Juan José Fernández Toral BSc MSc CEng MICE
Construction Manager at Campos - Chile- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español Native or bilingual proficiency
-
Inglés Full professional proficiency
Topline Score
Bio
Credentials
-
Chartered Engineer (CEng)
Engineering CouncilAug, 2014- Nov, 2024 -
Member, MICE
Institution of Civil EngineersAug, 2014- Nov, 2024
Experience
-
Campos - Chile
-
Chile
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Construction Manager
-
Apr 2014 - Present
- WAREHOUSE INDUSTRIAL PARKS Coordination of the design and construction of industrial warehouses, prefabricated concrete pillars and metallic structure roofs manufactured on site, earthworks, urbanization and offices with all their specialties in finishes and installations such as: plumbing, sanitary, electrical, air conditioning, protection against Fire, Security and Control Systems; from the Processing of Initial Permits to the Achievement of the Final Reception with the different administrative entities. A total of 13 Industrial Parks, in which the following stand out: – Avanza Park San Bernardo 1. 4 Modules and 1 module for Flammables. Total area: 190,000m2. Other Clients: SOCOFAR, Chilexpress, Flex, Wurth. – Park Miraflores advances. 175 Modules. Total area: 50,760m2. - DISTRIBUTION CENTERS TO THIRD PARTIES – Distribution Center Plant Santiago de Chile. PROCTER & GAMBLE. Demolition of 15,258 m2 of existing buildings (reinforced concrete and metal structure), highlighting slabs, walls, partitions and radiers; Coordination of the design and construction of a warehouse (14,177 m2). Shoulder height 12.10m, Free height max. 14.60m. 80x80cm prefabricated concrete pillars, 24m span metal frame trusses and promenades, with 484.02m2 of Offices and Changing Rooms with all the Finishing and Installation Specialties. The manufacture of the metal structure on site coexisting with demolition and construction, optimizing space and execution time. – LOGINSA Warehouse Distribution Center. Coordination of the design and construction of a warehouse (27,985.45m2), shoulder height 10.15m, max clearance height 11.30m. 60x60cm prefabricated concrete pillars, 30m trusses and 15.85m span sides, both with metal structures manufactured on site. And a three-story building with all the Finishing and Installation Specialties. (2,445.10m2). Total project area 42,259.62m2. Show less
-
-
-
URSSA S. Coop
-
Spain
-
Construction
-
1 - 100 Employee
-
Construction Manager on Site
-
Nov 2012 - Apr 2014
Participation in the "Energy from Waste Facility Project" in Ardley (UK), being subcontracted by the companies CNIM (France) and Glugston (England). Coordination of the design, Manufacture and Construction of the metallic structure to support the boilers of a 2,500Tm waste plant, with the capacity to generate 24MW of renewable energy for the National Grid of England Participation in the "Energy from Waste Facility Project" in Ardley (UK), being subcontracted by the companies CNIM (France) and Glugston (England). Coordination of the design, Manufacture and Construction of the metallic structure to support the boilers of a 2,500Tm waste plant, with the capacity to generate 24MW of renewable energy for the National Grid of England
-
-
-
Coastal Partners
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Civil Engineer
-
Mar 2012 - Nov 2012
Association formed by four municipalities, which leads the coastal problems along 162 km of the coast of Hampshire (UK). - Coordination of the design and Supervisor of projects to reduce the risk of coastal flooding and erosion, by promoting the provision of sustainable coastal protection and defense measures, from the technical, environmental and economic point of view of the following municipalities: – Havant Borough Council, Portsmouth City Council, Gosport Borough Council and Fareham Borough Council. Show less
-
-
-
Dragados SA
-
Spain
-
Construction
-
700 & Above Employee
-
Construction Manager on Site
-
Mar 2007 - Jan 2011
Special Building Projects at the Adolfo Suárez Madrid-Barajas Airport. (Property: AENA, Public State Administration) of the following typologies: - Demolition, recycling, rehabilitation and fit-out of Terminals T1, T2 and T4 of the Airport, combining high standing Finishing Specialties and special and complex Installations, usual for this type of building, and with the exceptional condition of coexistence between the execution of the project and the continuity of 24/7 operation of passenger traffic, requiring special planning and organization of all the activities to be carried out, in an assertive and thorough manner. - Demolition of a parking lot with 4 surface floors of reinforced concrete, highlighting slabs, walls, radiers and partitions. Construction of a parking lot with 4 surface floors of reinforced concrete with all the Specialties of Finishes and Installations. Show less
-
-
-
Ploder S.A. (Top Ten Spanish Company for Construction)
-
Madrid y alrededores, España
-
Site Manager
-
Aug 2005 - Mar 2007
Construction of the Irrigation Improvement and Modernization Project in the Páramo ALTO Canal Irrigation Community, SECTOR VII, León. Property: SEIASA NORTE, S.A. Construction of the Irrigation Improvement and Modernization Project in the Páramo ALTO Canal Irrigation Community, SECTOR VII, León. Property: SEIASA NORTE, S.A.
-
-
Education
-
Universidad Politécnica de Madrid
Ingeniero Técnico de Obras Públicas -
Universidad Europea
Ingeniero de Caminos Canales y Puertos -
Universidad de Chile
Constructor Civil