Keith Hudson
Manager Power Production Afton Generation Station at Public Service Company of New Mexico (PNM)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Public Service Company of New Mexico (PNM)
-
United States
-
Utilities
-
300 - 400 Employee
-
Manager Power Production Afton Generation Station
-
May 2022 - Present
-
-
-
GE Power & Water
-
Mexico
-
Electric Power Generation
-
400 - 500 Employee
-
Senior Sales Manager at GE Power Services
-
Oct 2019 - May 2022
GE Power is a world energy leader providing equipment, solutions and services across the energy value chain from generation to consumption. Operating in more than 180 countries, our technology produces a third of the world’s electricity, equips 90% of power transmission utilities worldwide, and our software manages more than 40% of the world’s energy. GE Power is a world energy leader providing equipment, solutions and services across the energy value chain from generation to consumption. Operating in more than 180 countries, our technology produces a third of the world’s electricity, equips 90% of power transmission utilities worldwide, and our software manages more than 40% of the world’s energy.
-
-
-
Western Industrial Contractors
-
United States
-
Automation Machinery Manufacturing
-
100 - 200 Employee
-
Senior Project Manager
-
May 2018 - Sep 2019
-
-
-
Xcel Energy
-
United States
-
Utilities
-
700 & Above Employee
-
Reliability Services and Overhaul Management / Manager Overhaul Planner at Xcel Energy
-
Jan 2016 - Apr 2018
This position is responsible for the leadership and direction of all overhaul activities and personnel to achieve overhaul performance objectives. This position is accountable for the effective implementation of the overhaul planning, execution and the post overhaul continuous learning cycle process for the region. Coordinate the overhaul planning process, the identification and development of the overhaul work scope and responsible to ensure the development and administration of overhaul contracts. Provides direction to the matrixed resources to ensure successful overhaul planning, as well as overhaul execution and the continuous overhaul learning cycle, and effective management of the overhaul budget Show less
-
-
Maintenance Manager
-
Feb 2014 - Dec 2016
• Developed and maintained the Work Management Process at Cherokee to increase the reliability of the Unit 3&4.• Help develop the startup plan and commissioning of the New GE 7FA.05 & D11 Steamer on 5, 6,&7 at Cherokee Station. • Developed Critical Parts list for Cherokee New Units 5, 6, & 7.• Help plan Capital Projects on the Unit 3 & Unit 4 Pulverizes. At the same time I supervise the mechanical maintenance staff, provides training, schooling and ensures compliance with corporate and departmental policies and procedures. • Responsible for overseeing the estimating and planning capital projects, turnarounds, daily maintenance work, locating vendors, purchasing materials, and estimating maintenance and capital projects. Coordinated all scheduled projects with Xcel Energy representatives and crew members, scheduled daily activities utilizing Dailey Scheduling Tool and Maxixmo software applications. Reviewed proposal specifications and drawings, attended pre-bid meetings, and determined scope of work and required contents of estimates. Prepared estimates, calculated scope of work, and coordinated total estimating efforts related to bids or projects. Additionally, responsible for maintaining working document files as back-ups for estimate figures. • Maintained and coordinated all project, turnaround and emergency boiler work requiring code documentation, R stamp repairs and authorized inspector inspections Show less
-
-
-
NV Energy
-
United States
-
Utilities
-
700 & Above Employee
-
Manager Maintenace Asset /Fuels/ Capital Projects North Valmy
-
Oct 2012 - Feb 2014
• Plan and Run all the Major Capital Projects on the Unit 1 & Unite 2 Pulverizes. At the same time I supervised the mechanical maintenance staff, provide training, schooling and ensure compliance with corporate and departmental policies and procedures. • Oversee the Operations Crew on Valmy Unit1 & 2. This included a crew of 5 Ops supervisor and 48 BU employees. • Plan & execute 3 & 5 Year Major Capitol Turbine & Generator Overhauls.• Responsible for overseeing the estimating and planning capital projects, turnarounds, daily maintenance work, locating vendors, purchasing materials, and estimating maintenance and capital projects. Coordinated all scheduled projects with NV Energy representatives and crew members, scheduled daily activities utilizing Pasta and Pass Port software applications. Reviewed proposal specifications and drawings, attended pre-bid meetings, and determined scope of work and required contents of estimates. Prepared estimates, calculated scope of work, and coordinated total estimating efforts related to bids or projects. Additionally, responsible for maintaining working document files as back-ups for estimate figures. • Maintained and coordinated all project, turnaround and emergency boiler work requiring code documentation, R stamp repairs and authorized inspector inspections• Team President- Work Management: We as a group developed our fleet wide work management process that included, Process Book, Planning Book, Scheduling Tool and Score Card Tracking. Show less
-
-
Maintenance Supervisor- Cap X Projects
-
Oct 1998 - Oct 2012
• Plan and Run all the Major Capital Projects on the Unit 1 & Unite 2 Pulverizes. At the same time I supervise the mechanical maintenance staff, provide training, schooling and ensure compliance with corporate and departmental policies and procedures. • Responsible for overseeing the estimating and planning capital projects, turnarounds, daily maintenance work, locating vendors, purchasing materials, and estimating maintenance and capital projects. Coordinated all scheduled projects with NV Energy representatives and crew members, scheduled daily activities utilizing Pasta and Pass Port software applications. Reviewed proposal specifications and drawings, attended pre-bid meetings, and determined scope of work and required contents of estimates. Prepared estimates, calculated scope of work, and coordinated total estimating efforts related to bids or projects. Additionally, responsible for maintaining working document files as back-ups for estimate figures. • Maintained and coordinated all project, turnaround and emergency boiler work requiring code documentation, R stamp repairs and authorized inspector inspections• Team President- Work Management: We as a group developed our fleet wide work management process that included, Process Book, Planning Book, Scheduling Tool and Score Card Tracking. Show less
-
-
-
NV Energy
-
United States
-
Utilities
-
700 & Above Employee
-
Supervisor Operations - North Valmy Station
-
Jan 1994 - May 1998
• My responsibilities included the he daily operations of the power plant and the overall site. This is included the operation of 2 coal fired power boiler and the steam turbines and the generators plus all the support systems that are required. This included the isolation of equipment for outages and repairs and placing the equipment back into operations. • Responsible for operation and dispatch of equipment at both times of maximum and minimum demand. • Responsible for operations of our limits for environmental emissions• Conduct daily safety meeting with the operations crew and field safety observations of employees to ensure they are work safely. • Perform walk downs of for overall readiness and cleanliness of both units. • Conduct performance evaluations on my employees and provide them to leadership Show less
-
-
Education
-
Mesa State College
Bachelor of Science (BS), Bachelor’s Degree in Engineering Science of Construction Management -
University of Denver
Master's degree, Project Management -
Ouray Hight School
High School Dimploa, General Studies -
PMP
Project Management -
University of Denver
Master of Business Administration - MBA, Finance, General