Junsang Cho

Electrical Designer at G. L. Smith Planning & Design Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Design Services
    • 1 - 100 Employee
    • Electrical Designer
      • Aug 2021 - Present

  • Tricontek Inc
    • Mississauga, Canada Area
    • Electrical Technician
      • Jun 2019 - Apr 2021

      Implemented the quality control program. Experienced in printed circuit board assembly and soldering through-hole and surface mount technology Inspect, test, and repair control panels. • Install and implement Mitsubishi Motion, PLC programs for rewinding and die cutting machines. • Recognize and troubleshoot faults on electrical circuits or integrated systems (e.g. interlocking, interrelated circuits of Pluto safety PLC, Mitsubishi servo motor, and PLC). • Inspect, assemble and install prefabricated parts to form electro-mechanical subassemblies. • Conduct tests on DC 24 volts, AC 110 - 480 volts circuit of the electrical control panel. Show less

    • Instrument Technician
      • Nov 2014 - Dec 2016

      Installed the electrical lines of equipment and hydraulic line assembling various types of electrical bucket cranes. • Installing Electrical and hydraulic lines on 79 units of Low-voltage insulated aerial platform for KEPCO • Assembling and Detailing and final inspection on Telescopic Insulated Aerial Work Platform – DHT 150 for exporting to New Zealand. Installed the electrical lines of equipment and hydraulic line assembling various types of electrical bucket cranes. • Installing Electrical and hydraulic lines on 79 units of Low-voltage insulated aerial platform for KEPCO • Assembling and Detailing and final inspection on Telescopic Insulated Aerial Work Platform – DHT 150 for exporting to New Zealand.

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • PLC Engineer
      • Aug 2012 - Nov 2014

      Created electrical schematics, and layouts by AutoCAD, and EPLAN. Programmed and tested on Electrical panels by Step 7, TIA Portal, WinCC. • PLC Engineering CU SIDE FAB HVAC and Testing electrical panel for SK Hynix in Korea • Revising drawings of refurbishment PLC 61, 62 Project for Hyundai steel in Korea • Main project Engineer of M11 Exhaust Sub Duct exhaust pressure at SK Hynix in Korea • Drawings and revising of M12 Phase2 HVAC and Testing electrical panel for SK Hynix in Korea Show less

Community

You need to have a working account to view this content. Click here to join now