Jose PLATA

Project Manager - Rail Electrification (Tren Maya - Tramo 3) at TRIA INGENIERIA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mérida, Yucatán, Mexico, MX
Languages
  • Español Native or bilingual proficiency
  • French Full professional proficiency
  • Portugués Professional working proficiency
  • English Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Lino Fojo Arias

José Ramón es un profesional con un excelente potencial de desarrollo y largo recorrido, una sólida base técnica, iniciativa y una rica experiencia profesional en su área de especialización, a pesar de su juventud. Muy inteligente e inquieto.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Construction Industry: Going Digital in the Field
    LinkedIn
    Sep, 2022
    - Nov, 2024
  • Construction Management: Planning and Scheduling
    LinkedIn
    Sep, 2022
    - Nov, 2024
  • Dynamo 2.x Essential Training
    LinkedIn
    Aug, 2022
    - Nov, 2024
  • Excel: Introduction to VBA
    LinkedIn
    Aug, 2022
    - Nov, 2024
  • AEO | Level : Practitioner | Electrical – EBEL
    Transport for NSW
    Jun, 2021
    - Nov, 2024
  • Agile Foundations
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • Cert Prep: PMI Agile Certified Practitioner (PMI-ACP)®
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • Cert Prep: Scrum Master
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • Exam Tips: PMI Agile Certified Practitioner (PMI-ACP)®
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • Scrum: The Basics
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • Transitioning from Waterfall to Agile Project Management
    LinkedIn
    Jun, 2021
    - Nov, 2024
  • National Engineering Register
    Engineers Australia
    May, 2021
    - Nov, 2024
  • Chartered Professional Engineer - Electrical Engineering
    Engineers Australia
    Apr, 2021
    - Nov, 2024
  • EUR ING
    FEANI
    Dec, 2020
    - Nov, 2024
  • MTM Competencies | Level : Design & Checker | Electrical – Overhead Wiring (WIP)
    Metro Trains Melbourne
    Sep, 2020
    - Nov, 2024
  • AEO | Level : Expert | Electrical – Overhead Wiring
    Transport for NSW
    Nov, 2017
    - Nov, 2024
  • Work Health & Safety General Construction Induction
    SafeWork NSW
    Nov, 2017
    - Nov, 2024
  • PRINCE2® Foundation
    ILX Group
    May, 2017
    - Nov, 2024
  • DISEÑO Y CÁLCULO DE ESTRUCTURAS DE ACERO SEGÚN EUROCÓDIGO
    Consejo General de Colegios de Graduados e Ingenieros Técnicos Industriales (COGITI)
    Jan, 2016
    - Nov, 2024
  • Advanced Design low voltage(LV) installations
    Consejo General de Colegios de Graduados e Ingenieros Técnicos Industriales (COGITI)
    Sep, 2015
    - Nov, 2024
  • Design and Maintenance Electric Power Transmission Lines (HT/MT) by RD223/2008
    Consejo General de Colegios de Graduados e Ingenieros Técnicos Industriales (COGITI)
    Sep, 2015
    - Nov, 2024
  • miembro
    Colegio Oficial de Graduados e Ingenieros Técnicos de Cádiz
    Aug, 2015
    - Nov, 2024
  • Certified Member
    Electric Energy Society of Australia
    Aug, 2020
    - Nov, 2024
  • Certificate Member
    RTSA - The Railway Technical Society of Australasia
    Aug, 2020
    - Nov, 2024

Experience

    • Spain
    • Railroad Equipment Manufacturing
    • 1 - 100 Employee
    • Project Manager - Rail Electrification (Tren Maya - Tramo 3)
      • Aug 2023 - Present

    • Australia
    • Construction
    • 1 - 100 Employee
    • Construction Area Manager - OLE / OHW / OCS
      • Feb 2023 - Sep 2023

      Key responsibilities:• Responsible and accountable in QCD of all OCS site works, from preparation until completion• Responsible and accountable in planning set-up and on time execution• Method Statements from preparation until validation,• Planning progress follow-up until hand-over,• Site Interface Management with internal and external Stakeholders,• Management of suppliers and subcontractors on site,• Quality management in coordination with QA/QC team• Configuration management until hand-over to T&C.• Construction interfaces with other subsystems (POS team, Trackworks team, signalling team, O&M team, CW team…etc)• Definition of Installation strategy for the OCS construction activities• Lead the Buy/Do decision process for each Site works WP• Constructability reviews with OCS teams• Methodologies development considering all Safety and operation aspects• On Time Delivery (OTD) of all OCS works• Preparation of OCS works, including all logistics aspects,• Management of all correspondences (letters, minutes of meetings, submittals…) related to OCS Construction activities, Show less

    • Senior Project Engineer OLE/OHW/OCS
      • Jan 2023 - Apr 2023

      STEPHENSON AVENUE (H039) EXTENSION :Stephenson Avenue Extension Project will extend Stephenson Avenue from Scarborough Beach Road to Cedric Street, including a new Mitchell Freeway Interchange replacing the freeway interchange at Cedric Street.

