Keerthi Kurugundla

Assistant Project Manager/Project Engineer at Ad Tech Enterprises
  • Claim this Profile
Contact Information
Location
US
Languages
  • English Full professional proficiency
  • Tamil Native or bilingual proficiency
  • Telugu Professional working proficiency
  • Hindi Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Assistant Project Manager/Project Engineer
      • Aug 2016 - Present

      Projects: Metro North Railroad Contract MNR 60606, Port Chester Elevator Project: 2016 - 2017 Port Chester, NY Installation of ADA Accessible Ramp & Elevator at Port Chester Train Station MTA Capital Construction Contract MC-832, Penn Station Perimeter Protection:2016 - 2018 Manhattan, NY Contract MC-832, Penn Station Perimeter Protection: Installation of Delta Phalanx Barriers, Guard Booths, Stainless Steel Bollards on 31st & 33rd Streets entrances to Madison Square Garden. Assistant Project Manager: MTA New York City Transit A36984, Component Repairs at Two Stations on the 4th Ave line: 2017 - 2018, Brooklyn, NY Component Repairs at two stations including new Platform Edges, Concrete Restoration & Column Repairs.

    • India
    • Real Estate
    • 1 - 100 Employee
    • Assistant Project Engineer
      • Nov 2011 - Oct 2013

      •Reviewed plans and specs during the schematic design of pre-construction. •Scheduling of various on-site activities including surveying excavation, foundation laying, erection of columns, beams and laying of slabs using AutoCAD drawings. •Quantity & Cost Estimation of equipment, materials and labor fort he determination of project feasibility. •Coordinated the laying of the open raft foundation with RCC beams. •Reading and generating AutoCad & Navisworks drawings and updating to the onsite-staff. •Re-scheduling of activities due to bad weather during the monsoon. •Closely worked with the Senior Project Manager to ensure onsite safety. •Worked on the RCC framed structure from the basement to the terrace floor, designed for seismic conditions. •Reviewed calculations and analytical data to maintain the approximate accuracy of the technical reports. •Scheduling of all the material deliveries. •Conducted routine quality audits to ensure the timely completion of the work.

    • Engineering Intern
      • Oct 2010 - Sep 2011

      •Helped in preparing the pre-construction documents. Verified and compiled all the important forms with official standards. •Scheduling management and ensuring that the materials reached the construction site as scheduled. •Optimized the scheduling process for material delivery to the construction site. Materials used to be wasted as the delivery time to the site used to be cluttered. So found a solution to rectify the problem and successfully saved more time, cost and materials. •Scheduled contractors for maintenance issues.

Education

  • Western Michigan University
    Master’s Degree, Construction Management & Transportation Engineering
    2014 - 2016
  • Sathyabama University
    Bachelor’s Degree, Civil Engineering