Karamveer Singh Rathore

Assistant Manager at Sterling and Wilson Renewable Energy
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tharad, Gujarat, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Class A Electrical Supervisor License
    Rajasthan Energy Department
    Feb, 2021
    - Nov, 2024

Experience

    • India
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Assistant Manager
      • Dec 2022 - Present

      Site Incharge- 50MW Solar power plant Site Incharge- 50MW Solar power plant

    • Services for Renewable Energy
    • 700 & Above Employee
    • Senior Engineer (O&M)
      • Sep 2021 - Dec 2022

      Scada monitoring of 300 MW solar plant and 220/33kv switcyard & 33kv side switchgear and check all Inverters string & performance on daily basis. Scada communication fault rectification of all blocks with O&M team and keep max scada availablity for better performance of plant. Overall Responsible for all weather monitoring system of all blocks, Analyze the WMS data in respect to reach other Ensure proper data quality. Coordinating & liasoning with Govt. officials, Clients for JMR. Responsible for preparation of daily generation, monthly generation & complete plant operations reports. Ensure to follow all safety process, rules & regulations (LOTO,PPEs) and schedule training for same. Coordination with O&M contractor to improve plant performance. • Maintenance works of 220 KV SF6 Breaker of ABB -make LTB245E1, 33 KV VCB of Siemens make. • Maintenance works of 220/33 KV Switch-yard. • Handle the critical condition of plant trip.numerical protection ABB relay (REL670, REL615, RET670,RET615) Show less

    • India
    • Renewable Energy Semiconductor Manufacturing
    • 700 & Above Employee
    • Engineer (O&M)
      • Jan 2019 - Aug 2021

      Responsible for looking, planning & execution of 220/33 KV Substations (Wind Power Plant), 33kv/690V WTGs locations HT yard and 33Kv transmission line for smooth Power Evacuation. Erection, Testing, Commissioning of new Transformers (1.5 MVA to 2.5 MVA), Circuit Breakers,Isolators, Protective Relays, CR Panel MFMs etc. Managing overall activities of Operation & Maintenance, Testing of a wide range of Substation Equipment & Transmission Lines. Planning & supervising the functions of Troubleshooting, Predictive/Preventive Maintenance for smooth operation & reducing downtime to minimum. Maintaining Various documents of Substation and transmission line ( i.e. PTW, DOR, DPR, RCA, MRM, Monthly report, T/L Monthly planning, T/L O&M Report etc. ). Inspection of Fire Extinguishers and all other PPEs & Fire Safety process analysis, maintaining all safety checklists as per company norms. Conducting daily TBT with workers to ensure maximumsafety during work as per company HSE Policy. Maintaining various HSE parameter Lading & Lagging ( i.e. JSA PTW, TBT, Unsafe condition and Unsafe act, Near miss reporting, work place inspection, Safety interactions, mock drill forsafety awareness ). Preparing monthly JMR & Billing ofsite. Handling vendor manpower of Substation O&M and Transmission Line maintenance team. Show less

  • Prime Engineers
    • Rajkot, Gujarat, India
    • Site Engineer
      • Jun 2018 - Dec 2018

      Proficient in project management & encompassing project planning, scheduling, project costing, finalization of schedules and progress monitoring for project activities in the plant. Work scheduling & planning, Manpower Handling,Work Distribution, Panel Erection,MCC Pane, PCC panel and Drives Drives Panels testing and commissioning, cabletrench & trey rooting, cable laying scheduling and Control cable termination. Proficient in project management & encompassing project planning, scheduling, project costing, finalization of schedules and progress monitoring for project activities in the plant. Work scheduling & planning, Manpower Handling,Work Distribution, Panel Erection,MCC Pane, PCC panel and Drives Drives Panels testing and commissioning, cabletrench & trey rooting, cable laying scheduling and Control cable termination.

  • Vedansh Infra Services Pvt Ltd.
    • Chittorgarh, Rajasthan, India
    • Electrical Supervisor
      • Jan 2017 - May 2018

      • Took care of operation and maintenance HT & LT incomer, transformer & motor feeders and maintainedHT-LT motors and feeders according to preventive maintenance schedule. • Testing of HT motor up to 3.4MW and transformer up to 35MVA in plant. • Safely operation and changeover between two 6.6KV double bus boards at 132KV sub-station. • Providing emergency supply in case of blackout and developed necessary system to provide emergencysupply to critical equipment in plant. • Machine condition monitoring including periodically measurement of vibration, unusal sound, oil leveletc. • Underground cable fault location, Hi-pot testing, Earthing pits testing. Show less

Education

  • Institute of technology and management bhilwara
    Bachelor of Technology - BTech, Electrical Engineering
    2012 - 2015
  • State Board of Technical Education Rajasthan jodhpur
    diploma, Electrical engineering
    2008 - 2012
  • Birla Shiksha Kendra Chittorgarh
    Secondary school
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now