    • Senior Project Engineer OLE/OHW/OCS
      • Aug 2022 - Apr 2023

      Key responsibilities :Plan OLE possessions within multi-disciplined passenger rail environmentEntry into service of OLE after construction works.Liaise with sub-contractors and surveyors during OLE constructionCoordinate engineering activities to ensure that project plans are implemented in accordance with designs and specifications.Work with designers to ensure constructability of designs.Assist with the writing of Scope of works and tender documents.Assist with preparation of site construction budgets and reports.Monitor construction progress against program.Manage direct labour and sub-contractors.Managing short term project plans and resource requirements.Implement company and project OHS, QA and Environmental management systems.Provide direction to Site Engineers.Projects :Yanchep Rail ExtensionThe Yanchep Rail Extension will deliver the last proposed section of the Joondalup Line from Butler, 14.5 kilometres north to Yanchep to help support ongoing growth in the area and reduce congestion;Thornlie-Cockburn LinkThe Thornlie-Cockburn Link will be Perth’s first east-west cross line connection, making travel more flexible while providing a higher level of public transport service to Perth’s south-eastern suburbs.Connecting the Mandurah and Armadale-Thornlie lines will open new opportunities for longer-term developments around the new Nicholson Road and Ranford Road stations. Show less

    • Netherlands
    • Professional Services
    • 700 & Above Employee
    • Design Lead Overhead Line Equipment SRE (OLE/OHW/OCS) - (METRONET) MIDLAND JUNCTION ALLIANCE
      • Mar 2022 - Aug 2022

    • Design Lead Overhead Line Equipment SRE (OLE) - (METRONET) TCL-012A & YRE-013A
      • Jul 2021 - Aug 2022

      The Thornlie-Cockburn Link will be Perth’s first east-west cross line connection, making travel around the city by train more flexible and providing a higher level of public transport service to Perth’s southern suburbs. Principal Designer for TCL package.• Design OLE/OCR Engineering solution using supplier information (e.g. stagger arrangements / section lengths / feeding arrangements / support arrangements and mid-point arrangements).• Provide PTA Standard Updates• Writing a Detailed Design Report document for OCR/OLE package.• Undertaken Safety Risk for OCR/OLE Package.• Maintain, develop, and retain the highest standard of OCR/OLE discipline technical skill as applicable to respective rail.The Yanchep Rail Extension will deliver the last proposed section of the Joondalup Line from Butler, 14.5 kilometres north to Yanchep to help support ongoing growth in the area and reduce congestion.Principal Designer for TCL package.• Design OLE Engineering solution according PTA system design.• Provide PTA Standard Updates• Writing a Detailed Design Report document for OLE package.• Undertaken Safety Risk for OLE Package.• Maintain, develop, and retain the highest standard of OLE discipline technical skill as applicable to respective rail. Show less

    • Design Manager - Rail (NIF Project)
      • Jul 2021 - Dec 2021

      • Providing sound and effective leadership on rail projects by providing direction and technical advice• Coordinating delivery of integrated engineering design packages• Identifying and working collaboratively with relevant stakeholders• Identifying system and subsystem interfaces• Development & management of project scope through requirements management activities• Delivery of packages following management of change and engineering change processes.• Ensuring adequate provision, deployment, and management of technical resources• Driving project performance, service delivery and technical and commercial outcomes• Building and maintaining effective relationships with clients and stakeholders and ensuring that client delivery is above expectation. Show less

    • Discipline Lead / Principal Engineer Overhead Contact Line - CYP - Melbourne Metro Tunnel
      • Sep 2020 - Dec 2021

