Juan Mario Mokoko

Field Services Engineer at Speedcast
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Malabo, Equatorial Guinea, GQ
Languages
  • English -
  • Spanish -
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Tarjeta de Madurez
    Get acces to Universities in Equatorial Guinea

Experience

    • United States
    • Telecommunications
    • 700 & Above Employee
    • Field Services Engineer
      • Jan 2017 - Present

      Speedcast is the world’s most trusted provider of highly reliable, fully managed, end-to-end remote communication and IT solutions. With differentiated technology, an intense customer focus and a strong safety culture, Speedcast serves more than 2,000 customers in over 140 countries via 39 teleports, including offshore rigs and cruise ships, 10,000+ maritime vessels and 4,500+ terrestrial sites. Speedcast supports mission-critical applications in industries such as maritime, oil and gas, enterprise, media, cruise and government. Learn more at www.speedcast.comAs a Field Service Engineer: - Cover the deployment, monitoring and maintenance of VSAT, Marine Telecommunications including but not limited fixed and stabilized VSAT systems, routers, switches, access points, radios and more- Deal with all types of faults on equipment providing global connectivity services.- Assist less senior staff with installation, commission, troubleshooting and maintenance of equipment.- Carry out on-the-job training as part of supervision of less senior staff who have been allocated to assist.- Install and commissioning VSAT terminals or marine telecoms equipment, per job requirement- Maintain and troubleshoot connectivity infrastructure and associate equipment's when directed.- Install and test telephones and data lines for existing VSAT services- Carry out surveys for installation equipment's- Marketing of company’s products and services

    • United States
    • Telecommunications
    • 200 - 300 Employee
    • Field Technician
      • Jul 2016 - Jan 2017

      Harris Corporation is a world leading technology innovator, solving customers’ toughest mission-critical challenges by providing solutions that connect, inform and protect. Harris supports customers in about 100 countries and has approximately $6 billion in annual revenue. The company is organized into three business segments: Communication Systems, Electronic Systems and Space and Intelligence Systems. Learn more at harris.com.• Deployment of communication equipment at client site including but not limited to fixed and stabilized VSAT systems, routers, switches, access points, radios and more• Field intervention at client site• Remote support of client using dedicated out of band management (OBM) systems as well as in band systems• Execution of projects• Interfacing between clients and our organisation• Marketing of company’s products and services

    • Electrical Engineer
      • Sep 2015 - Jul 2016

       Supervise all electrical work in the hydro-electrical power plant of Djibloho and its new undergoing project of Regulating reservoir. Make sure that all electrical work is done according to national and international standards. Make sure that all work is done following health, safety and environment (HSE) and report any HSE condition. Write the monthly reports of the activities carried in the job site. Lead the electrical team in any activities within the company. Ensure all paperwork, projects are processed and completed on a timely basis in the order of established priorities.

    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineering Intern
      • Jan 2014 - Aug 2014

      -Determine the protective coordination settings for the Equatorial Guinea LNG Train 1, 1EDP-0F121 Panel board in Marine.-Prepare coordination time-current characteristic curves to determine the required settings/sizes of the protective devices to maximize selectivity -Determine the protective coordination settings for the Equatorial Guinea LNG Train 1, 1EDP-0F121 Panel board in Marine.-Prepare coordination time-current characteristic curves to determine the required settings/sizes of the protective devices to maximize selectivity

    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineering Intern
      • Jan 2013 - May 2013

      -Working on Motor protection Schedule-Load study on a panel located in the jetty construction.-HES safety trainings for the period- Attended monthly meetings base on HES evaluations and Engineering performance. -Working on Motor protection Schedule-Load study on a panel located in the jetty construction.-HES safety trainings for the period- Attended monthly meetings base on HES evaluations and Engineering performance.

    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineering Intern
      • Jan 2012 - May 2012

      - Load study on IT Telecom Room of EG LNG Business Center I was in charge of calculating the total load consumption of the equipment connected in the area. - Load study on IT Telecom Room of EG LNG Business Center I was in charge of calculating the total load consumption of the equipment connected in the area.

Education

  • Universiti Teknologi Petronas
    Bachelor's degree, Electrical and Electronic Engineering
    2009 - 2015
  • Dr Rafael Maria Nze Abuy
    Tarjeta de Madurez
    2001 - 2008

Community

You need to have a working account to view this content. Click here to join now