Kareem Abiola
Senior Piping Design Engineer at KOA Oil & Gas Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
KOA Oil & Gas Limited
-
Nigeria
-
Oil and Gas
-
1 - 100 Employee
-
Senior Piping Design Engineer
-
Mar 2023 - Present
Saipem Contracting Nigeria Limited / KOA Oil and Gas Limited Project: HI Development Project – Post FEED Client: SPDC / Sunlink JV Position: Senior Piping Design Engineer Duration: March 2023 – Till date Responsibilities: Placed Pipe Supports on the 3D Model using stress isometrics. Updated the Safety Equipment Layout on the 3D Model. Updated the Architectural Layout on the 3D Model. Modelled the HVAC system on the 3D Model. Updated Overall Facility Layout. Show less
-
-
-
Frazimex Engineering Limited
-
Nigeria
-
Oil and Gas
-
1 - 100 Employee
-
Senior Piping Designer
-
Jun 2022 - Oct 2022
Project: FEED for Project Shawa Phase 1 Client: SEPLAT Position: Senior Piping Designer Duration: June 2022 – October 2022 Responsibilities: Prepared the Plot plan for Otumara Manifold and Split flow control stations. Prepared the equipment layout of the Otumara Manifold station. Carried out the 3-D model of the Otumara Manifold and Split flow control stations Carried out piping studies of the Otumara Manifold and Split flow control stations. Prepared the Piping general arrangement drawings of the Otumara Manifold and Split flow control stations. Prepared the piping isometric drawings of the Otumara Manifold and Split flow control stations Prepared the Piping Key plans of the Otumara Manifold and Split flow control stations. Prepared the piping support location of the Otumara Manifold and Split flow control stations. Prepared the bulk MTO. Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
Senior Piping Designer
-
Jul 2021 - Apr 2022
Project: Bonga North Tranche-1 Project Client: Shell Nigeria Exploration and Production Company Limited (SNEPCo) Position: Senior Piping Designer Responsibilities: Extracted the equipment layout drawings (plan and elevation) from E3D for starboard subsea, main rack 2 and port subsea modules. Carried out the 3-D model of the port subsea and starboard modules. Prepared the safety equipment layout drawings for starboard subsea, main rack 2 and port subsea modules. Prepared the escape route layout drawings for starboard subsea, main rack 2 and port subsea modules. Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
Senior Piping Design Engineer
-
Mar 2020 - Sep 2020
Project: Jisike Flowstation Debottlenecking and Gaslift System Upgrade Project Client: SEPLAT Position: Senior Piping Designer Responsibilities: Prepared the Overall Plot plan. Prepared the equipment layout of the Jisike flowstation and gaslift compression stations. Carried out piping studies of the gaslift compression station. Prepared the Piping general arrangement drawings of the gaslift compression station. Attended weekly review meetings with the client. Prepared the piping support standard drawings. Prepared the valve list, tie-in list and the specialty item list using Microsoft excel. Prepared the piping Material Take-Off (MTO). Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
Senior Piping Designer
-
Oct 2019 - Dec 2019
Project: Samabri Biseni Field Development Project Client: NAOC Position: Senior Piping Designer Responsibilities: Prepared the piping general arrangement drawings for Area 360.01 LP & MP compressors, Area 300 NAG separator, Area 200.01 LP & MP separators and Area 100.03 pipe rack of Idu flowstation. Prepared the piping general arrangement of drawings for Area 100.02 pipe rack, Area 190.02 Gas Pipeline Launching Trap, Area 220.04 pipe rack and Area 220.04 NAG Separator of Idu flowstation. Prepared the Tie-in location and layout of Idu flowstation. Prepared the Key plan for Cluster 4. Prepared the Piping general arrangement drawings of the Wellhead, Flowline, Manifold and Pipeline area for Cluster 4. Prepared the Key plan for Cluster 6. Prepared the Piping general arrangement drawings of the Wellhead, Flowline, Manifold and Pipeline area for Cluster 6. Prepared the Key plan for Idu flowstation. Show less
-
-
-
Ruth'Rford Services Limited
-
Nigeria
-
Senior Piping Designer
-
Jul 2019 - Aug 2019
