Joshua Owen

Rigger at Beenleigh Steel Fabrications
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Preston Area, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • 360 excavator
    NPORS
  • Advanced level Apprenticeship in Steel Erecting
    ECITB
  • All terrain tellehandler
    NPORS
  • CTC clearance
    -
  • Counter ballance FLT
    -
  • IPAF MEWP licence
    -
  • Loadall tele handler truck
    -
  • NVQ lvl 3 rigging / steel erecting
    ECITB
  • Overhead crane
    NPORS
  • lvl 3 diploma - Fabrication steel erecting
    City & Guilds
  • slinger signaller
    NPORS

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Rigger
      • Jan 2023 - Present

    • Netherlands
    • Staffing and Recruiting
    • 100 - 200 Employee
    • Steel Erector / Conveyor Fitter
      • Sep 2019 - Oct 2022

    • United States
    • Renewables & Environment
    • 300 - 400 Employee
    • Rigger / Steel Erector
      • Mar 2019 - Sep 2019

      Upgrading various National Grid Gas Compressor pumping stations around the Uk Upgrading various National Grid Gas Compressor pumping stations around the Uk

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Steel Erector / Conveyor Fitter
      • Jan 2019 - Mar 2019

    • United Kingdom
    • Mechanical Or Industrial Engineering
    • 500 - 600 Employee
    • Rigger / Steel Erector
      • Jan 2018 - Nov 2018

      Working along side American 'Iron worker's, erecting steelwork, whilst adopting their rigging and safety practices followed by the lifting and installation of filter house panels and components on a new build gas turbine. Working along side American 'Iron worker's, erecting steelwork, whilst adopting their rigging and safety practices followed by the lifting and installation of filter house panels and components on a new build gas turbine.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Steel Erector / Conveyor Fitter
      • May 2017 - Dec 2017

      Erection of conveyor steelwork, belts and components followed by three months Maintenance on the TBM conveyors. Northern line underground extention London. Erection of conveyor steelwork, belts and components followed by three months Maintenance on the TBM conveyors. Northern line underground extention London.

    • Netherlands
    • Staffing and Recruiting
    • 100 - 200 Employee
    • Rigger / Steel Erector
      • Sep 2016 - Dec 2016

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 200 - 300 Employee
    • Rigger / Scrap Burner
      • Jun 2016 - Sep 2016

      June - August 2016 - Becks & Pollitzer Rexam Tin Factory, Berlin Germany Jacking and skating of concrete / steel blocks weighing up to 150 tonne into a location suitable for breaking by excavator. Cutting of a 150tonne oxidiser into 10 sections using oxy fuel gas cutter and then lifting sections out with 200 tonne crane. Cutting of 10 tonne stainless steel tank into scrap using plasma cutter. Use of jacks, skates, FLT, wires, shackles, oxy fuel cutter, plasma cutter, rams, lift plans. Show less

    • United Kingdom
    • Mechanical Or Industrial Engineering
    • 500 - 600 Employee
    • Rigger / Steel Erector
      • May 2016 - Jun 2016

      May - June 2016 - AAF International, National Grid site Nether Kellet gas compressor turbine. Dismantling of exhaust surrounding steelwork / silencer, removal of four 6 tonne exhaust sections and replacing with new stainless sections. Utalising and banking of 150tonne mobile crane, chain blocks, beam clamps, reworking steelwork, lifting beam, slings, shackles. May - June 2016 - AAF International, National Grid site Nether Kellet gas compressor turbine. Dismantling of exhaust surrounding steelwork / silencer, removal of four 6 tonne exhaust sections and replacing with new stainless sections. Utalising and banking of 150tonne mobile crane, chain blocks, beam clamps, reworking steelwork, lifting beam, slings, shackles.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Steel Erector / Rigger
      • Jul 2011 - Feb 2016

      Rigger / erector working on numerous thermal and nuclear power stations across the uk. Rigger / erector working on numerous thermal and nuclear power stations across the uk.

  • Wigan Recycling
    • Wigan, United Kingdom
    • Plant Operator
      • Sep 2010 - Jun 2011

      Civil plant operative - operation excavators, loading shovels, forklifts, tele - handlers and recycling machinery. Civil plant operative - operation excavators, loading shovels, forklifts, tele - handlers and recycling machinery.

Education

  • Leeds City College
    Level 3 diploma, Fabrication steel erecting
    2011 - 2012
  • Southlands High School
    g.c.s.e's, Mathematics, Science, English