Joseph Stockton

Project Engineering at Tri-Technic, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US
Languages
  • English Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Engineering
      • Jun 2022 - Present

    • Assistant to President
      • 2007 - Present

      http://www.hydrogentechnologiesinc.com/ http://www.hydrogentechnologiesinc.com/

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Quality/Electrical Engineer
      • Jul 2015 - Sep 2020

    • QA/Lab Technician
      • Sep 2010 - Jul 2015

      Lab Technician/Quality Assurance – As Quality Assurance my primary duties are to ensure finished products meet internal and customer specifications, such as ASTM, in accordance with our process developed under ISO 9001:2008 and 13845. Responsibilities consist of: • Incoming (raw) material inspection • Pre and post extrusion checks on plastic resin and final extruded shapes • Verifying material characteristics, dimensional tolerances, and visual appeal • Testing for specific properties using destructive and non-destructive testing techniques with instruments that include: o Instron 4469 for testing mechanical characteristics o FTIR used for material identification and validation o DSC for identifying thermal characteristics o Ultrasound Flaw Detector for examining flaws in finished plastic shapes o Other common lab equipment such as scales, hot plates, and beakers. • Managing all manufacturing QA equipment for calibration record keeping and repair. • Preformed process standardization by developing procedures to meet accreditation requirements to obtain ISO 9001:2008 for International Quality Management Standard and 13845 for Medical Devices Quality Management Systems status. • Root cause analysis to solve customer Return Materials Authorization, (RMA’s) and findings from internal audit.

    • United States
    • Utilities
    • 700 & Above Employee
    • Power Plant Operator & Environmental Specialist
      • May 2009 - Jul 2010

      Power plant operator & environmental specialist – My weekly duties included operation support and environmental inspector/compliance. My primarily duties include general power plant operations, equipment inspections, general maintenance and outage support along with visual inspections and documentation on equipment for electrical, mechanical and structural integrity. Special attention to processes related to, chemical, oil, fuel and waste storage to ensure compliance with Resource Conservation Recovery Act (RCRA), SARA Tile III (Emergency Planning and Community Right to Know) , Hazardous Materials Management Plan (HMMP, onsite consequences, aka Business Plan”) & Risk Management Plan (RMP, offsite consequences) requirements. Other duties include plant mechanics, electrical support.

Education

  • DeVry University's Keller Graduate School of Management-California
    Bachelor’s Degree, Electrical and Electronics Engineering Technology
    2011 - 2018
  • San Joaquin Delta College
    2007 - 2009
  • Weston Ranch High School
    High School
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now