Joshua Dukette
Coating Technician at General Industries - Goldsboro, NC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
SSPC C12 Certified Airless Sprayer
SSPC: The Society for Protective CoatingsDec, 2018- Oct, 2024
Experience
-
General Industries - Goldsboro, NC
-
1 - 100 Employee
-
Coating Technician
-
Mar 2015 - Present
As a coating technician with General Industries, there are a plethora of responsibilities I take on related to above and underground storage tanks. • Responsibilities: sandblasting; painting; ACT 100; ACT 100 U; permatanks; acid washing stainless steel tanks; repairing industrial-grade equipment As a coating technician with General Industries, there are a plethora of responsibilities I take on related to above and underground storage tanks. • Responsibilities: sandblasting; painting; ACT 100; ACT 100 U; permatanks; acid washing stainless steel tanks; repairing industrial-grade equipment
-
-
-
Quack Quack phone repair
-
218 Hay St, Fayetteville, NC 28301
-
Technician
-
Jan 2021 - Present
As a technician at QQPR, my primary duty is to perform diagnostics, and repair issues to related hardware and software. Relevant repairs: cell phones, tablets, laptops, desktop PCs, video game consoles, 3D printers. Responsibilities: Greeting and assisting clients, processing sales of services, installing software, troubleshooting hardware or software problems, and repairing electronic devices. As a technician at QQPR, my primary duty is to perform diagnostics, and repair issues to related hardware and software. Relevant repairs: cell phones, tablets, laptops, desktop PCs, video game consoles, 3D printers. Responsibilities: Greeting and assisting clients, processing sales of services, installing software, troubleshooting hardware or software problems, and repairing electronic devices.
-
-
-
-
Glass Installer
-
2012 - 2013
I would build frames that would then have to be installed into the buildings. Then we had to install the doors that led outside. Some sites we had to carry the windows up stairs, which was hard work. Afterwards I would install the windows. We would then put in the finishing products like caulk and anything missing for the doors. At the end of the project we would make sure it's all clean. I would build frames that would then have to be installed into the buildings. Then we had to install the doors that led outside. Some sites we had to carry the windows up stairs, which was hard work. Afterwards I would install the windows. We would then put in the finishing products like caulk and anything missing for the doors. At the end of the project we would make sure it's all clean.
-
-
-
-
Unloader Associate
-
Aug 2010 - Apr 2012
At the beginning of the day we would unload a general merchandise truck, which was a process of two hours to four hours max. If we finished within a two hour period, we would then move on to unloading a grocery truck, then separate the items according to isles. Afterwards they would have us stock freight, then assist customers until lunch. After lunch we would pull general merchandise and groceries to the floor for third shift. Once finished, one person would clean, one person would do inventory/back-stock, and the rest of the members would help third shift with stocking freight and assisting customers. Show less
-
-
Education
-
Rosewood
High School Diploma, Business