Howard S. Wright, a Balfour Beatty company
-
Construction
-
200 - 300 Employee
-
Project Manager
-
Jan 2021 - Present
Block 216 - a mixed use 35-story high rise containing retail, office, a Ritz-Cartlon Hotel and Condo Residences.
-
-
Project Manager
-
Mar 2018 - Present
Portland Moxy Hotel is a 12-story boutique hotel with 197 rooms sitting on a quarter block at the intersection of SW 10th and Alder. The project is a post-tension structure with brick, metal panels, metal panel and fiberglass windows.
-
-
Project Manager
-
Apr 2017 - Mar 2018
Broadway Tower - high-rise located in the Cultural District will rise 19 stories and include a 180 suite Radisson Red Hotel on floors 2 through 9, with 175,000 sf of Class A office space above.
-
-
-
Turner Construction Company
-
United States
-
Construction
-
1 - 100 Employee
-
SPD Project Superintendent
-
Sep 2016 - Mar 2017
Project Superintendent for a Hospital TI.
-
-
Asst. Estimator
-
Oct 2015 - Sep 2016
Pre-con, Estimating, and Purchasing.
-
-
Asst. Superintendent - Interiors
-
Feb 2015 - Sep 2015
Interior build out of Aster Tower (Block 101).
-
-
Project Engineer
-
May 2013 - Jan 2015
Hassalo on Eighth Apartments: Estimating, Purchasing, Engineering, QA/QC, Budget Management. Purchasing: Garage - Steel, Drywall, Waterproofing, Masonry, Glazing. B92, B100, B101 - Misc. Metals, Glass Canopy, Glazing, Wood Windows, Window Washing Equipment Engineering: Garage - Shoring, Steel, Waterproofing, Masonry, Glazing, Doors & Hardware, Flooring. B101 - Misc. Metals and Window Washing Equipment
-
-
Senior Cost Engineer
-
Dec 2010 - May 2013
Responsible for the cost reporting of all the projects for the Oregon business unit. The cost department provides an outcome of project that was arrived at by an independent review of all sources of information available, status of job, current schedule, contract terms and claims, submitted or anticipated to develop the project’s balance to complete. I am also part of the Finance team that prepares monthly forecasting as it relates to business unit projects of Volume and Earnings.
-
-
Cost Engineer
-
Jan 2009 - Nov 2010
Responsible for servicing the project throughout the design and construction phases by producing budgets, schedule, and site logs as required. As a highly trained customize formats to meet specific reporting needs.
-
-
Project Engineer
-
Mar 2008 - Jan 2009
Engineer on a $160 million hospital. Part of the change management team that processed over $20 million in changes. Reviewed sub pricing, prepared COR's, negotiated with subs and owner, allocated budget holds, allowances, and contingency.
-
-
Asst. Superintendent
-
Aug 2006 - Feb 2008
Asst. Superintendent on a $140 million hospital. Managed subcontractor out in the field. Confirmed QA/QC, tracked schedule, first work inspections, pre-rock inspections, and punchlist.
-
-
-
-
Project Intern
-
Sep 2004 - Sep 2005
Part of the construction team on a $16 million renovation of the historic dormitory Weatherford Hall on the campus of Oregon State University. A LEED Sliver certified project. Updated construction drawings, wrote RFI's, prepared contracts, help with closeout. Part of the construction team on a $16 million renovation of the historic dormitory Weatherford Hall on the campus of Oregon State University. A LEED Sliver certified project. Updated construction drawings, wrote RFI's, prepared contracts, help with closeout.
-
-
Education
-
Oregon State University
BS, Construction Engineering Management