      Cross Yarra Partnership - Metro Tunnel MelbourneThe Metro Tunnel is a metropolitan rail infrastructure project currently under construction in Melbourne, Australia. It includes the construction of twin 9-kilometre rail tunnels between South Kensington station (north west of the Melbourne City Centre) and South Yarra (in the south east) with five new underground stations. The southern portal for the tunnel is to be located to the south of South Yarra station. As a result, the tunnel will connect the Pakenham and Cranbourne lines with the Sunbury line, and allow these lines to bypass Flinders Street station and the City Loop while still stopping in the Melbourne central business district.My responsibilities have involved :-Principal Designer and Reviewer for Metro Tunnel ROCB/OHLE package.-Design ROCB Engineering solution using supplier information (e.g. stagger arrangements / section lengths / feeding arrangements / support arrangements and mid point arrangements).-Provide MTM Standard Updates :L1-CHE-INS-072: Contact Wire Height at PlatformsL1-CHE-STD-013: Metropolitan Railway Stations Clause 11.1L1-CHE-STD-011: Overhead Line Electrification Standard – Technical Note for ROCB.-Development of ROCB System Design Manual to document all relevant Standards applicable for the Metro Tunnel Project. -Writing a Detailed Design Report document for ROCB/OHLE package.-Undertaken Safety Risk for ROCB/OHLE Package.-Maintain, develop and retain the highest standard of ROCB/OHW discipline technical skill as applicable to respective rail constructors/operators/maintainers.-Provide leadership and guidance, maintaining good communication and cooperation with all project team members. Show less

    • Package Leader / Principal Engineer Overhead Contact Line - Yarra Trams (Melbourne)
      • Dec 2020 - Jul 2021

      My design tasks have involved but are not limited to: • Collate relevant XREFs and site survey documentation and bind. • Collate relevant standards to the design specification of the OHW system. • Identify system interfaces. • Develop typical design constraints, maximum span, stagger, radial load, tension. • Locate poles in plan with respect to the identified typical constraints and specification. • Identify which poles will support which wire runs. Adjust where necessary to avoid clashes. • Set staggers of the wire runs. Adjust where necessary to avoid non-conformances. • Confirm staggers through mid-span validation, against blow-off, construction and maintenance tolerances, and dynamic movement of the pantograph. Adjust where necessary to avoid non-conformances. • Confirm in-span wire sag is within tolerance. Adjust where necessary to avoid non-conformances. • Calculate loads applied by suspensions, tension and environmental factors. • Allocate structures based on applied loads and assessment completed by structural engineer. • Allocate structure jewellery base on structure type and suspension requirements. • Review design • Design review with different subsystems (IDC). Adjust where non-conformances are identified. Show less

    • Technical Advisor / Principal Engineer Overhead Contact Line CPRP (Central Precint Renewal Project)
      • Apr 2021 - Jun 2021

    • Principal Contractor (PC) Site Representative
      • Oct 2020 - Apr 2021

      -Conduct the pre-start meeting and confirm first aid and emergency response protocols-Ensure so far as reasonably practicable the health and safety of everyone on site. This includes our people, our subcontractors, all other workers, visitors, the client and the general public. -Assessed as planning tasks (pre site works) and delivery tasks (during site works) -Monitor the works and make sure everything is happening as per the plan by:-Checking in with each work group throughout the course of the shift;-Conducing visual inspections of work areas to makes sure the required controls and permit conditions are in place;-Observing work areas for any hazards that may not be controlled adequately. -Perform routine site and task observations, ensure work is being performed as per the relevant SWMS, ensure correct use of PPE, monitor the use of plant and equipment and make sure relevant risk assessments, registrations and prestart checks are in place.-Ensure relevant permits are in place and are being adhered to inclusive of making sure specific risk controls are in place.-Ensure all incidents, hazards and near misses are reported with appropriate action taken including instigating for cause drug and alcohol testing if required. Show less

    • Principal Engineer OHW , Sydney Metro (Reviewer. AEO Level : EXPERT)
      • Nov 2020 - Mar 2021

    • Australia
    • Design Services
    • 700 & Above Employee
    • OHW Senior Design Engineer - Package Leader OHW/OLE/OCS
      • Feb 2020 - Sep 2020

      Novo Rail is currently delivering the New Intercity Fleet (NIF) Project at Redfern Station. As part of this project, a pedestrian bridge is proposed to link from Platform 10 to Platform 1 to provide easy access for commuters between platforms. To facilitate the construction of the new pedestrian bridge, the current assets require modification and relocation. As part of these works, overhead wiring (OHW) modifications have been identified as early work. A key element in completing and executing the design requires that the Alliance carryout a detailed site investigation and structural condition assessment of all existing OHW structure locations within the boundaries of the Works. As OHW Senior Designer expert on 3D modelling my role has been taken the responsibility to developing OHW 3D Design Workflow and Developing OHW 3D (Inventor Professional/Revit/Dynamo). Show less

