Juan Enrique Perez Ruiz

Shift Manager at FLO (Ferrovial Agroman Laing O'Rourke JV)
  • Claim this Profile
Contact Information
Location
London Area, United Kingdom, UK

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Civil Engineering
    • 1 - 100 Employee
    • Shift Manager
      • Aug 2019 - Present

      From August, I am working like TBM Tunnel manager and secondary lining preparation works in central section of Tideway project. Being responsible for: planning and programming of future works, ensuring that staff and operatives are in possession of the current excavation parameters instruction and are working in accordance with this, developing RAMS / Shift Plans and Task Briefings and ensuring that works are being carried out correctly and in accordance with them and providing instruction and support to TBM Shift and Control Room engineers. Show less

    • TBM shift engineer
      • Sep 2018 - Aug 2019

      I was working 1 year as TBM tunnelling shift engineer of two 8.8 meters NFM EPB TBMs in Tideway project. My main duties were: Ensuring works are undertaken in accordance with existing RAMS and excavation is carried out in accordance with the current operational instruction sheet, controlling the supply sequence of rings to the TBM to enable correct ring building, selecting and recording the orientation of the rings built to follow the TBM alignment, recording the critical path activities of the shift on the TBM data base and Face logging and recording of tools changed during interventions. I gained an understanding of using PPS tunnel guidance software and TPC TBM monitoring system. Show less

    • Tunnel Shift Engineer
      • Jun 2018 - Sep 2018

      I was working like shift engineer building 4 new cross passages in Kennington tube station at the same time that this station kept opened. My main tasks were: guidance and leading of the construction methodologies and measures, guidance and leading of the excavations, building rings and construction of concrete collars. Solving surveying issues, carrying on with quality tasks, redacting technical daily reports and recording as built reports using knowledge of Leica TS-15, TS-50 and Amberg software. Show less

    • SCL shift engineer
      • May 2018 - Jun 2018

      I was working 2 months as SCL shift engineer building two overrun tunnels Battersea Power station in NLE project. Some of the main duties were: undertaking all works in accordance with the specific ITP, ensuring that the works are built to the correct standards, maintaining profile control for excavation and spraying, ensuring works on site are carried out safely with due regard to the protection of the workforce, public and the environment, including managing exclusion zones and recording as built information using survey equipment (TS-15, TS-50 and Amberg software). Show less

    • Tunnel Shift Engineer
      • Feb 2018 - May 2018

      I worked like shift engineer building 3 cross passages connecting both main tunnels built before in the Northern line extension project. My main tasks were: guidance and leading of the construction methodologies and measures, guidance and leading of the excavations, building rings and construction of concrete collars. Solving surveying issues, carrying on with quality tasks, redacting technical daily reports and recording as built reports using knowledge of Leica TS-15, TS-50 and Amberg software. Show less

    • TBM Control Room Engineer
      • Sep 2017 - Dec 2017

      I was working 4 months as control room engineer of two 6 meters NFM EPB TBMs. My main duties were: providing checks and balances that the TBM is being controlled to the parameters set out in the Plan for TBM Advance and if not asking that the parameters should be followed, providing the initial surface point of contact in an emergency in the tunnel, the collection of data and the reporting of that TBM and associated plant data, providing accurate and timely responses to project management and attending regular meetings (SRG, CTC). Show less