Julian Salgar

Contract Administrator at Maincom Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Sydney, New South Wales, Australia, AU
Languages
  • Spanish Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Contract Administrator
      • Sep 2022 - Present

      ▪ Building and updating construction programs including documentation and contracts. ▪ Manage risk and ensure compliance with construction contract law requirements. ▪ Prepare Subcontractor Packages, work order, progress claims and external variations. ▪ Manage adjudication claims under the Building and Construction Industry Security of Payment Act. ▪ Manage sub-contractors' WHS compliance documentation. ▪ Prepare and evaluate quote estimates. ▪ Liaise with trades and insurance companies to track progress of ongoing claims/projects. ▪ Issue EOT and delay notices. ▪ Manage sub-contractors' contracts for defect liability works. ▪ Maintaining contact with our clients and stakeholders. ▪ Reporting to the Construction Manager for scheduling, programming, and cost reports.

    • Civil Engineer
      • Jun 2018 - Sep 2022

      ▪ Designing hydraulic systems for residential projects, including water supply, stormwater recycling, and wastewater treatment and disposal. ▪ Preparing and reviewing cost estimates resulting on cost reduction by 8% after implementing alternative solutions▪ Estimating the total cost of the construction projects, using the architectural and engineering layouts and working closely with stakeholders: Architects, Structural Engineer, Sub-contractors and material suppliers.

    • Project Engineer
      • Jul 2017 - Jun 2018

      ▪ Led the implementation of environmental initiatives: rainwater harvesting and wastewater treatment systems, reducing water consumption by 60% and the disposal of wastewater to sewage system by 90%.▪ Supervised a team of 10+ people, focusing on performance, meeting timeframes and achieving deliverables. ▪ Defined and reported on project timelines assessing the requirements of materials, equipment and labour. ▪ Managed performance of up to 15 subcontractors and managed supplier quotes and invoicing.

    • Construction Supervisor
      • Mar 2021 - May 2021

      ▪ Calculated quantities of material and general equipment requirements from architectural and engineering layouts. ▪ Followed up project planning ensuring timeframes, actions, deliverables and overall performance were met. ▪ Managed contractors and material suppliers. ▪ Calculated quantities of material and general equipment requirements from architectural and engineering layouts. ▪ Followed up project planning ensuring timeframes, actions, deliverables and overall performance were met. ▪ Managed contractors and material suppliers.

    • Structural Site Engineer
      • Oct 2015 - Jul 2017

      ▪ Supervised daily construction activities for two high-rise buildings (26 and 42-stories), including steel reinforcement and correct concrete pouring according to the design specifications and standards. ▪ Improved assembly and pouring timelines of vertical elements and concrete slabs by 19%. ▪ Developed a tool that tracks concrete traceability by the daily collection of site data. ▪ Performed quality assurance of materials for each of the structural elements of the buildings. ▪ Coordinated weekly committees to provide feedback on the supervised activities to stakeholders.

    • Junior Hydraulic Engineer
      • Nov 2014 - Oct 2015

      ▪ Designed hydraulic systems for commercial and residential building projects, including water supply, stormwater recycling, and wastewater treatment and disposal. ▪ Prepared the construction budget and specifications for the hydraulic designs. ▪ Conducted site inspections during the construction phase of the projects. ▪ Liaised with the structural department of the company and external stakeholders. KEY CONTRIBUTIONS ▪ Improved the efficiency of the design process by co-creating a set of Excel spreadsheets for hydraulic calculations, easily adapting to the conditions of each project and considering norms and local regulations.

Education

  • Australian College of Business Intelligence
    Diploma in Sustainable Operations, Sustainability Studies
    2021 - 2022
  • Australian College of Business Intelligence
    Certificate IV in Environmental Management and Sustainability, Sustainability Studies
    2020 - 2020
  • Lonsdale Institute
    Diploma of Project Management, Project Management
    2019 - 2019
  • Universidad Industrial de Santander
    Bachelor of Engineering - BE, Civil Engineering
    2009 - 2014

Community

You need to have a working account to view this content. Click here to join now