Josh Versteeg PENG
Manufacturing Engineer at Viking Cives Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
Viking-Cives Ltd.
-
Canada
-
Machinery Manufacturing
-
1 - 100 Employee
-
Manufacturing Engineer
-
Nov 2018 - Present
-
-
-
Coldstream Concrete
-
Coldstream Ontario
-
Pre-Cast Plant Supervisor
-
Apr 2016 - Oct 2018
-Manage and plan Pre-Cast Daily Production -Develop and utilize quality control strategies and responses -Train new employees -Maintain a high standard of safety -Manage and plan Pre-Cast Daily Production -Develop and utilize quality control strategies and responses -Train new employees -Maintain a high standard of safety
-
-
-
Stoncor Group
-
United States
-
Construction
-
1 - 100 Employee
-
Product Engineer with Fibergrate Canada
-
Oct 2012 - Oct 2015
-Design FRP structures including, work platforms, buildings and safety equipment -Manage CNC operations including scheduling and code writing -Draft approval and shop drawings in Autodesk Inventor -Automate drafting processes using Autodesk's built in iLogic and VB.net addins -Design FRP structures including, work platforms, buildings and safety equipment -Manage CNC operations including scheduling and code writing -Draft approval and shop drawings in Autodesk Inventor -Automate drafting processes using Autodesk's built in iLogic and VB.net addins
-
-
-
General Motors
-
United States
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Production Supervisor
-
Sep 2012 - Oct 2012
-Managed the production and installation of dash boards and head liners on the Impala Equinox line -Mediated employee tensions during layoff and union negotiations -Organized employee placements to maximize production -Provided immediate support and solutions to production issues to minimize loss -Tracked and corrected environmental and quality issues resolving them as they developed -Managed the production and installation of dash boards and head liners on the Impala Equinox line -Mediated employee tensions during layoff and union negotiations -Organized employee placements to maximize production -Provided immediate support and solutions to production issues to minimize loss -Tracked and corrected environmental and quality issues resolving them as they developed
-
-
-
Rob Versteeg
-
Howick Ontario
-
Construction Worker
-
May 2012 - Jul 2012
Removed and constructed a home at the farm site. Nudura ICF foundation followed by wood framing. Worked with pigs assisting in weaning, inoculation, feeding, cleaning and shipping from the farrowing room to market weight. Removed and constructed a home at the farm site. Nudura ICF foundation followed by wood framing. Worked with pigs assisting in weaning, inoculation, feeding, cleaning and shipping from the farrowing room to market weight.
-
-
-
Behrns Metal Fabrication
-
Gowanstown ON
-
Metal Fabricator
-
2009 - 2011
-Built short run product from in house and customer designs -Developed a variety of metal working techniques -Met production deadlines and quality goals -Built short run product from in house and customer designs -Developed a variety of metal working techniques -Met production deadlines and quality goals
-
-
-
Don Gibson Construction
-
Gowanstown Ontario
-
Construction Worker
-
May 2009 - Aug 2009
Built and Renovated Residential and Farm buildings to customer specification in accordance with building code standards Built and Renovated Residential and Farm buildings to customer specification in accordance with building code standards
-
-
Education
-
University of Ontario Institute of Technology
Bachelor of Automotive Engineering (Honours), A