Kamil Świech

Dyrektor Techniczny ds. Geodezji at MIRBUD S.A.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Skierniewice, Łódzkie, Poland, PL

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Poland
    • Construction
    • 100 - 200 Employee
    • Dyrektor Techniczny ds. Geodezji
      • Apr 2023 - Present

    • Kierownik Działu Obsługi Geodezyjnej
      • Jun 2021 - Apr 2023

    • Poland
    • Construction
    • 100 - 200 Employee
    • Land Surveyor
      • Jun 2019 - Jun 2021

      3D MODELING, GROUND WORKS CALCULATIONS, PREPARING DATA FOR SITE MACHINES: GRADERS, BULLDOZERS, EXCAVATORS (SITE POSITIONING SYSTEMS: LEICA AND TRIMBLE), DRONE SURVEYS WITH DATA PREPARATION, CLASSIC GEODESY SURVEYS. 3D MODELING, GROUND WORKS CALCULATIONS, PREPARING DATA FOR SITE MACHINES: GRADERS, BULLDOZERS, EXCAVATORS (SITE POSITIONING SYSTEMS: LEICA AND TRIMBLE), DRONE SURVEYS WITH DATA PREPARATION, CLASSIC GEODESY SURVEYS.

  • MAPA
    • Warsaw, Masovian District, Poland
    • Chief Surveyor
      • Apr 2017 - May 2019

      SURVEYOR INSPECTOR FOR REBULDING OF S8 EXPRESS ROAD IN POLAND. CLASSIC SURVEYS: SETTING OUT, ''AS BUILTS'', DATA CONTROLLER, DRONE SURVEYS, MAPPING, 3D MODELING, GPS. SURVEYOR INSPECTOR FOR REBULDING OF S8 EXPRESS ROAD IN POLAND. CLASSIC SURVEYS: SETTING OUT, ''AS BUILTS'', DATA CONTROLLER, DRONE SURVEYS, MAPPING, 3D MODELING, GPS.

    • United Kingdom
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Surveyor/3D CAD Engineer
      • May 2014 - Dec 2016

      CLIENT: COSTAIN- BIM MODEL COORDINATOR- SETTING OUT, ''AS BUILT'SURVEYS- DESIGN FOR CCJV PROJECT OFFICE - DESIGN FOR TEMPORARY SLIP ROADS ON M1- WORKS TRACKING- STATS DATA COORDINATOR COURSES:- FIRST AID- CAT & GENNY- BENTLEY MICROSTATION V8i (BASIC &3D)

    • Site Engineer
      • Nov 2013 - Apr 2014

      CLIENT: BAM NUTTALL LIMITEDBAP.1150 OLYMPIC PARK NORTH & SOUTH TRANSFORMATION.SETTING OUT, "AS BUILT' SURVEYS, PREPARATION OF DIARY SHEETS, PREPARATION OF PERMIT'S TO DIG.

    • Site Engineer
      • Oct 2013 - Nov 2013

      Client: VolkerFitzpatrick LtdSetting out duties during construction of London GATEWAY: C11084 DP World Port Access Road C10999 DP World Port Access Setting out, 'as built' surveys, volumetric calculations.

    • United Kingdom
    • Construction
    • 500 - 600 Employee
    • LAND SURVEYOR
      • Oct 2012 - Jul 2013

      SURVEYOR IN THE MONITORING OF THE UNDERGROUND CONSTRUCTION, CROSSRAIL C300 IN LONDON. MONITORING OF LONDON UNDERGROUND STATIONS AND TUNNELS ON THE PATH OF TBM FROM PADDINGTON STATION THROUGH ROYAL OAK, LANCASTER GATE, MARBLE ARCH, BOND STREET, OXFORD CIRCUS, TOTTENHAM COURT ROAD, HOLBORN PRECISE LEVELLING OF STREETS, PATHWAYS AND BUILDINGS. PRECISE LEVELLING OF LU TRACK AND TUNNELS AND TOTAL STATION SURVEYS OF PRISMS AND TARGETS. DATA PROCESSING. SURVEYOR IN THE MONITORING OF THE UNDERGROUND CONSTRUCTION, CROSSRAIL C300 IN LONDON. MONITORING OF LONDON UNDERGROUND STATIONS AND TUNNELS ON THE PATH OF TBM FROM PADDINGTON STATION THROUGH ROYAL OAK, LANCASTER GATE, MARBLE ARCH, BOND STREET, OXFORD CIRCUS, TOTTENHAM COURT ROAD, HOLBORN PRECISE LEVELLING OF STREETS, PATHWAYS AND BUILDINGS. PRECISE LEVELLING OF LU TRACK AND TUNNELS AND TOTAL STATION SURVEYS OF PRISMS AND TARGETS. DATA PROCESSING.

