Kamran Khan

Signalling Engineer (ERTMS/ETCS Level 2 Operation and Maintenance) at XRail Group Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jeddah, Makkah, Saudi Arabia, SA
Languages
  • English Professional working proficiency
  • Urdu Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Fire Marshall (FM)
    New Skills Academy
    Feb, 2021
    - Nov, 2024
  • LEVEL 2 CERTIFICATE IN WORK PLACE FIRST AID TRAINING
    Alpha Academy
    Feb, 2020
    - Nov, 2024
  • Accredited Professional Electrical Engineer
    Pakistan Engineering Council (PEC)
    Jun, 2014
    - Nov, 2024
  • Accredited Electrical Engineer
    Saudi Council of Engineers
    Mar, 2020
    - Nov, 2024
  • Axle Counters AzLm
    Thales
  • Certified Works Foreman for Haramain High Speed Railways Project
    ADIF
  • Point Machines L826H
    Thales

Experience

    • United Kingdom
    • Transportation/Trucking/Railroad
    • 1 - 100 Employee
    • Signalling Engineer (ERTMS/ETCS Level 2 Operation and Maintenance)
      • Nov 2020 - Present

      Project Overview: Al-Haramain High-Speed Rail is a 453KM track having 5 passenger stations & Depots. X-Rail awarded with 8 years Operation & Maintenance of Signaling & low voltage part for the whole track. Responsibilities: Carrying out real-time troubleshooting of faults on System software, Technical buildings & trackside. Working on the communication Computers i.e. LOC, LEC, GDI, ICE A, ICE B, JRU, JRUR, MAS & MASR. Working on Moviolaw 2.0, both for interlocking and ERTMS/ETCS L2. Working on the RBC i.e. resetting of RBC by DAQ NAVI software, Lanes, Patch Panel, TCC, and PC debug of the RBC. Responsible for Preventive & Corrective Maintenance of point machines (Thales L826H). Point machines maintenance includes adjustments of the detection bars, installation, changing oil, replacement of the terminal boards inside point machine, air removal, Greasing etc. Responsible for P & C Maintenance of Thales axle ZP 30H and Siemens axle counters installed on track side. Responsible for P&C Maintenance of track side signals. Signal maintenance includes adjustments of the voltage and current values for the different aspects, installation, repairing or replacement of the faulty component. Responsible for P & C maintenance of Eurobalise & performed programming through TPG. Responsible for the Preventive & Corrective maintenance for the following cubicles, Westrace 2.0 cubicle RBC (Radio Block Centre) Cubicle ACE (Axle Counter Evaluator) Cubicle PDC (Power Distribution Cubicle) Auxiliary Cubicle Comms Cubicle Cable Rack Responsible for BOCC (Backup Operating Control Center) which involve working on CFE (Communication Front End), GIS (Graphic Interface Server), HMI, EIS & IIS Server, CTC Server, CEC Server, MAS-C. Coordinate with the Client regarding daily faults & its updates. Preparing daily shift reports, incident reports, and maintaining maintenance records of all activities. Responsible for inventory & spare parts management. Preparing & updating replenishment reports. Show less

    • Italy
    • Construction
    • 1 - 100 Employee
    • Electrical Engineer
      • Nov 2017 - Present

      Project Overview: Riyadh Metro train line-03 is a 42KM track including 22 passengers stations & 2 depots. ANM is the lead consortium and AKH is a joint part of Electrical infrastructure & Implementation. Duties and Responsibilities • Responsible for signaling construction activities. • Point machine installation testing and commissioning. • Axle counters installation, calibration, testing, and commissioning. • Signals installation, testing, and commissioning. • Follow-up the RFI approval for signaling equipment installation. • Carry on signaling construction activities as per RMTC safety requirements. • Inspection of PSD & patch panels testing and pre-commissioning activities. • Inspection and testing of electrical equipment’s, power cable and FO cable s, junction box, Local control panel and distribution panels. • Inspection of Cable tray Installations, and fittings in hazardous and non-hazardous areas. • Arrangement of utility material to fulfill the requirements on site. • Monitoring Workers for their workmanship as per standards. • Coordinate with the (sub) contractors and facilitate vendors on pre-comm. • Verify the accuracy and completeness of the ‘as-built drawings. • Final inspection for the documentation and as-built drawings. • Preparation of QC dossier for submission to the client, Review drawings. Show less

    • Saudi Arabia
    • Telecommunications
    • 700 & Above Employee
    • Electrical Engineer
      • Mar 2015 - Oct 2017

      Project Overview: Conduct Benchmarking Drive Test for STC, Mobily and Zain Network Operators in Saudi Arabia for all Technologies. Comparing and Evaluating Quality of Service for the Various Network Parameters. Duties and Responsibilities • Conduct Benchmarking Drive test for All the Network Operators in Saudi Arabia for all Technologies. Comparing and Evaluating the Various Network Parameters like Call Setup, Blocked CallsRate. • Successful Handover, Call Setup time, Handover Failure Rate and Call Drop for all Network Operators in Saudi Arabia. • Monitoring the Signal Strength for all Technologies like 2G Rx level ,3G RSCP and 4G RSRP (FDD & TDD) • Monitoring the Signal Quality for all Technologies like 2G C/I , 3G Ec/Io and 4g RSRQ (FDD& TDD) • Conducting Drive Test Through Tools SWISS QUAL Bench-marker system for Car. • Monitoring the Parameters through NQ View Tools for STC, Mobily and Zain. • After the Drive Test Collecting the measurement Files from the Measurement tools and Generating Technical Report for CITC. • Analysis the Technical Report and Provide Comment accordingly, Plan and conduct the test according to CITC Schedule. • Executing the Drive test Plan Within the provided guidelines of CITC. • Performed Special Walk Test for IBS with the Help of Free rider Equipment • Performed RF Measurements on sites for the operators STC, Mobily and Zain upon request and complaints of customers to the CITC. • Measuring GSM900, GSM1800, WCDMA, UMTS2100, WiMax(2.5GHz) and WiMax(3.5GHz) like KPI’s and Calculation of Power Density. • Preparing a detailed Technical report showing Power Density value and radiation level to the public limits of the national Guidelines. Show less

    • Pakistan
    • Telecommunications
    • 1 - 100 Employee
    • Communications System Engineer
      • Mar 2014 - Feb 2015

      Project Overview CM-Pak ZTE ALU Swap 3G Installation Project Duties and Responsibilities • Supervising installation, commissioning and integration of GSM. • Supervising wireless communications equipment installation work. • Material identification and verification. • Supervision of Feeder/Jumper/MW RF cable, connector as per standards, RF cable laying & routing. • Coordinating the work with Managers and as well as with the field teams. • Quality maintenance of new sites and acceptance of new sites. • Supervision and installation of RRU , Antennas, BBU in BTS. • Installation and Integration of BBU 8200. • Supervision of Installation the 3G RRU 2100 MHz • Supervision of Installation the different cards used in the BBU i.e. FS, CC, UBK, LBK. Cascading of RRU’s 2100 MHz, 1800 MHz and 900 MHz with one another and performing Site Quality Show less

Education

  • University of Engineering & Technology Peshawar
    Bachelor's of Science (B.Sc), Electrical Engineering
    2010 - 2014
  • Board of Intermediate and Secondary Education Peshawar
    Higher Secondary School Certificate, Pre-Engineering

Community

You need to have a working account to view this content. Click here to join now