Kalidoss Kasirajan
Cost Control Engineer at Asset Homes- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Asset Homes
-
India
-
Real Estate
-
100 - 200 Employee
-
Cost Control Engineer
-
Dec 2016 - Present
• Prepare actual BOQ for all the activity of the project.• Reviewing the actual estimate based on structural completion and sample apartment completion.• Verification of Designs (Structural & Finishes), variations and material reconciliation.• If there is any variation in an activity, check that particular activity and if found the variation is reasonable, approving the cost variation and make the necessary change in the budget.• Determine cost estimate targets during the design and development process, recommending cost effective solutions. Checking the design layouts, whether it is feasible or not, to reduce wastage.• Keep tracking the actual cost of each and every activity of the project with the estimated cost of the project.• Prepare monthly report for the monitoring of various activities on a daily basis and register all downtime, consumption and activity related issues relating to the project.• Monitoring the cost of the activity against the budget before it is being committed.• Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that expenditures are kept within the project budget.• Each month updating the material consumption of every site.• Keep track on hire orders, direct labour cost, repair and rework cost to control overall budget of the project.
-
-
-
-
Project Coordinator
-
Aug 2014 - Dec 2016
• Study drawings and analyse every detail.• Plan the work according to the time schedule and make the workers to finish it on time.• Arranging the materials – Take the quantity from the drawing prior to the work and send purchase request through Quadra.• Follow up the purchase department.• If the quantity was not adequate in Quadra, amend the quantity.• Ensure the material received according to the purchase order.• Arrange the Contractor/Labour, prior to the work start.• Prepare checklist for each activity.• Check the quality of the work done and minimize the material wastage.• Once the work done, taking the actual site measurements.• Check Contractor's bill and prepare Mbook in Quadra.• Maintain all other site documents like Pressure testing register, Curing register, etc.• Properly manage the Contractor/Labour for the parallel going jobs.• Ensure the safety of the workers, giving them proper instructions at regular intervals.• Managed an approximate group of 150 labours.
-
-
-
-
Site Civil Engineer
-
Jun 2013 - Jul 2014
• Quality Assurance.• Quantity taking including Concrete work, Brick work, Steel, Wood work, etc.• Arrange materials, contractors/labours.• Check contractor's bill.• Prepare daily, monthly progress report.• Plan and coordinate to complete the project in the scheduled time. (Coordinate the work among contractors, client and architects) • Quality Assurance.• Quantity taking including Concrete work, Brick work, Steel, Wood work, etc.• Arrange materials, contractors/labours.• Check contractor's bill.• Prepare daily, monthly progress report.• Plan and coordinate to complete the project in the scheduled time. (Coordinate the work among contractors, client and architects)
-
-
Education
-
Arulmigu Meenakshi Amman College of Engineering
Bachelor's degree, Civil Engineering