Juan Pablo Capellino

Commercial Manager at Renovar Energías
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Argentina, AR
Languages
  • English Professional working proficiency
  • Portuguese Limited working proficiency
  • Spanish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Juan Pablo Capellino a gerenciado con éxito múltiples equipos de trabajo, implementado con éxito proyectos de distinta envergadura y a su vez manejado actividades y problemas de la operación diaria. Posee un excelente criterio profesional y sentido común que le ha permitido siempre resolver con éxito , cualquier inconveniente en tiempo, forma y costo estipulados.

Osvaldo Pumar

Juan Pablo es un profesional de una formación técnica muy sólida y una capacidad de liderazgo muy importante. Su capacidad de trabajo y planificación han redundado en puestas en marcha exitosas. Es un profesional que se destaca por su gran autonomía. En lo personal, es una persona sincera, sin vueltas y con voluntad de cooperar con sus pares. Es destacable su dedicación y compromiso a fin de llevar adelante los proyectos.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Argentina
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Commercial Manager
      • Apr 2022 - Present

      Development of commercial policies and client portfolio. Technical - Economic evaluation of projects in municipalities, consortiums, SMEs and residential costumers. Project, pre-commissioning, commissioning and startup. Development of commercial policies and client portfolio. Technical - Economic evaluation of projects in municipalities, consortiums, SMEs and residential costumers. Project, pre-commissioning, commissioning and startup.

    • Controller Cooldown LNG
      • Jun 2022 - Jul 2022

      Procedure and execution of the cooling-down of the loading line to the ship (5,5 kilometers) and the LNG tank in the PORTOVAYA Viborg RUSSIA project. Ethylene TK cooling-down procedure. Review and suggestions of liquefaction process and removal of NGL's. Procedure and execution of the cooling-down of the loading line to the ship (5,5 kilometers) and the LNG tank in the PORTOVAYA Viborg RUSSIA project. Ethylene TK cooling-down procedure. Review and suggestions of liquefaction process and removal of NGL's.

    • Argentina
    • Oil and Gas
    • 1 - 100 Employee
    • LNG Business Development Manager
      • Oct 2019 - May 2022

      Evaluation of the best LNG-based energy solutions for the industrial market with autonomous sources of provision. Contract management for LNG export. Management, evaluation and development of unconnected gas wells. Vaca Muerta NQN. In all the projects I participated in the direction, pre-commissioning, commissioning and start-up. Evaluation of the best LNG-based energy solutions for the industrial market with autonomous sources of provision. Contract management for LNG export. Management, evaluation and development of unconnected gas wells. Vaca Muerta NQN. In all the projects I participated in the direction, pre-commissioning, commissioning and start-up.

    • Argentina
    • Construction
    • 1 - 100 Employee
    • Mechanical Supervisor
      • Jan 2019 - Oct 2019

      Precommissioning and commissioning of BOP mechanical equipment and auxiliary services. Two gas turbo generators of 280 MW each, supplied by gas/diesel dual fuel, and a turbo steam group, which takes advantage of the heat of the residual gases of the previous two, completing a total power of 837 MW. Precommissioning and commissioning of BOP mechanical equipment and auxiliary services. Two gas turbo generators of 280 MW each, supplied by gas/diesel dual fuel, and a turbo steam group, which takes advantage of the heat of the residual gases of the previous two, completing a total power of 837 MW.

    • Spain
    • Electric Power Generation
    • 700 & Above Employee
    • Energetic Solutions Manager ARGENTINA
      • Apr 2014 - Jan 2019

      Definition, control and evaluation of commercial policies for the development of customized solutions offered to the industrial market. Commercial management and application of techniques for closing agreements and contracts with industrial clients. PM (Project manager) Technical, economic and financial evaluation of investment projects. Subsequent execution (pre-feasibility, basic, detail, pre-commissioned, commissioned and start-up). Definition of work schedules. Hiring of suppliers and purchases of equipment and supplies. Creation and monitoring of strategic plan-budget-annual objectives. Training of personnel in charge. Industrial safety and environmental management. Achievements: In almost 5 years of management, increase the annual profit almost 30 times; I fulfilled 100% and some years above, the annual evaluation of objectives set for the sector in charge. I closed more than 150 contracts between services and projects, with companies of medium and large scale. Position reporting to LATAM Energy Solutions Director. Show less

    • Oil and Gas
    • 700 & Above Employee
    • LNG Plant Manager
      • Nov 2010 - Apr 2014

      Management and control of the entire operation of the PEAK-SHAVING Plant (Liquefaction, Storage and Vaporization of METANO gas). Interconnected to the residential distribution system (Supply reserve lung). Dimension of the plant 100 ha.Management of own and contracted personnel (40 people)Achievements: 98% effectiveness achieved in the availability rate for entry into operation when the demand of the gas system required it. Reduction of 25% of unproductive costs and expenses.First LNG Plant in Latin America. Show less

    • LNG Plant Maintenance Chief
      • Feb 2001 - Nov 2010

      Management, planning, execution and control of all maintenance. Experience in 5S, RCM, TPM and PDCA. Knowledge in GMP and autoCAD.Technical regulations NFPA59A , ISO 14000 & 14001.Purchases of supplies and domestic and imported parts. SAP / MAXIMO MRO. Continuous improvement Energy efficiency.Preparation, monitoring and budget control. Industrial Security. Environmental managementAchievements: Optimization of stock without rotation in warehouses, saving almost U $ S 1M. Efficient purchasing and contracting, managing to reduce 25% in constant currency, of each annual budget.Extension of average rate between failures in essential equipment of the process, achieving 90% availability rate. Show less

    • LNG Plant Maintenance Operator
      • Apr 1995 - Feb 2001

      Precommissioning and initial start-up. P & IDDrafting of operating manuals (equipment / processes)Process operation and plant maintenance. Knowledge in Hysys.DCS Honeywell and ABB. Environmental management. Industrial Security

    • Argentina
    • Maritime Transportation
    • 1 - 100 Employee
    • 3rd Machinery Officer
      • Mar 1994 - Nov 1994

      Naval propulsion plant, 10,800 BHP ; attention, supervision and maintenance and all auxiliary services too. Cogeneration Plant of 3 Mega power. Naval propulsion plant, 10,800 BHP ; attention, supervision and maintenance and all auxiliary services too. Cogeneration Plant of 3 Mega power.

Education

  • Centro de e-Learning UTN FRBA
    Posgrado en Gestión de Proyectos
    2019 - 2019
  • EDDE
    Master of Business Administration - MBA, General Finances
    2006 - 2007
  • Universidad de la Marina Mercante
    Industrial Maintenance Engineer, Process Plants
    1998 - 2000
  • Escuela Nacional de Naútica
    Engineer Stow Reg III-2, Merchant Navy
    1990 - 1994

Community

You need to have a working account to view this content. Click here to join now