Kailash Chandra Joshi

Live Fault Response Manager at Keolis MHI
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Truck Transportation
    • 1 - 100 Employee
    • Live Fault Response Manager
      • Sep 2021 - Present

    • ATC Manager
      • Nov 2013 - Oct 2021

      Serco Dubai Metro Project : Lead and give guidance to ATC team in Carrying out all level of preventive and corrective maintenance activities for the ATC equipment’s covering System Management Centre, Vehicle Control Centre, Central Control (vital and non-vital),vehicle on-board equipment and Wayside Equipment. Assist the ATC & Systems Manager in maintenance budgeting, managing and allocating resources to all aspects of maintenance activities within ATC system Supervise and oversee all aspects of engineering and maintenance activities pertaining to the automatic train control system including software configuration management and technical support; Provide suggestions to improve the existing system performance including appropriate modifications, new works planning and implementation; Assist ATC & Systems Manager in designing and developing engineering and maintenance plans, procedures and instructions for ATC system; Provide training, support, guidance and system assurance on the engineering and maintenance of automatic train control system within the Engineering & Maintenance Department and to the wider O&M organization; Meeting the Key Performance Indicators according to the targets agreed with the ATC & Systems Manager; Manage the ATC system maintenance to ensure outputs are delivered to an appropriate standard on time and within the agreed maintenance budget. To be aware of, and play an active role in the development and implementation of the Integrated Management System and the content of the Health, Safety, Quality & Environment and Information Security Policy Statements, to ensure that these are implemented within their area of responsibility; Show less

    • IT Services and IT Consulting
    • 700 & Above Employee
    • Acting ATC Manager
      • Jun 2013 - Oct 2013

      Serco Dubai Metro Project : Lead and give guidance to ATC team in Carrying out all level of preventive and corrective maintenance activities for the ATC equipment’s covering System Management Centre, Vehicle Control Centre, Central Control (vital and non-vital),vehicle on-board equipment and Wayside Equipment.Assist the ATC & Systems Manager in maintenance budgeting, managing and allocating resources to all aspects of maintenance activities within ATC system Supervise and oversee all aspects of engineering and maintenance activities pertaining to the automatic train control system including software configuration management and technical support;Provide suggestions to improve the existing system performance including appropriate modifications, new works planning and implementation;Assist ATC & Systems Manager in designing and developing engineering and maintenance plans, procedures and instructions for ATC system;Provide training, support, guidance and system assurance on the engineering and maintenance of automatic train control system within the Engineering & Maintenance Department and to the wider O&M organization;Meeting the Key Performance Indicators according to the targets agreed with the ATC & Systems Manager;Manage the ATC system maintenance to ensure outputs are delivered to an appropriate standard on time and within the agreed maintenance budget.To be aware of, and play an active role in the development and implementation of the Integrated Management System and the content of the Health, Safety, Quality & Environment and Information Security Policy Statements, to ensure that these are implemented within their area of responsibility; Show less

    • ATC Engineer
      • Jan 2009 - May 2013

      SERCO DUBAI METRO PROJECT - E&MLead and give guidance to ATC team in Carrying out all level of preventive and corrective maintenance activities for the ATC equipment’s covering System Management Centre, Vehicle Control Centre, central control (vital and non-vital),vehicle on-board equipment and wayside equipment.Assist the ATC Manager in maintenance budgeting, managing and allocating resources to all aspects of maintenance activities within automatic train control system .Assist ATC Manager in designing and developing engineering and maintenance plans, procedures and instructions for ATC system.Provide training, support, guidance and system assurance on the engineering and maintenance of automatic train control system within the Engineering & Maintenance Department and to the wider O&M organisation.Provide suggestions to improve the existing system performance including appropriate modifications, new works planning and implementation.Maintenance planning, scheduling and liaising with different internal parties for maintaining the equipment at required level and to achieve KPI’s.Co-ordinating with different contractor for Level 3-5 Corrective and Preventive maintenance, and Associated with making technical fault report for better understanding of faults for other staff.Produce and Maintain accurate maintenance records.Assist Subordinate staff with the job familiarisation and provide technical support to staff.Responsible for assessment of ATC staff for Knowledge and competence in technical standards. Associated with training program for the training of newly recruited staff. Awareness of the Integrated Management System and the content of the Health, Safety, Quality & Environment and Information Security Policy Statements Show less

    • Railroad Equipment Manufacturing
    • 700 & Above Employee
    • Signalling Engineer
      • Jul 2003 - Dec 2008

      Delhi Metro Rail Project : Worked with Delhi Metro Rail Corporation Ltd. . Worked in Project of Line-1 (Shahdara-Rithala Metro elevated line, Length-22km), Line-2 (Vishwa Vidyalaya-Central Secretariat Metro underground line, Length- 11km), Line-3 (Barahkhamba – Dwarka Metro Line, Length – 22 km) & Line-3 Extensions (Dwarka Sector & IP extensions) Worked in close coordination with the line –3 contractor for Installation, Testing & Commissioning of Signaling & Train Control Equipments of M/s Siemens TS Ltd. i.e. SIMIS PC system, SICAS (Interlocking system), FTGS (Siemens Track Circuit System),Signal & Points (S700K Point Machine) for Line-3 (Barakhamba – Dwarka Sector 9) Metro Line. Responsible for the Maintenance of Signaling & Train Control Equipments of M/s Siemens TS Ltd. i.e. SIMIS PC system, SICAS (Interlocking system), FTGS (Siemens Track Circuit System),Signal & Points for Line-3 (Barakhamba – Dwarka) Metro Line. Responsible for onsite functional tests to ensure the correctness of the signalling logic as described in the Route Table & Interlocking Principles. Played an active role as a part of the team involved in interfacing with the designated contractor so as to finalize design for the signalling system to be implemented. Worked in close coordination with the line –1 & 2 contractor for Installation, Testing & Commissioning of Signaling & Train Control Equipments of M/s ALSTOM i.e. ASCV (Interlocking system), SDTC (Smart way Digital Track Circuit ) ,Signal & Points (MJ81 Point Machine) for Line-3 (Barakhamba – Dwarka Sector 9) Metro Line. Responsible for fault troubleshooting of Signalling & Train Control Equipment’s & systems of M/s Siemens TS Ltd. i.e. SIMIS PC system, SICAS (Interlocking system), FTGS (Siemens Track Circuit system) Points & Signals. Responsible for training of personnel regarding way side Signalling Equipment’s (FTGS (Siemens track Circuit System), Signal & Point). Show less

    • India
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Engineer WAN Operation
      • Jun 2002 - Jun 2003

      Satellite Communication System Project : Worked with HCL COMNET Systems & Services Ltd from June 2002 to June 2003.as an Engineer WAN Operation. Responsible for fault analysis and rectification the HUB RF equipment as well as to assist field engineers in diagnosing the field equipment faults both at software and hardware levels. Responsible for installation of new circuits and configuring the customer’s network for optimum bandwidth utilization. Satellite Communication System Project : Worked with HCL COMNET Systems & Services Ltd from June 2002 to June 2003.as an Engineer WAN Operation. Responsible for fault analysis and rectification the HUB RF equipment as well as to assist field engineers in diagnosing the field equipment faults both at software and hardware levels. Responsible for installation of new circuits and configuring the customer’s network for optimum bandwidth utilization.

Education

  • The University of Manchester
    Global MBA, MBA

Community

You need to have a working account to view this content. Click here to join now