Jostein Nestås
Elektrisk ingeniør senior at Moreld Apply- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Engelsk -
Topline Score
Bio
Experience
-
Moreld Apply
-
Norway
-
Oil and Gas
-
400 - 500 Employee
-
Elektrisk ingeniør senior
-
Apr 2023 - Present
-
-
Senior elektro ingeniør
-
Feb 2022 - Mar 2023
-
-
-
Wood
-
United Kingdom
-
Professional Services
-
700 & Above Employee
-
Elektroingeniør
-
Jan 2021 - Feb 2022
-
-
-
Rosenberg Worley
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Jobb prep elektro OMEGA
-
Sep 2020 - Jan 2021
-
-
-
MDE Group
-
Norway
-
Staffing and Recruiting
-
200 - 300 Employee
-
Job prep
-
Jul 2020 - Sep 2020
DUVA Project, ELEKTRO Jobsetting, Rosenberg Worley
-
-
Jobbsetter
-
Aug 2019 - Jul 2020
Jobbsetting Instrument på NOVA modul og GJØA
-
-
-
Dalane vgs
-
Egersund
-
Teacher
-
Aug 2013 - Aug 2019
Elektro Automasjon VG 2 Underviser i El-energi og Robotarm UR3 Elektro Automasjon VG 2 Underviser i El-energi og Robotarm UR3
-
-
-
NOV
-
United States
-
Oil and Gas
-
700 & Above Employee
-
SR. instructor
-
May 2012 - Sep 2013
Instruktør i fagene :DCI, DCDA(HMI), PLC, ET Stasjon(Mud pit sim) og Sim ET Simulator Instruktør i fagene :DCI, DCDA(HMI), PLC, ET Stasjon(Mud pit sim) og Sim ET Simulator
-
-
-
KeeppelNorway
-
Sandnes
-
Manager Electro
-
Jun 2011 - May 2012
Prosject & Service electrical lead. Advising on- and offshore modifications. Projectlead of electro work at "Rowan Stavanger" at Hinna base. Lead the electro division. Re-org. the work shop. Tender manager. Follow on projects Most rig marked. Prosject & Service electrical lead. Advising on- and offshore modifications. Projectlead of electro work at "Rowan Stavanger" at Hinna base. Lead the electro division. Re-org. the work shop. Tender manager. Follow on projects Most rig marked.
-
-
-
Keppelnorway
-
Keppelnorway Sandnes
-
Senior engineer electro
-
Jan 2011 - Jul 2011
UPS container FAT testing. Document handling. Projectlead of electro work at "Rowan Stavanger" at Hinna base. UPS container FAT testing. Document handling. Projectlead of electro work at "Rowan Stavanger" at Hinna base.
-
-
-
MDE Group
-
Norway
-
Staffing and Recruiting
-
200 - 300 Employee
-
EIT Engineer
-
Aug 2010 - Jan 2011
Projects: Draugen and Ormen Lange, Client: Norwegian Shell Norway Integrated Services Contract. Experience: Work Pack, design, estimation, implementation, as built and clouse out. Scope of professional: New equipment is implemented and the change of old equipment. Familiar with the project and security systems. Draugen: Study: living area Vitus Project: EDS, Crude metring fixed loop and Turn Down 2009 Shell Ormen Lange Engineering Core Team Project: ME mod, VOC, Sothern field template D and TEG mod Role in Project: Engineering, estimation, monitoring electrical, Business Lunches, as-built, hand-over routing in CABSYS and offshore survey. Show less
-
-
-
MDE Group
-
Norway
-
Staffing and Recruiting
-
200 - 300 Employee
-
Engineer electro/Instrument
-
Sep 2009 - Jun 2010
Work as an consultans for AF group Mollier AS Project: HVAC, Client: ConocoPhillips Norway Service Contract on CopNo offshore platforms in the North Sea. Platforms I have worked with during this period: EKO-X, EKO-R, EKO-K, TOR, Fire-A and-B Offshore 2009: two trips. The work has consisted of: Preparation of: Fel reports, work packages for EL & I, etc., MTO, Cable Index, Equipment Index, Data Sheets, Functional - and technical descriptions, estimates electrical / instrument engineering, as built, clouse out, mark up, Follow-up materials / jobs, and doc action. Show less
-
-
-
-
electrical engineer
-
2007 - 2010
Projects: Draugen and Ormen Lange, Client: Norwegian Shell Norway Integrated Services Contract. Experience: Work Pack, design, estimation, implementation, as built and clouse out. Scope of professional: New equipment is implemented and the change of old equipment. Familiar with the project and security systems. Draugen: Study: living area Vitus Project: EDS, Crude metring fixed loop and Turn Down 2009 Shell Ormen Lange Engineering Core Team Project: ME mod, VOC, Sothern field template D and TEG mod Role in Project: Engineering, estimation, monitoring electrical, Business Lunches, as-built, hand-over routing in CABSYS and offshore survey. Show less
-
-
-
-
Electrical Engineer
-
Jun 2007 - Sep 2009
Consult for Aker Elektro AS Projects: Draugen and Ormen Lange, Client: Norwegian Shell Norway Integrated Services Contract. Experience: Work Pack, design, estimation, implementation, as built and clouse out. Scope of professional: New equipment is implemented and the change of old equipment. Familiar with the project and security systems. Draugen: Study: living area Vitus Project: EDS, Crude metring fixed loop and Turn Down 2009 Shell Ormen Lange Engineering Core Team Project: ME mod, VOC, Sothern field template D and TEG mod Role in Project: Engineering, estimation, monitoring electrical, Business Lunches, as-built, hand-over routing in CABSYS and offshore survey. Show less
-
-
-
TEKNISK BUREAU
-
Stavanger Area, Norway
-
Project Engenieer
-
Aug 2006 - Feb 2007
Tender Projects on shore electro Tender Projects on shore electro
-
-
-
-
Lærer
-
2001 - 2006
KlasseforstanderTeam lederNITO representant
-
-
Lærer
-
2001 - 2006
KuldeteknikkEl energi
-
-
Education
-
Høyskolen i Stavanger
Bachelor, Ped. -
NTNU
NA, ANALYSE AV KORTSLUTNING OG DYN. FORHOLD I INDUSTRI, SKIP OG OFFSHORE INSTALLASJONER -
Stavanger Tekniske Fagskole
Bachelor of scient, Electrical Power