Karthik Ganesan
Plumbing Engineer at Horizon Gulf Electromechanical Services L.L.C- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Tamil Native or bilingual proficiency
-
English Full professional proficiency
-
Hindi Professional working proficiency
-
Malayalam Professional working proficiency
Topline Score
Bio
Experience
-
Horizon Gulf Electromechanical Services L.L.C
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
Plumbing Engineer
-
Apr 2020 - Present
-
-
Plumbing Engineer
-
Oct 2019 - Mar 2020
Organization: Horizongulf Electromechanical LLCPosition: Plumbing Engineer (PL&FF)Project Engaged: The Makers DistrictProject Value and Area: Tower 1 – 12 Floors+1 Roof / Tower 2 – 18 Floors+1 Roof Tower 3 – 20 Floors+1 Roof / Tower 4 – 22 Floors+1 Roof Tower 5 – 18 Floors+1 Roof / Tower 6 – 16 Floors+1 Roof Tower 7 – 14 Floors+1 Roof + 2 Common Basement
-
-
Plumbing Engineer
-
Apr 2018 - Sep 2019
Organization: Horizongulf Electromechanical LLCPosition: Plumbing Engineer (PL&FF)Project Engaged: Mismak-Najmat Abu Dhabi Residential / Commercial ComplexProject Value and Area: Tower A – 26 Floors+ Roof & Tower B – 26 Floors+Roof 4 Podiums + Gym + Tennis Court
-
-
-
Voltas Limited - A TATA Enterprise
-
Computers and Electronics Manufacturing
-
700 & Above Employee
-
Plumbing Engineer
-
Sep 2016 - Mar 2018
Project Value and Area: C2 Building / 5 Basements + 14Floors + 1Roof + External Area C4 Building / 5 Basements + 10Floors + 1Roof
-
-
Plumbing Engineer
-
Jan 2015 - Aug 2016
Project Value and Area: 5 Attraction Rides (9 ha -World Most Designed Rides)(World Most designed rides).● To Study about project requirements based on Contract Drawings and IFC specifications.● Preparation of material submittals, method statements and technical documents to get approved from consultant.● Preparing Shop drawings complying to issued design drawings and project specifications.● Procurement of materials on SAP.● To attend the weekly Procurement meeting with project team and enhance the efficient way of material management.● Hire and supervise the activities of subcontractors and subordinate staff.● Technical calculation for Mechanical Equipment's.● Carry out work at client premises (including overseas) as required by the company, while observing HSEQ policies and working within these at all times.● Preparation of O&M manual for Mechanical system (HVAC, PL&FF).
-
-
Plumbing Engineer
-
Jun 2012 - Dec 2014
Project Value and Area: LG + GF + 2 Levels + 1 Roof (2.5 Mil Sq.ft)● Mechanical equipment's (Booster Pumps, FCU, AHU's, drainage system equipment's, FM200 clean agent system, Ducting, Chilled water & Plumbing system Piping network installation.● Proper planning on manpower deployment and setting targets to sub ordinates based on project requirement. ● Day to day supervision of site works with focus on quality and productivity of job.● Progress report preparation and submission..● Subcontractors work flow monitoring, review and evaluate work production.● Conduct and attend the safety meetings, staff meetings and related activities● Material Management.● Review, estimation and execution of Engineering Instructions.● Mechanical Equipment Testing & Commissioning.● Mechanical Equipment Maintenance.
-
-
Education
-
Sri Ram Educational Institute
Bachelor of Technology (B.Tech.), Mechanical Engineering -
NANJAPPA POLYTECHNIC COLLEGE
DIPLOMA, Mechanical Engineering