Project: Pre-Paid Metering Solution and Volumetric Control System Client: Nigerian Gas Marketing Company (NGMC) Position: Piping Engineer Responsibilities: Carried out site visit survey on the facilities. Prepared the general arrangement drawings (plan) for the facilities. Generated the sectional view drawings for the facilities. Prepared the piping support location drawings for the facilities. Generated the piping isometric drawings for the facilities. Prepared the Material Take-Off (MTO) for the facilities. Prepared the Tie-in list for the facilities. Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
-
Oct 2018 - May 2019
Project: NLNG Train 7 Feed ProjectClient: NLNGPosition: Technical Safety DesignerResponsibilities: Designed the Escape Route Layout Drawings for Complete Train, Offsite and Utilities greenfield (OUG), Offsite and Utilities greenfield (OUG) and Offsite and Utilities Brownfield (OUB) facilities. Designed the Hazardous Area Classification layout drawings for the Complete Train, Common Liquefaction Unit (CLU), Offsite and Utilities greenfield (OUG) and Offsite and Utilities Brownfield (OUB) facilities. Designed the Fire and Gas layout drawings for the Complete Train, Common Liquefaction Unit (CLU), Offsite and Utilities greenfield (OUG) and Offsite and Utilities Brownfield (OUB) facilities. Designed the Fire Protection and Safety Equipment layout drawings for the Complete Train, Common Liquefaction Unit (CLU), Offsite and Utilities greenfield (OUG) and Offsite and Utilities Brownfield (OUB) facilities. Designed the Process Engineering Flow Scheme for Offsite and Utilities Brownfield (OUB) and Common Liquefaction Unit facilities. Designed the Fireproofing layout drawings for Offsite and Utilities greenfield (OUG) and Offsite and Utilities Brownfield (OUB) facilities. Show less
-
-
-
Mar 2018 - Oct 2018
Project: FEED and EPCI cost estimate for replacement of crude and products pipelines and depot upgrade projectClient: Nigeria Pipelines and Storage Company (a subsidiary of NNPC) Position: Senior Piping Designer.Responsibilities: Reviewed client’s drawings and documents. Reviewed and marked up existing drawings for Port Harcourt and Enugu stations Carried out back drafting of equipment layout and general arrangement drawings of Port Harcourt depot. Carried out back drafting of equipment layout and general arrangement drawings of Enugu depot. Prepared the overall plot plans of Abudu, Auchi and Sarkin Pawa pump stations. Prepared the equipment layouts and piping general arrangement drawings of Abudu and Auchi pump stations. Carried out back drafting of overall plot plan of Kano depot. Prepared the equipment layout and piping general arrangement drawing of Kano depot. Carried out back drafting of plot plan and equipment layout Suleja depot. Carried out back drafting of plot plan and equipment layout Jos depot. Show less
-
-
-
DGS Integrated Projects Limited
-
Nigeria
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical/Piping Design Engineer
-
Jun 2017 - Dec 2017
Project: Sapele Gas Plant Project Client: SEPLAT Position: Mechanical/Piping Design Engineer Responsibilities: Carried out mechanical and piping studies as required on project. Reviewed and collated other discipline documents relevant for my work. Preparation of equipment layout drawing. Preparation of tie-in list. Preparation of procurement list of new equipment. Project: Sapele Gas Plant Project Client: SEPLAT Position: Mechanical/Piping Design Engineer Responsibilities: Carried out mechanical and piping studies as required on project. Reviewed and collated other discipline documents relevant for my work. Preparation of equipment layout drawing. Preparation of tie-in list. Preparation of procurement list of new equipment.
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
Senior Piping Designer
-
Oct 2014 - Jun 2015
Project: PPMC Tank Farm Project (Conceptual/FEED) Client: NNPC Position: Senior Piping Engineer Responsibilities: Reviewed the survey layout drawing. Prepared the overall plot plan. Prepared the equipment layout drawing. Supervised and worked closely with piping designers to ensure quality of project drawings. Ensured piping design work is carried out using latest process P&ID and layout drawing. Attended project kick-off and review meetings. Project: PPMC Tank Farm Project (Conceptual/FEED) Client: NNPC Position: Senior Piping Engineer Responsibilities: Reviewed the survey layout drawing. Prepared the overall plot plan. Prepared the equipment layout drawing. Supervised and worked closely with piping designers to ensure quality of project drawings. Ensured piping design work is carried out using latest process P&ID and layout drawing. Attended project kick-off and review meetings.
