Josselin FIGARD
Project Engineer at IMDC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
French Native or bilingual proficiency
-
Spanish Limited working proficiency
-
Russian Elementary proficiency
-
Dutch Elementary proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Microsoft Office Specialist (excel, word, powerpoint)
MicrosoftDec, 2016- Sep, 2024 -
Certificate Foundation Year Examination
HZ University of Applied SciencesJun, 2015- Sep, 2024 -
Safety for Operational Supervisors VCA (Veiligheid voor Operationeel Leidinggevenden VCA
STE ExamenbureauNov, 2015- Sep, 2024
Experience
-
IMDC
-
Belgium
-
Civil Engineering
-
100 - 200 Employee
-
Project Engineer
-
Apr 2021 - Present
-
-
-
University of Pau and Adour Countries
-
France
-
Higher Education
-
500 - 600 Employee
-
Master Thesis Project
-
Feb 2020 - Sep 2020
"Comparison of empirical and numerical methods in overtopping discharge assessment on a very shallow foreshore beach."Using XBeach non-hydrostatic validated with a laboratory case and empirical formulas from the EurOtop, calculate the overtopping discharge at Grande Plage, Biarritz. The overtopping is calculated for the current situation, for 2050 and 2100 under assumption of climate change following RCP 4.5 and RCP 8.5. With these information analyse the influence of the different parameters and the accuracy of the methods.
-
-
-
HZ University of Applied Sciences
-
Netherlands
-
Higher Education
-
500 - 600 Employee
-
Bachelor Thesis
-
Feb 2019 - Jul 2019
Analysis of the the effects of Sea Level rise on Vlissingen’s primary defense system.Looking at the different RCP's given by the IPCC estimate the sea level rise in the area of Vlissingen and estimate its effect regarding incoming wave forcing on the actual dike defense system. Analysis of the the effects of Sea Level rise on Vlissingen’s primary defense system.Looking at the different RCP's given by the IPCC estimate the sea level rise in the area of Vlissingen and estimate its effect regarding incoming wave forcing on the actual dike defense system.
-
-
-
CAN THO UNIVERSITY
-
Vietnam
-
Education Administration Programs
-
1 - 100 Employee
-
Intern Can Tho University
-
Feb 2018 - Jul 2018
"Plaxis analysis of a sea -dike stability: a case study in Vinh Chau, Soc Trang Province"Searching a solution for the erosion of the sea dike in the Sóc Trăng province in the Mekong Delta. Setting up of different alternative solutions, assess them, design of the new dike and breakwaters, drawing a budget for the operation.Plaxis analysis of the proposed solutions with different wave loading on the structure to minimize flood risk. "Plaxis analysis of a sea -dike stability: a case study in Vinh Chau, Soc Trang Province"Searching a solution for the erosion of the sea dike in the Sóc Trăng province in the Mekong Delta. Setting up of different alternative solutions, assess them, design of the new dike and breakwaters, drawing a budget for the operation.Plaxis analysis of the proposed solutions with different wave loading on the structure to minimize flood risk.
-
-
-
BOUYGUES UK
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Trainee civil works engineer
-
Mar 2017 - Aug 2017
Part of the civil works team in the 88 Lampton road road project phase 1, 168 housing divided in three blocks, responsible of the quality control by the mean of Work Inspection Record, coordination with the supervisors and the work force on site. Contact with suppliers for deliveries of precast, steel and mobile cranes. Part of the civil works team in the 88 Lampton road road project phase 1, 168 housing divided in three blocks, responsible of the quality control by the mean of Work Inspection Record, coordination with the supervisors and the work force on site. Contact with suppliers for deliveries of precast, steel and mobile cranes.
-
-
-
E.Leclerc
-
Canada
-
Retail Groceries
-
1 - 100 Employee
-
Employee
-
2013 - 2016
Filling up shelves of goods in the morning for them to be ready and clean when customers arrive and ensure that the shelves stay full along the day in order to maximize the sales. Filling up shelves of goods in the morning for them to be ready and clean when customers arrive and ensure that the shelves stay full along the day in order to maximize the sales.
-
-
-
EIFFAGE
-
France
-
Construction
-
700 & Above Employee
-
Intern works manager
-
Mar 2014 - May 2014
Topography and record drawings made in addition of different mission regarding the quality control of works. Topography and record drawings made in addition of different mission regarding the quality control of works.
-
-
-
Atelier BOIS et compagnie
-
France
-
Construction
-
1 - 100 Employee
-
Intern labor
-
Mar 2013 - May 2013
Working on a production line in this metallic beam company, responsible for the realisation of cuts of beams behind a machine, and small connection pieces. Working on a production line in this metallic beam company, responsible for the realisation of cuts of beams behind a machine, and small connection pieces.
-
-
-
Ligue judo Champagne-Ardenne
-
France
-
Spectator Sports
-
Coordinator
-
2010 - 2013
During holidays, in charge of the proper conduct of the students throughout the day and the night. In charge of the warm-up before training and some practical content in ne-waza. During holidays, in charge of the proper conduct of the students throughout the day and the night. In charge of the warm-up before training and some practical content in ne-waza.
-
-
Education
-
University of Pau and Adour Countries
Master's degree, Civil and Coastal Engineering -
HZ University of Applied Sciences
Bachelor's degree, Civil Engineering and Coastal protection -
Metropolia Ammattikorkeakoulu - Helsinki Metropolia University of Applied Sciences
Bachelor's degree, Sustainable Building Engineering -
Université de Reims Champagne-Ardenne
DUT, Genie Civil