Juan Carlos Carvajal Lara

Principal Life of Mine Planning Copper at Minera Anglo American Chile Limitada
  • Claim this Profile
Contact Information
Location
Chile, CL
Languages
  • English -
  • Spanish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Principal Life of Mine Planning Copper
      • Oct 2017 - Present

    • Chile
    • IT Services and IT Consulting
    • 100 - 200 Employee
    • Senior Mine Planning Engineer (Long term planning)
      • Jul 2013 - Oct 2017

      - He was accountable of the 2014 and 2015 Planning Cycle (LoA15, LoA16), He participated in the mine plans development and economical evaluation for the Base and Potential Cases, also He has been led “Los Colorados Extension Project” in its development stages, during this project He has had great interaction with the operational and process areas to define the inputs and to review the progress of the project. In order to obtain the approval of the project, He had to present the mining charter to the owners.- Also in some occasions He has been assigned as Interim Superintendent to take all the area accountabilities.

    • Senior Mine Planning Engineer / Competent Person Ore Reserves
      • Mar 2011 - Jun 2013

      - He was accountable of the 2011 Planning Cycle (RDP13, LoA13, 5YP13 and special projects); he was working with his work team in the economic sequence optimization Blasor / Whittle, pushback-design, schedule in Mine Plans tools, equipment hours, acquisition and replacement equipment mine, etc. - He was nominated to prepare report and sign off as Competent Person on Ore Reserves Statement for Cerro Colorado and Spence Mine (2012 and 2013). In order to obtain the Reserve Statement Approval, He had to present the Base Case mine plan to the BHPBilliton executive committee.- He helped to the Human Resources to interview mine engineers to recruit him for the team work of long term planning.- During this period in several occasions He was working as interim manager to take all the area accountabilities.

    • Mine Planning Engineer (Medium and long term planning)
      • Apr 2009 - Feb 2011

      - With Mine Engineer under his responsibility, he led and developed the LoA11 Mine Plan; the project was called "Economic sequence and push-back size definition LoA2011". This study reviewed different options of push-back size and were developed mining plans for each case and then the best case was selected in terms of NPV. This study increased the company NPV value in 1.5%. The EXCO selected this study as the best project of the cycle 2011.- He led and was accountable for the publication of the FY2010 forecast, which developed the sequence of the mining plan for the Escondida Mine and Escondida Norte, developed production plans of the Concentrator Plant, Sulphide and Oxide leaching, estimated equipment requirements, etc.

    • Mine Planning Engineer (Long term planning)
      • Aug 2007 - Apr 2009

      - He developed strategic planning processes to define size and production rate of a potential expansion of existing operations that have OD, by exploiting a massive open pit operation. He participated in the development of long term mine planning to meet standards for approval of BHP Billiton in the stage of selection.- In addition, he participated in the MSSP implementation software in the improving of the MSSP tool to define policies for variable cut-off grade through a module called Automaping.

    • Mine Planning Engineer (Long term planning)
      • Feb 2005 - Aug 2007

      - He participated in planning cycles and LOA-2007-2008 by carrying out optimization of mineral resources and mine design.- He participated in the development and implementation of tools to support mine planning with NCL Engineering Company (Dave Carkeet) at Escondida. - He participated in planning cycles and LOA-2007-2008 by carrying out optimization of mineral resources and mine design.- He participated in the development and implementation of tools to support mine planning with NCL Engineering Company (Dave Carkeet) at Escondida.

    • Chile
    • Higher Education
    • 700 & Above Employee
    • Part Time Professor
      • Mar 2003 - Dec 2003

      - Part Time Professor at the University of Antofagasta teaching the subjects of "Mining Environmental Control" - Part Time Professor at the University of Antofagasta teaching the subjects of "Mining Environmental Control"

    • Mine Planning Engineer
      • Dec 2000 - Dec 2002

      - He was responsible for the benefices report of Six Sigma projects in the area of operational excellence and trained some engineers in the management of development tools SIX-SIGMA.- He participated in the Six Sigma projects called "Definition the most critical components which impact on the operation and repair costs at the Oxide Plant and Concentration Plant." - He was working in the development of the project "Implementation of light hopper at Escondida Mine" to obtain his professional degree in the Antofagasta University.

Education

  • Universidad de Chile
    Diploma in Management Control
    2017 - 2017
  • Universidad de Antofagasta
    Licenciado en ciencias de la ingeniería, Ingeniero Civil Industrial Minas
    1993 - 1999

Community

You need to have a working account to view this content. Click here to join now