    • OHW Senior Design Engineer - Package Leader OHW/OLE/OCS
      • Nov 2019 - Feb 2020

      Britomart East Station (2020) – Auckland, New Zealand Client: City Rail Link /Link Alliance Role: OHW Package Leader/PTA Designer/Checker/Verifier The east end of Britomart Station will need work undertaken to ensure the whole Auckland rail network functions satisfactorily and reliably after CRL opens. The train pattern changes at CRL opening will significantly change how Britomart Station and the east junction (“Throat”) function in the future. The OHW structure equipment has been designed using Furrer and Frey (F+F) Conductor bar design system range for 25kV 50Hz AC system.• I have undertaken CRL Project - PTA OHW lead for Britomart Station- Definition Design (Designer), Detail Design (Checker & Verifier)My design tasks have involved but are not limited to.• Taking the scope requirements for Britomart East Station deliverables applicable to a ROCB package.• Engineering the design solution using supplier information (e.g. stagger arrangements / section lengths / feeding arrangements / support arrangements and mid point arrangements).• Modelling for all aspects of the design in preliminary phase.• Checking and Verifingr all aspects of the design in details phase.Henderson Station (2020) – Auckland, New Zealand Client: City Rail Link /Link Alliance Role: OHW Package Leader/PTA Checker Works at Henderson Station which include a new third platform face are required to be delivered by Easter 2022 to facilitate the Onehunga service as a result of closure of one platform at Britomart Station and to facilitate the new network timetable at the time of CRL opening. The works at Henderson Station are included in the CRL Wider Network Scope. • I have undertaken CRL Project - PTA OHW lead for Henderson StationDefinition Design (Checker & Verifier) Show less

    • Senior OHW Engineer - PLR (Parramata Light Rail)
      • Jul 2019 - Jan 2020

    • OHW Senior Design Engineer
      • Nov 2017 - Jan 2020

      Linewide (2019-2020) – Sydney, Australia Design of Overhead Rigid Conductor System (ORCS) in the tunnel sections between Northern Dive and Southern Dive and the design of OCS in Dive sections. This includes the design of ORCS expansion overlaps, transition between ORCS and OCS, interfacing with conventional OCS on dive sections either side of the tunnel, and sectioning arrangements to meet the operational requirements.•Solid conductor OHW system between the Northern Dive and the Southern Dive, via the Tunnels and Trackways; •Catenary wire OHW system from the Southern Dive to the interface with SSJ Works at the west end of the Southern Dive;•OHW transitions between the solid conductor system and the catenary wire system;•Catenary wire OHW system to connect the SMNW OHW system south of Chatswood Railway Station to the OHW system through the Northern Dive, Tunnels, Trackways and Southern Dive;•Permanent adjustments to the SMNW OHW system, necessary to connect with the OHW system through the Open Northern Dive;•1500V DC feeding arrangements to the OHW. Show less

    • Senior Overhead Wire Engineer
      • Jan 2019 - Nov 2019

    • United Kingdom
    • Rail Transportation
    • 700 & Above Employee
    • Senior Project Engineer - OLE
      • Dec 2016 - Nov 2017

      The project forms part of the Old Oak Common To Paddington Approach Works (OOCPAIEP) which is located on the Great Western Mainline (ELR MLN1) between Paddington Station and Old Oak Common. The existing railway is currently wired with 25kV A.C. Mark 3B auto-tensioned simple equipment, installed in the mid- nineties for Heathrow Express. The existing interference suppression system employs (19/3.25mm) return conductors with booster transformers and the bonding is provided by (19/3.25mm) earth wires since double rail circuits were employed in the signalling system All of the existing wiring and equipment type is Mk3B Auto Tensioned Simple AWAC equipment in accordance with the existing system design and Network Rail approved OLEMI basic design range. Show less

    • France
    • Rail Transportation
    • 700 & Above Employee
    • Electrification Manager - OCS
      • Oct 2014 - Dec 2016

