Jun (Alan) Xiang
General Manager, China at MaxLite- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
MaxLite
-
United States
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
General Manager, China
-
Oct 2019 - Present
-
-
Engineering Manager / Sustaining, Photometric Lab Manager (NVLAP)
-
Jan 2017 - Sep 2019
US Engineering/Sustaining management US Photometric Lab management (NVLAP)Global Engineering team management / Lab management
-
-
Sr. Design Engineer / Photometric Testing Laboratory Manager (NVLAP)
-
Jun 2014 - Jan 2017
• Built photometric testing lab and received NVLAP accreditation in 6 months• Managed daily operation of Photometric Testing Lab.• Provided new product design direction and lead R & D team to design low cost, low maintenance, high energy-efficient lighting products.• Provided new product evaluation, validation and ensure all designs meet safety, quality and performance requirements• Approved, reviewed and verified designs for explosion proof application• Provided Lab technicians training• Provided tech support and product trouble shooting.
-
-
-
-
Engineering Manager / Photometric Testing Laboratory Manager (NVLAP)
-
Jan 2013 - Jun 2014
• Built photometric testing lab and received NVLAP accreditation in 10 months• Managed daily operation of Engineering Dept and Photometric Testing Lab.• Provided new product design direction and lead R & D team to design low cost, low maintenance, high energy-efficient lighting products.• Provided new product evaluation, validation and ensure all designs meet safety, quality and performance requirements• Approved, reviewed and verified designs for food and drug application • Developed safety and performance testing procedures for lighting lab • Provided Lab technicians training• Provided tech support and product trouble shooting.
-
-
-
RAB Lighting
-
United States
-
Appliances, Electrical, and Electronics Manufacturing
-
100 - 200 Employee
-
Quality Assurance Manager
-
Mar 2011 - Dec 2012
• Managed daily operation of incoming QC, in process QC and returns Dept.• Managed global QC team and cross-trained design engineers and QC inspectors. • Established measurement and feedback system to validate product improvements.• Ensured manufactured product compliance to Quality Standard Operating Procedures (QSOPs) and UL standard.• Managed and developed new product inspection procedure. • Oversee multi-location product improvement teams• Conducted training program in Quality, return and manufacturing personnel• Established and maintained effective working relationships with the Manufacturing and Engineering department.• Lead the quality effort on all new products during development, market introduction and, warranty performance. • Managed initiatives aimed at driving supplier quality, delivery, and cost to maximize customer satisfaction. • Implemented standard work for cellular manufacturing • Worked with manufacturing to implement error proofing strategies • Provided support and consultancy to Sales & Marketing teams on technical & QC issues.
-
-
Senior Mechanical Engineer
-
Apr 2005 - Mar 2011
• Responsible for management of HID, LED, solar LED product design and development, certification laboratory and product inspection for new development programs.• Approve review and verify developments of new products.• Lead the development of LED, LED heat sink, Solar LED module and LED drivers.• Performed technical evaluation of new products and ideas, and advises changes and modifications needed to meet safety, quality and production requirements.• Managed China engineering team.• Coordinate China and Taiwan suppliers to ensure the products meet design criteria. • Tested & evaluated various LEDs, drivers, solar panels, controllers for best LED solution.• Designed lighting products from concept to production • Detailed part drawings, assembly drawings, tooling drawings and BOM creation.• Created instruction sheets, catalog and data sheets.• Performed quality control to meet UL/ cUL requirements such as mechanical, electrical, optical and environmental requirements.• Performed lighting calculations and lighting layouts.• Performed structure and thermal analysis of new products and ensure all designs meet mechanical, thermal, and safety requirements.
-
-
-
Nedco Conveyor Technology Company
-
Machinery Manufacturing
-
1 - 100 Employee
-
Mechanical Design Engineer
-
May 2003 - Mar 2005
• Finished projects from concept to full production.• Designed and detailed table top, belt, rotary table, spiral conveyor and bucket elevator.• Performed 2D and 3D modeling of conveyor.• Implemented computer FEA simulations of conveyor systems• Provided manufacturing support and product trouble shooting. • Finished projects from concept to full production.• Designed and detailed table top, belt, rotary table, spiral conveyor and bucket elevator.• Performed 2D and 3D modeling of conveyor.• Implemented computer FEA simulations of conveyor systems• Provided manufacturing support and product trouble shooting.
-
-
Education
-
University of South Carolina