  • GEO-BIT S.C.
    • Skierniewice, Lodz District, Poland
    • LAND SURVEYOR
      • Sep 2011 - Jun 2012

      SURVEYOR PROJECT MANAGER OF SERVICES INVESTMENT SURVEYOR MANAGER IN THE CONSTRUCTION OF THE EXPRESSWAY S17 SECTOR KUROW-LUBLIN-PIASKI IN POLAND. SURVEYOR MANAGER OF EXPRESSWAY JUCTION CONSTRUCTION : BUGUCIN JUNCTION , DABROWICA JUNCTION. CREATING ELECTRONIC PROJECT BASED ON ANALOG. DOCUMENTATION OF STAKING, INVENTORY'S, SALES RECORDS, COUNTING VOLUME'S, COOPERATION WITH THE INSPECTOR SURVEYING, PROJECT MANAGEMENT, CONTRACTORS. CONDUCTING SURVEYOR'S TEAMS, DATA PREPARATION, CONSULTATION, CONTROL GEODESIC POINTS, DATA PROCESSING Show less

    • Poland
    • Construction
    • 700 & Above Employee
    • LAND SURVEYOR
      • Jul 2010 - Sep 2011

      SURVEYOR IN THE CONTRUCTION OF EXPRESSWAY JUNCTION IN STRYKOW, POLAND. CONSTRUCTION OF THE SEWAGE SYSTEM PROBOSZCZEWICE IN ZGIERZ, POLAND.OFFICE WORK : DOCUMENTATION OF STAKING, INVENTORYS, SALES RECORDS, COUNTING VOLUMES, COOPERATION WITH THE INSPECTOR SURVEYING, PROJECT MANAGEMENT, CONTRACTOR'SCONDUCTING SURVEYORS TEAMS, DATA PREPARATION, CONSULTATION, CONTROL GEODESIC POINT'S, DATA PROCESSING

    • LAND SURVEYOR
      • Sep 2009 - Jul 2010

      LAND SURVEYOR IN THE CONSTRUCTION OF A NATIONAL ROAD No. 50 IN MSZCZONOW, POLAND.

    • Ireland
    • Food and Beverage Services
    • 700 & Above Employee
    • SALES REPRESENTATIVE
      • Sep 2007 - Sep 2008

      SALES AND DISTRIBUTION OF MERCHANDISE TO PRIVATE SHOPS AND BRANCHES. SALES AND DISTRIBUTION OF MERCHANDISE TO PRIVATE SHOPS AND BRANCHES.

  • SURVEYING COMPANY DELTA
    • Skierniewice, Lodz District, Poland
    • JUNIOR LAND SURVEYOR
      • Mar 2007 - Jul 2007

      JUNIOR LAND SURVEYOR IN THE EXPANSION OF RATAJA AVENUE , SEWAGE SYSTEM AT ZWIERZYNIECKA STREET AS WELL AS CONSTRUCTION OF THE MAIN MARKET SQUARE IN SKIERNIEWICE, POLAND JUNIOR LAND SURVEYOR IN THE EXPANSION OF RATAJA AVENUE , SEWAGE SYSTEM AT ZWIERZYNIECKA STREET AS WELL AS CONSTRUCTION OF THE MAIN MARKET SQUARE IN SKIERNIEWICE, POLAND

Education

  • UNIVERSITY OF ECONOMICS IN KUTNO PL
    ENGEENER, GEODESY AND CARTOGRAPHY
    2003 - 2007
  • TECHNIQUE IN HOSPITALITY INDUSTRY
    TECHNIQUES, HOTEL MANAGEMENT
    1998 - 2003

Community

You need to have a working account to view this content. Click here to join now