Juan Torrella

at Empresarios Agrupados
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Madrid, Community of Madrid, Spain, ES

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Engineering Services
    • 400 - 500 Employee
      • Feb 2022 - Present

      Development of the following activities within the scope of the project for the design, manufacturing and supply of the I&C cubicles for signal conditioning (SCC) belonging to the Tokamak Cooling Water System (TCWS) in the experimental fusion reactor ITER:- Elaboration of the Quality Plan (QP) for the project.- Elaboration of the Configuration Management Plan (CMP) for the project.- Elaboration of the Failure Mode and Effects Analyses (FMEA) for the SCC.- Coordination with the Design&Manufacturing Area.- Design of a Qualification strategy for the SCC.- Elaboration of the Qualification Plan and the Qualification Programme for the SCC.- Elaboration of the Qualification Procedures for the SCC.- Management of laboratories for the testing activities in the qualification of the SCC.- Management and monitoring of all qualification activities.- Elaboration of the Qualification Reports.- Monitoring of the manufacturing activities.- Monitoring of the Factory Acceptance Tests (FAT). Show less

      • Oct 2021 - Present

      Development of the I&C conceptual design for a First-of-a-Kind Small Modular Reactor (SMR) of the Molten Salt Reactor (MSR) type.

      • Sep 2020 - Mar 2022

      Development of the design documentation for the control rooms (MCR, ECR, and ERCP) for Hanhikivi 1 Nuclear Power Plant in Finland. Elaboration of a Quality Plan, a Qualification Plan, Layout and Ergonomic System Requirement Specifications and Description and Layout Solutions design documents for all three control rooms. Permanent contact with customer and General Designer (Atomproekt), Plant Supplier (Rosatom Overseas), Owner (Fennovoima) and Engineering Partner (Fortum).

      • Sep 2020 - Feb 2022

      Development of 5 I&C chapters in the Preliminary Safety Analysis Report (PSAR) for Hanhikvi-1 (FH1) Nuclear Power Plant (Finland) within the licensing activities required by STUK, Finland's Nuclear regulator in coordination with the client (Fennovoima), the general designer (Atomproekt) and the I&C designer (RASU).

      • Apr 2019 - Sep 2020

      Project Engineer in the I&C team in Empresarios Agrupados' TRIAL project that provides engineering support to CNAT, the Almaraz NPP and Trillo NPP Owner's Engineering, participating in all I&C-related design modifications, programmed or not, in both plants.

    • Spain
    • Industrial Machinery Manufacturing
    • 500 - 600 Employee
      • Oct 2016 - Apr 2019

      Design of the hardwired Transfer Panels and Emergency Control Room (ECR) hardwired panels for Krsko Nuclear Power Plant (Slovenia). including component selection and supply, monitoring of the manufacturing activities and design & execution of Factory Acceptance Tests. Permanent contact with engineering partner (IDOM), panel manufacturer (CYMI), plant engineering (SIPRO) and customer (NEK).

      • Oct 2014 - Oct 2016

      Design of the Main Control Room (MCR) hardwired operation panels for YangJiang 5&6 NPP (China), including component selection and supply as well as monitoring of the manufacturing activities. Permanent contact both with manufacturer and DCS engineering (CTEC-CGNPC).

      • Jan 2012 - Oct 2014

      Analisys and design of the video display Human-System Interfaces for plant systems in the Main Control Room (MCR) in new Nuclear Power Plants (NPP) FQ1&2, FJS1&2, CJ1&2, FQ3&4 in China based on HFE methodology and NRC regulations and guides. Permanent contact both with customer (CNPE) and DCS supplier (Invensys/Scheneider Electric).

    • Ireland
    • Business Consulting and Services
    • 700 & Above Employee
    • Consultant. Functional Design in CRM Projects for Telefónica in Spain
      • Jan 2010 - Jan 2012

      Analysis and functional design in CRM projects based on Siebel (ORACLE) technology for major telecom company Telefónica Analysis and functional design in CRM projects based on Siebel (ORACLE) technology for major telecom company Telefónica

    • Spain
    • Higher Education
    • 700 & Above Employee
    • Full-time R&D Engineer in Spain
      • Oct 2009 - Dec 2009

      Experimental study of low-temperature behaviour of two substitutive drop-in refrigerant fluids versus R22 refrigerant fluid in the same two stage compression refrigeration cycle. Experimental study of low-temperature behaviour of two substitutive drop-in refrigerant fluids versus R22 refrigerant fluid in the same two stage compression refrigeration cycle.

    • Spain
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Intern. Energy Technology Engineer
      • Nov 2008 - May 2009

      Development of the Mechanical Engineering Master Thesis: “Implementation of a new Control System for the Main Stop Valves and Main Control Valves in the Steam Regulation System of 1000 MW Nuclear Power Plant”. – I&C Department, Cofrentes NPP, Valencia (Spain) Development of the Mechanical Engineering Master Thesis: “Implementation of a new Control System for the Main Stop Valves and Main Control Valves in the Steam Regulation System of 1000 MW Nuclear Power Plant”. – I&C Department, Cofrentes NPP, Valencia (Spain)

Education

  • Universidad Politécnica de Valencia
    M.Sc in Mechanical Engineering, Ingeniería Industrial - Especialidad en Técnicas Energéticas
    2003 - 2008
  • Kungliga tekniska högskolan
    Full Term Erasmus Programme, Mechanical Engineering - Energy Technology
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now