Gulf of Mexico and both in excess of 1.5 million man-hours. I started on the first of these two projects in Dragados fabrication Facility in Cadiz where I was responsible for the onshore commissioning and preparation of the offshore installation hook–up, commissioning and start-up.
-
-
-
-
Construction/Project manager
-
Jul 1998 - Apr 2003
July 1998 as Construction Manager on the completion of the Bleo Holm, a purpose built FPSO based on an Aframax tanker hull with integral turretNovember 1999 I was seconded to Talisman as a member of the team working on the proposals and negotiation with BP. Following conclusion and agreement I continued with Talisman managing the basic engineering for the Blake field topsides modifications being performed by Fluor Daniel in Haarlem Holland. I continued through tender for the topsides detailed engineering, fabrication and installation and on award of the works to Aker McNulty at South Shields I moved to their facility as Site Manager for Talisman responsible for all site activities including detail design, fabrication and installation. In November 2002 took over as Project Manager on an existing contract for conversion of the FPSO Glas Dowrbeing converted in Cape Town for Pioneers Sable field offshore South Africa. Show less
-
-
-
-
Project Interface Coordinator
-
Jan 1998 - Jun 1998
review/audit interface control for the Laminaria FPSO review/audit interface control for the Laminaria FPSO
-
-
-
Statoil
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
FPSO Interface and Hook-up & Commissioning Manager
-
Apr 1997 - Dec 1997
Initially employed on the SLP EPIC contract with Statoil for the Connemara Project, a FPSO/Sub-sea development off the west coast of Ireland to provide hook-up & commissioning input into design with the intent to continue and Manage the Hook-up and Commissioning through preparation and execution. At the end of basic engineering and following evaluation of the poor results from the well production test Stat oil cancelled the Project Initially employed on the SLP EPIC contract with Statoil for the Connemara Project, a FPSO/Sub-sea development off the west coast of Ireland to provide hook-up & commissioning input into design with the intent to continue and Manage the Hook-up and Commissioning through preparation and execution. At the end of basic engineering and following evaluation of the poor results from the well production test Stat oil cancelled the Project
-
-
-
-
FPSO Hook-up/Integration Manager
-
Aug 1995 - Mar 1997
Employed by Astano on their EPIC contract for the FPSO “Petrojarl IV” to be operated for Golanor and destined for BP Foinaven fireld. Employed by Astano on their EPIC contract for the FPSO “Petrojarl IV” to be operated for Golanor and destined for BP Foinaven fireld.
-
-
-
-
Project Manager
-
Feb 1994 - Jul 1995
responsible for two contracts for the AMOCO Inde refurbishment. The contracts were 1) for the fabrication, fit-out and load-out of a 650 Tonne pancake deck and 2) the offshore hook-up & refurbishment of the Inde Platform southern sector North Sea. The fabrication of the pancake deck commenced 1st July 1994 with mechanical completion achieved mid March 1995 responsible for two contracts for the AMOCO Inde refurbishment. The contracts were 1) for the fabrication, fit-out and load-out of a 650 Tonne pancake deck and 2) the offshore hook-up & refurbishment of the Inde Platform southern sector North Sea. The fabrication of the pancake deck commenced 1st July 1994 with mechanical completion achieved mid March 1995
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Resident Engineer (Offshore Construction Manager)
-
Feb 1991 - Dec 1993
Employed by Chevron UK on the Alba Northern platform and responsible for the Hook-up and Commissioning. From February 1991 to June 1993 responsible for the Integrated Management Team and the preparation and planning of the onshore mechanical completion and commissioning, the offshore hook-up and commissioning and the award of the Hook-up labour and facilities contract and the support vessel contract. Following the completion of the engineering and hook-up preparation I continued as the Offshore Resident Engineer (HUC Manager0 on a two/two rotation. Show less
-
-
-
-
Construction Manager/Offshore Installation Manager
-
Jun 1989 - Jan 1991
Employed by ARCO British on the Thames platform and subsequently the Welland satellite (to Thames) platform I was responsible, on a two on two off rota for all offshore construction and commissioning activities for the installation of the new gas compression modules and Welland reception facilities on the Thames Platform. On completion of the Thames activities I transferred to the Welland satellite platform. Employed by ARCO British on the Thames platform and subsequently the Welland satellite (to Thames) platform I was responsible, on a two on two off rota for all offshore construction and commissioning activities for the installation of the new gas compression modules and Welland reception facilities on the Thames Platform. On completion of the Thames activities I transferred to the Welland satellite platform.
-
-
-
-
Project Manger
-
Sep 1988 - Jun 1989
Project Manager for upgrade activities at BP’s existing well head gathering facility at Welton, Lincs, Project Manager for upgrade activities at BP’s existing well head gathering facility at Welton, Lincs,
-
-
-
-
Senior Project Construction Engineer
-
Jul 1987 - Sep 1988
Employed by Amerada Hess on the conversion of a semi-submersible to provide the production facilities for their Ivanhoe/Rob Roy fields Employed by Amerada Hess on the conversion of a semi-submersible to provide the production facilities for their Ivanhoe/Rob Roy fields
-
-
-
-
Construction Manager for the Hook-up and Commissioning
-
Oct 1984 - Oct 1986
Initially employed by Hispanoil as Commissioning Manager for their Gaviota Gas Production platform based offshore Bilbao in the Bay of Biscay. Initially based in Madrid in the planning and preparation including bid reviews and awards for jacket and topsides I transferred, in July 1985 to the fabrication sites in Bilbao for the Mechanical completion acceptance and pre commissioning activities. Following the initial installation offshore I was appointed as the Construction, Commissioning & Start-up Manager Show less
-
-