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
-
Apr 2014 - Jul 2014
Project: Sapele Flowstation As-Built Survey and Documentation ProjectClient: SEPLATPosition: Senior Piping DesignerThis is an As-built Project that focuses on a number of existing operational facilities (flow stations, manifolds, gas plants, compressor stations, pipelines and bulklines) that have been modified and/or new facilities installed as a result of increased productions from development of these fields. In addition, drawings and documents inherited from former facilities owner (Shell) are obsolete and do not have standard drawing format currently obtainable in the oil and gas industry, let alone having numbers/tags conforming to Seplat numbering/tagging policy. Since a large amount of information is required to safely operate and maintain company existing and new facilities, update of information is therefore necessary.Responsibilities: Reviewed the As-built drawings. Implemented the redline markup carried out during the site visit to update existing drawings. Developed the general arrangement drawings. Generated the sectional view drawings. Show less
-
-
-
Feb 2014 - Apr 2014
Project: Enang JA Gas Lift ProjectClient: Mobil Producing Nigeria Unlimited (MPNU)Position: Senior Piping DesignerThis is a Detailed Engineering Design (DED) project that involved facility modifications using tubing –based gas lift facilities with lokring fittings for the Enang JA platform and also to drive the gas from the producing wells to the non-producing wells in order to increase crude oil production through gas lifting operations on the wellhead platforms.Responsibilities: Carried out piping studies and design as required on project. Reviewed and collated other discipline documents relevant for my work. Carried out back-drafting of checked works. Supervised the role of the piping designers. Prepared the Material-Take –Off (MTO) using P&IDs, GAs, section drawings & Global Practice standards such as ASME 16.5, ASME 16.9, ASME 16.10, API 6D,et cetera. Attending project review meeting with client. Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
Piping Designer
-
Jul 2012 - Dec 2013
Project: Pig Trap Modification Project Client: Chevron Nigeria Limited Position: Piping Designer Responsibilities: Reviewed the As-built drawings of all the platforms. Developed the equipment layouts for the Okan PP, Okan Sat1 and Okan Sat2 platforms. Prepared the general arrangement drawings (plan) for the Okan PP, Okan Sat1 and Okan Sat2 platforms. Generated the sectional view drawings for the Okan PP, Okan Sat1 and Okan Sat2 platforms. Generated the piping isometric drawings for the Okan PP, Okan Sat1, Okan Sat2, West Isan and Isan platforms. Prepared the pipe support location drawings. Prepared the tie-in list. Show less
-
-
-
National Engineering and Technical Company
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
-
May 2011 - Dec 2011
Project: Escravos Produced Water Disposal ProjectClient: Chevron Nigeria LimitedPosition: Piping DesignerResponsibilities: Prepared the piping general arrangement drawings (plan and elevations) of the EGP3-Launcher area. Prepared the equipment layout drawing of the dehydration area. Generated the piping isometric drawings of the EGP3 area. Prepared the Material Take-Off (MTO) for the above the Delta south quarters area scope. Prepared the pipe support location drawing Prepared the pipe support standard drawings. Prepared the tie-in list. Prepared the Material Take-Off (MTO) for the Escravos area using Microsoft excel. Prepared the Piping Bulk Bill of Material (BOM) for the DSQ-SOWIP area using Microsoft excel. Prepared the specialty item list. Show less
-
-
-
Aug 2010 - May 2011
Gbaran Ubie Phase II ProjectClient: Shell Petroleum Development CompanyPosition: Trainee EngineerResponsibilities: Prepared the tie-in list. Prepared the preliminary and detailed Material Take-Off (MTO) for all the wells using Microsoft excel. Prepared the specialty items such as chemical injection connection, sample connection, corrosion coupons et cetera. Prepared the valve data sheet and valve list.
-
-
Education
-
Federal University of Technology Akure
Bachelor of Engineering (BEng), Mining Engineering