Joseph Stabile
Saftey Professional/Crane Rigger/Signalman at PINNACLE INDUSTRIES II, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
16 Hour Rigging Worker
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
30 Hour Climber/Tower Crane Rigger
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
32 Hour Rigging Worker Supervisor
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
4 Hour Scaffold User
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
62 Hour, Construction Site Safety Supervisor (CSST)
PRO SAFETY SERVICES, LLC -
Confined Space
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
OSHA/Global Harmonized Systems
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND -
SST/OSHA 30
CEMENT AND CONCRETE WORKERS TRAINING AND APPRETICESHIP FUND
Experience
-
PINNACLE INDUSTRIES II, LLC
-
United States
-
1 - 100 Employee
-
Saftey Professional/Crane Rigger/Signalman
-
Jul 2017 - Present
-
-
Advanced Rigger - Crane Signal Man - Local 18a Laborer
-
Jul 2016 - Present
-Responsible for signaling the daily activities of the crane with the crane operator -- organizing the loading and unloading of all construction supplies to various locations on the job site. -Consistently assumed additional responsibilities, including but not limited to, stepping in as rigging supervisor when needed -- kept daily sling log on jobsite according to DOB standards, monitored inventory, and reported damaged rigging to be restocked for each job. -Assisted with the assembly and disassembly of high rise tower cranes with a dedicated crew for Elite Master Riggers.-Involved in morning pre-task meetings with signal crew to delegate the schedule of daily lifts for concrete, steel, lumber, and all necessary materials. -Ensured fall protection and controlled access zones were consistently adhered to in regards to the proper safety and OSHA regulations for each job site.
-
-
-
REGAL USA CONCRETE, INC.
-
United States
-
1 - 100 Employee
-
Crane Signal Man - Local 18a Laborer
-
Sep 2020 - Jan 2021
-Utilized advanced safety knowledge and technical skills for the installation, raising, and disassembly of the DOKA & PERI Cocoon systems. -Loaded and unloaded building materials used for construction by the crane while maintaining a safe working environment conforming to established safety policies and procedures. -Implemented consistent harness fall protection & controlled access zones when responsible for signaling & pulling loads out of the building. -Utilized advanced safety knowledge and technical skills for the installation, raising, and disassembly of the DOKA & PERI Cocoon systems. -Loaded and unloaded building materials used for construction by the crane while maintaining a safe working environment conforming to established safety policies and procedures. -Implemented consistent harness fall protection & controlled access zones when responsible for signaling & pulling loads out of the building.
-
-
-
J&E Industries
-
New York, New York, United States
-
Steel Laborer - Local 18a Laborer
-
Jan 2016 - Jun 2016
-Aided in the steel & rebar erection for NYU Langone Medical Center, Kimmel Pavilion. -Experience with the installation of the reinforced steel/Q-Deck and concrete while adhering to the specific hospital building guidelines. -Involved in the installation of steel & rebar on multiple foundation job sites. -Aided in the steel & rebar erection for NYU Langone Medical Center, Kimmel Pavilion. -Experience with the installation of the reinforced steel/Q-Deck and concrete while adhering to the specific hospital building guidelines. -Involved in the installation of steel & rebar on multiple foundation job sites.
-
-
-
Tutor Perini Building Corp.
-
United States
-
Construction
-
300 - 400 Employee
-
Signal Man - Local 18a Laborer
-
Mar 2014 - Nov 2015
-Tower C in Hudson Yards, 900ft – completed at a LEED Platinum Certification level. -Oversaw the installation of the Mid-State Filigree system & worked directly with their on site liaison to ensure proper execution by following drawings and plans according to deadlines. -Managed a crew of 8 men during installation of Filigree - ensuring they were properly tied off when necessary or working in controlled access zones. -Worked with Doka Wall Formwork in the elevator shaft and erection of the building.
-
-