Joshua Ellaway
Rope Access Supervisor at Deborah Services Ltd - a SiteServ Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Actavo Hire & Sales
-
United Kingdom
-
Construction
-
100 - 200 Employee
-
Rope Access Supervisor
-
Aug 2015 - Present
Management of rope access team for site;- Carrying out inspection and remedial works to turbine halls and reactor areas.
-
-
-
Total Access (UK) Ltd
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
IRATA L3
-
May 2015 - Jun 2015
Mastic & Cladding Work – City Road Hotel, London• Large amount of high quality mastic work• Installation of cladding panels and louvres to roof and high elevations of building.
-
-
-
-
IRATA L3
-
Apr 2015 - Apr 2015
De-vegetation & Inspection – Box Cutting, Wiltshire• De-veg of over 200m of cutting• Inspection of SSSI stones to determine condition of walls
-
-
-
-
IRATA L3
-
Mar 2015 - Mar 2015
Structural Inspection – Blaenau-Ffestiniog Tunnel,North Wales Assisted in inspection of 150m natural stone vertical shaft to tunnel• Included rigging for rescue and 150m ascent as we were unable to exit the shaft
-
-
-
SUMMIT ROPE ACCESS LIMITED
-
Construction
-
1 - 100 Employee
-
IRATA L3
-
Oct 2014 - Mar 2015
De-vegetation Works – Various Locations, South Wales • Supervised various de-veg teams on contracts around South Wales- De-veg and re-direction of water courses- Large amount of tree-felling and clearance
-
-
-
iMS Access Services Limited
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
IRTA L3
-
May 2014 - Oct 2014
Roof Renovation Project – Center Parcs, Longleat• Supervised team of abseilers to complete all tasks involved in renovating the main dome roof including:- Installation of tension cables, x-beams and boards to construct crash decks including rigging hauling systems and tension lines to move them.- Removal of hundreds of panes of glass from the external roof.- Large scale metal and wood painting requiring rigging of tension lines and re-belays - Installation of hundreds of eyebolts for aid climb access.
-
-
-
Abcas Rope Access
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
IRATA L3
-
Sep 2013 - May 2014
Structural Inspection – Devils Back Bridge, Weston-Super-Mare• Engineer was not IRATA qualified and could not access the bridge, myself and another IRATA technician under my supervision performed the inspection.• Photographic inspection of sides and underneath of bridge, took measurements for replacement stones and inspected for signs of hidden critical elementsGeotechnical Works – Uphill Cutting, Weston-Super-Mare• Completing risk assessments and method statements in relation to various sites.• Liaising with operations managers and site operations crew.• Supervising teams of IRATA level 1&2 abseilers, completing geo-technical works:- Installing over 2500 soil nails using long reaches, terrapin & ripamonti rigs - Installing 1000m of deltax mesh and all intermediate cables- Large scale de-vegetation operations involving several teams
-
-
-
ROCK SOLUTIONS LIMITED
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
IRATA L3
-
Apr 2013 - Sep 2013
Geotechnical Works – Langport, Somerset & Gibraltar• Completed risk assessments and method statements in relation to various sites.• Supervised teams of abseilers to complete geotechnical works including:- Installing over 300 soil nails using DTH rigs and hollow bar drilling- Installed curtain walls of deltax mash on limestone cliff face
-
-
-
ABSEN ROPE ACCESS SPECIALISTS LIMITED
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
IRATA L3
-
Sep 2012 - Nov 2012
Structural Inspection – Industrial Incinerator• Inspection for damage throughout internal structure• Working in confined space in a hazardous environmentGeo-technical Project – Hooley• Supervised teams of abseilers completing geotechnical works: - Installed over 500m of Deltax mesh- De-vegetation
-
-
-
-
IRATA L2
-
Jan 2011 - May 2012
Photographic Tower Inspection – University College London• Inspection of entire structure, tap tested and removed any loose areas.• Photographed any damage, specifically if re-bar was showing. London 2012 Olympic Site Athletes Village - Stratford• Completed over 100 hours of high quality mastic work and sealant application• Installed cladding panels to balconiesGreater London Authority building – Tower Bridge• Re-painted all steel work and walls• Replaced all fabric acoustic panels throughout the building• Rigged and installed 3 television screens of 4x6m on behalf of EDF Energy• Large amount of aid climbing and rigging tension lines and cableways Other works• Mastic work and sealant application• Painting projects• Several photographic tower surveys and condition reports• Pressure washing• Investigation and safe removal of masonry• Bird proofing including netting, spiking and post and wire• Window cleaning• Replaced cladding and glazing• Rigged floodlights and signage• Investigated into water ingress and drainage repairs
-
-
-
Vertical Technology Ltd
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
IRATA L2
-
Oct 2010 - Jan 2011
Jet Washing of internal courtyards. Chemical treatment of concrete. Cutting out and repair of damaged concrete. Painting of internal courtyards.
-
-
-
-
IRATA L1
-
Sep 2007 - Sep 2010
Various structural inspections including towers and internal steelwork. Tested and installed eyebolt a for access. Building maintenance work. Window cleaning.
-
-