      Responsible for the execution of the OHLE Detail Design as well as the production of the As-Built Documentation.Responsible for the approval of all the design documents; participating in technical meetings with the interface contractors; checking and writing interface documents; leading the CAD operators team to produce the required technical CAD (Microstation and AutoCAD) documentation and providing a first check of produced documents before submission. • Lead internal relevant design reviews/relevant Gate review.• OHLE design proposals for packages of work within existing framework contract• Supervise OHLE civils calculations• Take actions in order to produce all the requested design (on time, at cost and with the requested quality)• Technically assess suppliers’ tender, review FAT, prepare documentation and carry out.• Execute, with the support of CAD operators, a part of the Basic Detail, the Detail Design and the As-Built documentation: Show less

    • OHLE Lead Engineer
      • Jul 2012 - Oct 2014

    • Germany
    • Electric Power Transmission, Control, and Distribution
    • 200 - 300 Employee
    • Product Design Manager Railway product OCL & Traction Substations
      • Jul 2011 - Aug 2012

      PFISTERER is a international company that the main activity is supply caternary for new installations and maintenances of tramway, conventional and high speed contact lines for international and national projects (Spain, Arabia, Israel, Turkey, Ethiopia, México, Perú, Ecuador, Bolivia, Norway, Sweden …..). Development of new products for the railway electrification for international and national projects: tramway catenary, casting and forging cantilever fittings, clamps, compensating devices TENSOREX® C+, safety equipment and tools. • Collaboration in International business development in countries as South Africa and Turkey. • Testing, diagnosing and correcting errors and failures in components before submission. • OHW & Traction Substation product development • Quality process management according ISO 9001, ISO 9004 • Responsible for Technical Team management in order to create 3D models and 2D architecture drawings. • Interface with the clients to get the best technical solution. • Cantilever 25kV AC Catalogue development. Show less

    • Spain
    • Construction
    • 700 & Above Employee
    • OHLE Design Lead Engineer in Oran for Oran Tramway (Flexible OLE 0.75 kV DC)
      • Aug 2008 - Oct 2011

      OHLE Design Engineer in Algeria (Oran Tramway Line)Responsible of OHLE Detail DesignManaging the production of detail design for OHLE (Layout, Pegging Plan, Mounting Diagram, Bridges, Interfaces, Loads...),Support OHLE Technical Manager for Interface and technical issues with other sub-systems within the Consortium (Civil Works, Depot Equipment, Track)

    • OHLE Design Engineer for High Speed Train Barcelona – French Border
      • Apr 2007 - Aug 2008

      OHLE Design Engineer High Speed Line Barcelona-French Border Drafting calculation reports and technical specificationsSupervise OHLE civils calculations, Propose alternative design solution.Execute, with the support of CAD operators, a part of the Basic Detail, the Detail Design and the As-Built documentation: • Ensure optimal OHLE design; ensure that the design is compatible with the highest standards of health & safety. • OHLE basic design (specification, principles, calculation notes, interfaces).• OHLE detailed design (pegging, mounting sheets, calculation, BOQ). Show less

Education

  • Universidad Nacional de Educación a Distancia - U.N.E.D.
    Master en Ingenieria y Mantenimiento Ferroviario - Especialización en Instalaciones Ferroviaria, Transporte ferroviario
    2021 - 2023
  • Quantic School of Business and Technology
    Executive Master of Business Administration - (EMBA), Executive MBA
    2020 - 2022
  • Universidad Nacional de Educación a Distancia - U.N.E.D.
    International Master in Theorical and Practical Application on FEM and CAE Simulation, Analysis of structures, Mechanisms and Dynamics of Fluid Mechanics
    2012 - 2014
  • Universitat Politècnica de Catalunya
    Master en Proyecto, construcción mantenimiento de Infraestructuras e Instalaciones de líneas Ferro., Transporte ferroviario
    2016 - 2018
  • Université de Valenciennes et du Hainaut-Cambrésis
    Bachelor of Science in Engineering, Electrical and Electronics Engineering
    2007 - 2008
  • Universidad de Cádiz
    Bachelor of Science in Engineering, Automation and Industrial Electronics Engineering
    2004 - 2007
  • Universidad Nacional de Educación a Distancia - U.N.E.D.
    Máster en Ingeniería y Mantenimiento Ferroviario (Master in Railway Engineering), Instalaciones ferroviarias de energía - Railway Energy System (Overhead and Traction Power)
    2021 -
  • Universidad de Cádiz
    Bachelor of Science in Engineering, Electrical Engineering
    2005 - 2007
  • Udemy Alumni
    Micro MSc, Railway Systems Engineering
    2021 - 2021

Community