Juvir Tanilon
SR QA/QC MEP ENGINEER at Horizon Gulf Electromechanical Services L.L.C- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Horizon Gulf Electromechanical Services L.L.C
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
SR QA/QC MEP ENGINEER
-
Dec 2021 - Present
-
-
-
Emarat - Emirates General Petroleum Corporation
-
United Arab Emirates
-
Oil and Gas
-
400 - 500 Employee
-
QA/QC MEP Inspector
-
Jun 2021 - Nov 2021
-
-
-
Berksan Engineering and Construction Inc.
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
QA/QC MEP ENGINEER
-
Jul 2019 - May 2021
• Prepare ITP for Approval by client • Review all Documents like method of Statement, Project Specification and ITP • Preparing for Inspection Monitoring • NRC/NCN monitoring and closed out • Snagging/Comment closed out at site • Conducting MEP site inspection construction and T&C Electrical Environmental Control System Air Condition and Ventilating System Fire Alarm System Fire Extinguishing system Tunnel Ventilation System • ACONEX Coordinator • Controlling DCC scope • Preparing and submitting Testing and commissioning procedure • Preparing and submitting Testing and commissioning Site test report • Project contract/ letter/procurement transmittal submission to client • Quality Surveillance all area in site • Quality Inspection in site • Issue of NCR for non-conforming the activity in site as per approved drawing. • Issue Technical Alert for the construction that make technical violation during work. Show less
-
-
-
Samsung Engineering
-
South Korea
-
Construction
-
700 & Above Employee
-
QA/QC E&I Inspector
-
Nov 2016 - Nov 2018
• Surveillance, monitoring and inspection of all work segments in the field Instrumentation such as installation of instrument equipment. • Verification of quality procedures with Construction Department, Project Management and client inspectors. • Preparing Non-Conformance Report if there is a non-conformity in the installation or violation of the International codes and Standards. • Keeping and updating of inspection records. • Preparing of FDM or Field Design Modification. Log book corrective action of client inspection comments. • Material receiving inspection for identification of quantity and damages. • Prepare Request for Inspection to client for acceptance of Installations and cable pulling trench cable arrangement. • Perform site supervision and monitor progress during construction phase and cable pulling schedule. • Coordinate and oversee the Instrumentation design and construction works of the Project and during cable pulling works for any changes in the duct bank and cable trench and cross section during pulling activities. • Prepare Request for Inspection to client for acceptance of secondary trunking and cable ladder tray. • Prepare Request for Inspection to client for acceptance of Impulse Tubing. • Prepare Request for Inspection to client for acceptance of Junction box installation. Show less
-
-
-
Hyundai Engineering Co. Ltd.
-
South Korea
-
Oil and Gas
-
700 & Above Employee
-
QA/QC E&I Inspector
-
Apr 2014 - Oct 2016
Responsibilities: • Prepare ITP for Approval by client • Review all Documents like method of Statement, Project Specification and ITP • Preparing for Inspection Monitoring • NRC/NCN monitoring and closed out • Snagging/Comment closed out at site Electrical • LV Switchgear glanding termination • LV Switchgear Internal cable loop testing • Fire Alarm testing and functional • Control cable and power cable glanding termination • Control Panel Termination • Loop Checking & Meggering and other electro-mechanical works • Fire Alarm system functional test • Familiar and experienced on all kinds of electrical works. Instrumentation • Pre commissioning works such as loop checking, valve stroke checking, field calibration of various instruments • Perform pre-commissioning of the instrumentation works to include level, temp, flow, pressure and associated DCS/ ESD /VMS and accessories • Troubleshooting of some problematic instruments • Instruments location mapping in preparation for loop checking • Transmitter troubleshooting • Valve stroke testing • Functional test MCR to JB using simulator • Check the flow transmitter calculation • Loop check – cylinder lube oil tank • Loop check – header oil pressure • Fixing the steam block of transmitter • Loop check – DC s to temperature transmitter • Measuring drop volatage to vibration sensor • Function test using druck/DPI GIO ( pressure calibrator ) • Function test (MCR panel) • Loop check the vibration sensor • Installation of impulse tubing to header oil pressure • Gas detector-field calibration function test • Wireless temp. and rod drop calibration Compressor load testing (MRT) troubleshooting IRP Display connection Show less
-
-
-
GS Engineering & Construction
-
Abu Dhabi, UAE
-
E&I Supervisor
-
Mar 2012 - Mar 2013
Responsibilities: • Transmitter Installation • Bench Calibration of pressure, level, flow, temperature switches and transmitters • Installation and line testing of power cables • Testing and commissioning • Field calibration of operated valve • Loop checking • Arrange daily permit with all related attachments, approve from permit to start work team • Monitor and measure team performance and conduct daily safety meeting • To arrange available Instrument Team according to the daily job requirement • Supervise the loop checking, calibration and function test of process instrument such as Pressure, Flow, Level and Temperature Transmitter. • Manage the daily work plans and performance of the instrument Technicians • Ensure the activities are carried out in line with procedures and standards Show less
-
-
Education
-
Cebu Institute of Technology
Bachelor of Science in Electronics and Communications Engineering, Bachelor of Science in Electronics and Communications Engineering