Josimar Vite

Technical Operations Manager at Advanced Assembly Products, Inc. & Affiliates
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Villa de Reyes, San Luis Potosí, Mexico, MX

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Technical Operations Manager
      • May 2023 - Present

    • Manufacturing Engineer
      • Sep 2017 - Present

      Responsible for launch projects according to APQP, PPAP and Lean practices, Leading operations in plant : Tool Room, Maintenance, Production & Process.o Launch stamping projects as T2 supplier & Manufacturing process in plant.o Share information to Staff ( Quality, Materials & Plant Manager) • Activities to Maintenance,Quality,Materials,Production & Process o Leading to Trial 0-1-2 – Run&Rate o Achieve to Manufacturing goals & targets : Cost, Quality & Deliveryo Management facilities & building maintenances. o Improvement continuous projects o Press balancing & takt time in press o SMED  Waste Analysis. (7 wastes LM)  Improvement continuous  8D´s meetings  5 Why’s meetings  PDCA cycle  Quality issues  Dies outsourcing  NPR & AMEF meetingso Recruitment, development & training of subordinates. o Flow process , Lay Out & expansion plant proposal. Warehouse  Max Capacity (Storage, FG, WIP, ASSY, Press, Facilities)o Instalation & development Plex Software o Budget management o Lean Practice (5´s,JIT,KAN BAN,KAIZEN,SMED)o Home press and balancing  Tooling• Responsible of die design area. • Engineering changes & refurbishment plans o Quotation, Gannt and TryOut. • Preventive Maintenance for dies & equipment in plant. • Following up maintenance Plan in Tool Room according to Production Plan• Report to plant manager the status dies, activities schedule & following up. • Quotation Perishables tools, detail, punches, matrix, PVD coatings.• Development new Suppliers • Hiring to employees (ToolMakers & ToolMaker Supervisor) Maintenance o Review to Maintenance Annual Plano Following up Maintence plan.o Coordinated maintenances to press, feeeders, uncoiling, straightening machines according to releases. o Responsible of back up programs, validation to new sensors. o KAN BAN project to Perishables tools, dies protection. o Hiring to employees (Maintenance technicians) Show less

    • United States
    • Medical Equipment Manufacturing
    • 1 - 100 Employee
    • Manufacturing Engineer
      • Aug 2015 - Sep 2017

      Tier 1. Plastic Injection Automotive Facilities in plant, flow process, capacity & Lay out plant, continuous improvement in line according to manufacturing practices. Facilities. o Greenfield & BrownField according to Plant, Industrial Park, Customer requerimients . o Review the Expansion project with the Supplier, Customer & Staff. o 3D´s Plant according to 20’s weeks production, stock in plant (warehouse, FG, WIP, ASSY, Dining Room, Offices, evacuation routes, Presses, QC, Metrology Lab, Meetings Room and Flow process) o Time & Motion study according the new builing. o Gantt and assignment to activities to diferents areas according to ETA machines & projects o New offices according to parameters construction. o Following up to issues suppliers. (AO system, Electrical energy, furniture, WC, and offices equipment, WIFI) o Assembly lines Design in new buildings o Movement to production lines according to 3D´s model. o Capacity Study according the material releases. o Final Delivery Plant (3 Setps) • Manufacturing o Launch plastic inyection projects as T1 supplier & Manufacturing process in plant.  Assembly lines and services (Network, Electrical Power 110V, 220V, 440V, Air Lines & Workstations)  Welding & ASSY robots.  Flow process in Molding & ASSY. o Labor & Lines balancing o Trial 1-2-3 & Run&Rate o Jigs to compliance the rate production. o Continuous improvement  Tools  Workstation  Flow process  Time & Motio Study.  People  Rate production o New process in plant o Inyection Plastic LPM (Low Pressure Molding) o Gerber machine Installation & set up. (cutter machine o Arrival Presses and coordinated activities. SET UP Presses. o Flow process, Layout Plant and assignment spaces. o WI & standardization process. o Capacitation of process operators in ASSY & Molding o Lean practices (5s,KANBAN,JIT) o VSM o Methodology : 5 Why´s, 8 D´s , Paretos & Ishikawa flow Show less

    • United States
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Process Engineer
      • Jan 2013 - Sep 2015

       Process Enginner Responsible of process plant, according to ergonomic and lean practices, standardization process to new projects in plant. o Responsible of die design area. o Engineering changes & refurbishment plans o Die Set Up Sheets and Reduction set up Time o SMED project • Conveyors • Shakers • Lubrication projects • Continuous improvement in press • Ergonomic study • Reduction Costs • Die protection system o Kan Ban Implementation perishables tools o Plant expansion project o Dies recepcion & liberation • Perishables and details management Show less

Education

  • Ingeniería Mecánica
    Grado en Ingeniería, Ingeniería mecánica
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now