Jack Pockley

Quantity Surveyor at BLENHEIM HOUSE CONSTRUCTION LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Northcote, Victoria, Australia, AU
Languages
  • English Native or bilingual proficiency
  • Spanish Elementary proficiency
  • Portuguese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Quantity Surveyor
      • Oct 2020 - Present

      Client: Maurice Investments Value: Circa £17,500,000 Contract: Design & Build Employer’s Agent: Pinacle Projects Architect: GPAD London Quantity Surveyor: Exigere Structural Engineer: Eckersley O'Callaghan M&E Consultant: Rushmoor Brand New Office Development in the Heart of Angel, Islington 10-14 White Lion Street will provide brand new contemporary and creative office space, with completion set for December 2021. The development will provide a total 51,333 sq ft across the lower ground and six upper floors, including south facing private terraces, showers and cycle spaces. The building design limits any negative environment impacts and also caters for the needs of modern occupiers.

    • Quantity Surveyor
      • Jun 2018 - Oct 2019

      Client: LBS PropertiesValue: £11,125,000Contract: Design & BuildEmployer’s Agent: Quantem Consulting LLPArchitect: VeretecQuantity Surveyor: Quantem Consulting LLPStructural Engineer: Heyne Tillett SteelM&E Consultant: Hoare Lee65 to 70 White Lion Street is a new commercial development for our Client LBS Properties, backing onto the vibrant Chapel Market. The building consists of six office floors arranged over lower ground to 4th floor in a stepped formation sympathetic to the surrounding existing residential and retail buildings. BHC were engaged to help with a cost plan to ascertain the viability of the approved planning scheme, which enabled the Client to formulate a successful bid for the site. The final contract build cost was reached with an open book negotiation with the Client and his professional team.BHC worked with the design team to help influence the buildability and material cost as the design progressed from the original planning scheme to a new ‘urban commercial’ scheme with fair face concrete prevailing as a feature to clean uncluttered soffits and walls. The heating and cooling was switched to an underfloor methodology and plant moved to a roof top plant room with an acoustic scheme maintaining rights of light and removing a double storey basement plant room.The front elevation is of dark brick and large glazed elements of curtain walling with bronze feature panels. The rear elevations have terraces with feature screening preventing overlooking of neighbouring properties. A mixture of rendered panels and zinc cladding frame the large windows which are openable to allow tenants the option of natural ventilation.

    • Assistant Quantity Surveyor
      • Mar 2017 - Jun 2018

      Client: Soho Estates LtdValue: £21,500,000Contract: TraditionalProject Manager: DML Development Managers LtdArchitect: SODA ArchitectureQuantity Surveyor: GleedsStructural Engineer: Tier ConsultM&E Consultant: Thornton ReynoldsBHC were involved with this unique project from a very early stage, to aid the Clients’ team in logistics, programming and buildability, on one of the most complex projects we have ever undertaken. The site is situated in the heart of London’s iconic Soho and incorporates some of the area’s most renowned buildings.The scheme creates a vibrant mix of uses including the revival of the famous Boulevard Theatre, new high-quality shops and restaurants, improved public realm and a new headquarters for Soho Estates. The redevelopment revitalises the buildings and enhances the character of the area. A number of tenants have remained on site throughout the works, including The Box nightclub, Diamond Jacks tattooists and two other retail premises.With a phased project delivery, construction activities comprise some partial and some complete demolition of the buildings that make up Walker’s Court and façade retention prior to new build and refurbishment of buildings

    • Trainee Quantity Surveyor
      • Mar 2016 - Mar 2017

      Client: Private ClientValue: £26,000,000Contract: Management Building ContractProject Manager: Zeropointone LtdArchitect: Reardon SmithQuantity Surveyor: MKMT AssociatesStructural Engineer: Constructure LtdM&E Consultant: Buildings Services Group LtdThis project consists of the extensive refurbishment of a Grade II listed building located next to an extremely busy traffic junction in London’s St James’s, including changes in design and building use.Works comprise removal of the entire roof and top floor of the building and replacement with a remodelled steel frame structure clad with slate finishes, structural enhancement to the three upper floors and conversion to 11 luxurious suites, including a members’ area and roof terrace.Original features including the majestic entrance, hallway, drawing rooms and grand staircase have been retained and sympathetically restored with the ornate stone façade cleaned down as part of the restoration works.The project is complicated by challenges such as restricted access at all times due to the location, including very limited delivery periods.

    • Gangerman
      • Nov 2015 - Mar 2016

      Client: GHL (Strand) LtdValue: £11,300,000Contract: Design and BuildProject Manager: Rider Levett BucknallArchitect: Chetwood ArchitectsQuantity Surveyor: Rider Levett Bucknall Structural Engineer: Glanville ConsultingM&E Consultant: KUTTargeted to achieve BREEAM Very Good Rating

    • Property Manager
      • Nov 2013 - Nov 2014

    • Australia
    • Paper and Forest Product Manufacturing
    • Business Development Manager
      • 2007 - 2012

Education

  • La Trobe University
    Business, Business Economics
    2008 - 2011
  • University College of Estate Management
    Master of Quantity Surveying
    2015 - 2017

Community

You need to have a working account to view this content. Click here to join now