Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Saudi Arabia
    • Environmental Services
    • 1 - 100 Employee
    • Staff Geologist
      • Dec 2021 - Present
    • Pakistan
    • Architecture and Planning
    • 100 - 200 Employee
    • Project Geologist
      • Sep 2021 - Oct 2021

      PROJECT: feasibility study of 5 metal reserves in Balochistan establish localities of metal ore in Balochistan with detailed information on reserves quantity, quality, and study status. Geo-fencing of metal ore deposits with help of GOOGLE EARTH PRO software and global mapper software PROJECT: feasibility study of 5 metal reserves in Balochistan establish localities of metal ore in Balochistan with detailed information on reserves quantity, quality, and study status. Geo-fencing of metal ore deposits with help of GOOGLE EARTH PRO software and global mapper software

    • Real Estate
    • 1 - 100 Employee
    • Self Employed
      • Jul 2021 - Aug 2021

      Project: Gurak Storage Dam (Methodology and Design for Spillway Excavation by Blasting) Organization: Noor Ul Haq Brothers Client: Balochistan Irrigation Department Duration: July 2021 – August 2021 Prepare Method Statement for Spillway and Intake Approach Channel by Control Blasting Techniques. Design blast pattern and initiation sequence for production and control blasting. Suggest standard techniques for riprap extraction by blasting. Project: Gurak Storage Dam (Methodology and Design for Spillway Excavation by Blasting) Organization: Noor Ul Haq Brothers Client: Balochistan Irrigation Department Duration: July 2021 – August 2021 Prepare Method Statement for Spillway and Intake Approach Channel by Control Blasting Techniques. Design blast pattern and initiation sequence for production and control blasting. Suggest standard techniques for riprap extraction by blasting.

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Sr. Geologist & incharge Tunnel & Surge Shaft
      • Nov 2015 - Jan 2020

       Involved in site Management and Geotechnical operations including Drilling and Blasting of Pressure Tunnel & Surge Shaft, Ground improvement Activities (Consolidation and Curtain Grouting of Dam Foundation and Tunnel Structures); Underground Support System and Ventilation Systems and all concerned activities; such as Site Planning, daily and monthly target planning, scheduling and implementation.  Create AutoCad template Drawings for Site testing procedure and reports. Retrieve and edit AutoCad Drawings for Site specifications.  Assist in project documentation including technical reports, method statements, and proposals, Desk studies and progress reports.  Perform logging and sampling of Drill-holes and Trenches; conduct Geological, Structural mapping Tunnel & Shaft Face and Wall Mapping.  Conduct Rock Permeability Test (lugeon Test) and Soil Constant Head Test.  Handle the tasks of guiding project staff regarding the required procedures in developing the project and suitability of the materials to be used.  Supervise Pressure Tunnel & Surge Shaft Invert concrete Lining Crown Concrete Lining.  Classify rock encounter in Tunnel & Shaft through standard method and suggest support measurements accordingly, Examine soil and rock to determine the safest, highest quality and cost-effective structures for the project.  Prepare Report of Tunnel & Shaft Support such as summary Rock bolt/Dowels, summary Drain holes and shotcrete, prepare daily request Blasting request, Shotcreting request and Support work Request.  Support mechanical and procurement department with determining choice of equipment required for Underground and Testing works Show less

      • Dec 2011 - Oct 2015

       Responsible for Overall site management and planning including Site execution and documentation. Supervised Geotechnical Drilling, Down hole Core Logging, Sampling, labeling and transportation. Developed Geological and Discontinuity Survey Maps  Conduct Rock Permeability Test (lugeon Test); Constant Head Test and Variable Head Test, SPT, CPT and Undisturbed Sampling (UDS Denison, Pitcher, Shellby). Collect Field Data and produce geological engineering reports. Conduct field investigations as per design and standards. Ensured all team members follow the safety regulations religiously and they do not indulge in any potentially harmful activity. Show less

      • 2014 - 2015

       Responsible for Overall site management and planning including Site execution and documentation. Supervised Geotechnical Drilling, Down hole Core Logging, Sampling, labeling and transportation. Developed Geological and Discontinuity Survey Maps  Conduct Rock Permeability Test (lugeon Test); Constant Head Test and Variable Head Test, SPT, CPT and Undisturbed Sampling (UDS Denison, Pitcher, Shellby). Collect Field Data and produce geological engineering reports. Conduct field investigations as per design and standards. Ensured all team members follow the safety regulations religiously and they do not indulge in any potentially harmful activity. Show less

      • 2013 - 2014

       Manage and Supervise Ground Improvement by Consolidation and Curtain Grouting with Both Conventional and GIN Method as well as Site management and planning. Supervised Drill Hole, Down hole Core Logging, Sampling, labeling and safe transportation for laboratory tests. Conduct Rock Permeability Test (lugeon Test), Constant Head Test and Variable Head Test, SPT, CPT and Undisturbed Sampling. Collect Field Data and produce geological engineering reports. Ensured all team members follow the safety regulations religiously and they do not indulge in any potentially harmful activity. Show less

      • Jan 2013 - Nov 2013

       Supervised 300 meters Adit Construction including drilling and blasting, tunnel cycle and scanline discontinuity mapping.  Developed Geological and Discontinuity Survey Maps of Adit and correlate with surface exposure. Supervised Drill Hole, down whole Core Logging, Sampling labeling and safe transportation for laboratory tests as well as Site management and planning. Conduct Rock Permeability Test (lugeon Test), Constant Head Test and Variable Head Test, SPT, CPT and Undisturbed Sampling. Collect Field Data and produce geological engineering reports. Ensured all team members follow the safety regulations religiously and they do not indulge in any potentially harmful activity. Show less

      • Jul 2012 - Jan 2013

       Performed Geotechnical Drilling, Down hole Core Logging, Sampling and Geological Mapping Geotechnical Laboratory and field testing, as well as Site management and planning. Developed Geological and Discontinuity Survey Maps from weir site to powerhouse along Tunnel route Conduct Rock Permeability Test (lugeon Test), Constant Head Test and Variable Head Test, SPT, CPT and Undisturbed Sampling. Collect Field Data and produce geological engineering reports. Conduct field investigations as per design and standards. Ensured all team members follow the safety regulations religiously and they do not indulge in any potentially harmful activity. Show less

Education

  • University of Sargodha
    Applied Geology, Earth Sciences
    2005 - 2011

Community

You need to have a working account to view this content. Click here to join now